Industries / Technology / Electronics and semiconductors / Contract electronics manufacturing
Supply chain
This work buys the parts that contract factories build with, from chips to screws, keeps the right amount in stock, and holds the suppliers to agreed rules.
5
Milestones achieved, from 1996 to 2011.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1996
Duty-free trade in IT goods
At the World Trade Organization's first ministerial conference, in Singapore on 13 December 1996, 29 participants concluded the Information Technology Agreement (ITA), under which each removes import duties on about 200 kinds of product, including computers, telecom equipment, semiconductors and most of their parts. Parts and boards covered by it can cross borders between assembly steps without duty. The WTO says the agreement now has 84 participants covering about 97% of world trade in IT products, and in 2015 more than 50 members agreed to add 201 products.
Credit
the 29 original ITA participants, WTO
2000
One fire, two outcomes
In March 2000 lightning started a fire that burned for about 10 minutes at a Philips chip plant in Albuquerque, New Mexico, and the plant needed weeks to recover. Nokia noticed the gap in deliveries before Philips told it, redesigned chips and pressed other suppliers for more; Ericsson had no second supplier for the same radio chips, came up millions of chips short and said it lost at least $400 million in potential revenue.
Lessona part bought from one source can stop a whole product, and Ericsson then set out to buy key parts from more than one source.
Credit
Nokia's supply team under Pertti Korhonen; reported by Almar Latour, The Wall Street Journal
2001
A $2.25 billion parts glut
To get around long waits for parts, Cisco had built up stocks of some components and signed longer-term purchase commitments. When demand fell suddenly it recorded a $2.25 billion charge for excess inventory in the quarter to 28 April 2001, for stock beyond 12 months of forecast demand. Timothy Sturgeon of MIT's Industrial Performance Center wrote that Cisco's buyers had ordered two and sometimes three times what they needed, and that afterwards brands cut back on double ordering while the largest contract manufacturers took on ordering standard parts themselves.
Lessonorders placed to beat a shortage become surplus when demand drops, and someone in the chain has to write the surplus off.
Credit
Cisco (disclosure); Timothy Sturgeon, MIT (analysis)
2004
One code for suppliers
In 2004 a small group of electronics companies, among them major brands and their large direct ("Tier 1") suppliers, founded the Electronic Industry Code of Conduct, a single industry standard on social, environmental and ethical issues to which every supplier would be held. It became the Electronic Industry Citizenship Coalition (EICC) and, in October 2017, the Responsible Business Alliance (RBA), which says it now has more than 600 members and offers shared training, supply-chain mapping and assessment tools.
Credit
the EICC's founding brands and suppliers
2011
One flooded plant, many brands
Floodwater entered Fabrinet's Chokchai campus in Pathum Thani, Thailand, on 22 October 2011 and filled its two manufacturing buildings to about 3.5 feet, and cut roads and power halted production at its Pinehurst campus nearby. Fabrinet, a contract manufacturer of optical and electronic parts, was the main manufacturer for the optical-parts makers Opnext and Oclaro; it made about 30% of Oclaro's finished goods at the two campuses, and Opnext expected a material loss of revenue.
Lessonwhen several brands share one contract plant, one local disaster stops all of them at once.
Credit
Fabrinet (disclosure); reported by optics.org and Semiconductor Today
Watch for
Renewable power at suppliers
Apple says its direct suppliers, which include the contract manufacturers that assemble its products, procured more than 20 gigawatts of renewable energy in 2025 under its Supplier Clean Energy Program, generating more than 38 million megawatt-hours, and its Supplier Code of Conduct requires 100% renewable electricity for all Apple production before 2030. ESG Dive notes that suppliers' electricity is Apple's largest single source of emissions and that Apple's total emissions did not fall from 2024 to 2025.
Achieved whenan independent assurance statement covering the supplier figures is published, or Apple's main assemblers publish audited renewable shares for their Apple production that add up to the claim.
Claimed by
Apple, April 2026
Open
01
Single-source parts in open hardware
A survey of the bills of materials (BOMs, the parts lists) of the 100 most-starred open-source circuit board designs, marking each part line as single-source (only one maker sells a part that fits) or multi-source, and publishing the single-source share for each board.
The briefCredit · unclaimed02
Inventory days, assembler by assembler
A public quarterly series of inventory days (inventory divided by a day's cost of sales) for the ten largest listed contract electronics makers and their largest brand customers, from 2000 to now, built from their filings, with a test of whether rising inventory days came before the write-downs of 2001 and the stock build-ups that followed the 2021 chip shortage.
The briefCredit · unclaimed
Open 01 · the brief
Single-source parts in open hardware
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A survey of the bills of materials (BOMs, the parts lists) of the 100 most-starred open-source circuit board designs, marking each part line as single-source (only one maker sells a part that fits) or multi-source, and publishing the single-source share for each board.
Why it is still open
Tools that score one BOM for single-source and end-of-life risk already exist, such as the BOM Risk Analyzer published on GitHub, but we found no published count across many real designs. Ericsson's shortage in 2000 shows what one single-sourced part can cost.
Built with what exists
GitHub search for KiCad projects; KiCad's command-line tool (kicad-cli) to export BOMs; a parts-search API with free access, such as Nexar (Octopart) or DigiKey's; Python.
First step
Export the BOMs of 10 well-known KiCad boards and mark them by hand to settle the rule.
Done looks like
100 boards, every BOM line marked single-source, multi-source or unknown under a published rule for what counts as a fitting part; a second person re-checks 100 random lines and the disagreement rate is published.
Open 02 · the brief
Inventory days, assembler by assembler
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public quarterly series of inventory days (inventory divided by a day's cost of sales) for the ten largest listed contract electronics makers and their largest brand customers, from 2000 to now, built from their filings, with a test of whether rising inventory days came before the write-downs of 2001 and the stock build-ups that followed the 2021 chip shortage.
Why it is still open
Sturgeon's 2003 account of who paid for the 2001 glut rested on interviews with managers. An open pipeline computes inventory days for Apple alone from SEC data, and we found none that does so across contract manufacturers.
Built with what exists
SEC EDGAR's free XBRL company-facts API for US-listed firms such as Jabil, Flex and Sanmina; Taiwan Stock Exchange filings for Foxconn (Hon Hai), Pegatron, Quanta and Wistron; Python and pandas; an AI model to read the figures from older filings made before XBRL tagging began.
First step
Pull Jabil's and Cisco's inventory and cost of sales from EDGAR and chart their inventory days from 2010.
Done looks like
quarterly series for at least ten companies, every number linked to the filing it came from; a second person re-checks 50 random values; a short published test of how many quarters rising inventory days led each write-down.