Final assembly
This work puts finished boards, cables, screens and batteries into their cases, tests the finished product and packs it, a stage the trade calls box build.
4
Milestones achieved, from 1990s to 2025.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1990s
Cells replace the conveyor
In the early 1990s Sony and Canon took out many of their long assembly lines for electronics, where hundreds of people each did a task lasting seconds, and moved to seru, small cells in which one to five trained workers build a whole product or a large part of one. The cells let a factory switch quickly between the many short-lived models electronics now came in.
Credit
Sony and Canon; described in case studies by Yin, Stecke, Swink and Kaku (2017)
2001
A phone brand stops building
On 26 January 2001 Ericsson said it would hand its whole mobile phone supply chain to Flextronics, a contract manufacturer: its phone plants in Brazil, Malaysia, Sweden, the UK and part of one in Lynchburg, Virginia, with 4,200 employees moving to Flextronics from 1 April. Ericsson kept research, design, sales and marketing, and signed Taiwan's GVC to design and build some models alongside Arima. The Irish Times reported the move the same day.
Lessona brand could keep the design and the customer and leave the building to a specialist.
Credit
Ericsson; Flextronics
2022
One plant stalls a launch
On 6 November 2022 Apple said COVID-19 restrictions had cut output at its main assembly plant for the iPhone 14 Pro and Pro Max, run by Foxconn in Zhengzhou, China, which was "operating at significantly reduced capacity", so it would ship fewer phones and customers would wait longer. CNBC reported that Zhengzhou had been put under lockdown, that workers had been leaving the plant (citing Reuters), and that a JPMorgan analyst counted a 31-day wait for an iPhone 14 Pro ordered from Apple's website.
Lessonwhen one campus does most of a product's final assembly, one local event can delay a whole launch.
Credit
Apple (statement); Foxconn (plant)
2025
Whole racks leave the factory
Final assembly for AI computing moved from single servers to whole racks. TrendForce, a market research firm, reported in July 2025 that shipments of NVIDIA's GB200 racks had ramped up from the second quarter, with Foxconn gaining large orders, Quanta expanding its GB200 and GB300 rack work and Supermicro winning several rack projects, and that liquid cooling was spreading with the racks.
Credit
Foxconn, Quanta and other server makers; NVIDIA (design)
Watch for
Trays without cables
NVIDIA says the compute trays of its Vera Rubin NVL72 rack have no internal cables, fans or hoses and join the rack through blind-mate connectors, plugs that mate as the tray slides in, which it says makes assembly and servicing 18 times faster. StorageReview reports that a compute tray for the earlier GB300 NVL72 took about 100 minutes to assemble.
Achieved whena contract manufacturer building the racks, or an outside reporter on its line, publishes measured tray assembly times.
Claimed by
NVIDIA, January 2026
Humanoids at a test station
AGIBOT, a Chinese robot maker, says its G2 robots load and unload tablets at a test station on a line run by Longcheer, a contract maker of phones and tablets, at 310 units an hour with a success rate above 99.9%, and were ready for production 36 hours after arriving. The technology outlet 36Kr, describing two of the robots at Longcheer's Nanchang plant, gives about 310 tablets an hour per robot, a peak of 316 and a success rate above 99.5% over 8 hours of continuous work, from "on-site measured data".
Achieved whenan outside party publishes a production record of several weeks for the robots, with units handled, stops and every human intervention.
Claimed by
AGIBOT and Longcheer, April 2026
Open
01
Check every step on video
An open, labeled set of videos of people doing the final assembly of one open-hardware electronic product, such as a Raspberry Pi 5 fitted with a fan, an add-on board, cables and a screwed case. Each step is marked, and some builds carry mistakes planted on purpose, such as a missing screw, a cable left unplugged or a part fitted the wrong way round. Then publish how well AI models catch the mistakes.
The briefCredit · unclaimed02
Robot drives the case screws
A low-cost robot arm holding a battery-powered precision electric screwdriver that picks M2.5 screws from a tray and drives the four screws that hold a Raspberry Pi board to the standoffs in its case, followed by a camera check that each screw head sits flat.
The briefCredit · unclaimed
Open 01 · the brief
Check every step on video
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open, labeled set of videos of people doing the final assembly of one open-hardware electronic product, such as a Raspberry Pi 5 fitted with a fan, an add-on board, cables and a screwed case. Each step is marked, and some builds carry mistakes planted on purpose, such as a missing screw, a cable left unplugged or a part fitted the wrong way round. Then publish how well AI models catch the mistakes.
Why it is still open
Public assembly video sets show other products. HA-ViD records people building a "Generic Assembly Box" of 35 standard and non-standard industrial parts. The electronics assembly set that Verbose Tech Labs posts on Hugging Face is a 7-clip sample with no step labels, and the full set is sold. Retrocausal sells camera step tracking that it says runs on an electronics device line in Shenzhen, with its own figures ("-60% quality issues") and no shared test set.
Built with what exists
two or three USB cameras on fixed mounts; CVAT or Label Studio to mark steps; open video-reading AI models such as Qwen2.5-VL and commercial ones through their APIs; the action-segmentation baselines released with HA-ViD; USB power only.
First step
Write the product's step list with photos, choose the 20 mistakes, and record the first 10 builds.
Done looks like
at least 100 recorded builds by at least 10 people, with 20 kinds of planted mistake and every step labeled; at least three models scored on builds they never saw, by the share of planted mistakes caught and the false alarms per build; videos, labels and scoring code under an open license.
Open 02 · the brief
Robot drives the case screws
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A low-cost robot arm holding a battery-powered precision electric screwdriver that picks M2.5 screws from a tray and drives the four screws that hold a Raspberry Pi board to the standoffs in its case, followed by a camera check that each screw head sits flat.
Why it is still open
Assembly Magazine reports that driving screws under 4 mm by machine needs special equipment to feed them, hold them on the bit and limit the torque, and that checking the torque of small screws on the line is "tricky", so factories buy dedicated screwdriving cells. Published tests of the low-cost SO-101 arm use short trials, and a 2026 benchmark of four control policies on it found "execution instability" the main cause of failure. The nearest community recording we found has an SO-100 arm seat a jar lid with half a turn.
Built with what exists
an SO-101 arm with LeRobot (Note: "No download") and an imitation-learning policy such as ACT; a USB-charged precision electric screwdriver with a torque setting, in a 3D-printed mount; a magnetic bit; a 3D-printed screw tray; a Raspberry Pi board and a case with M2.5 standoffs; a USB camera.
First step
Mount the screwdriver on the arm, print the tray, and record 50 remote-controlled screw drives.
Done looks like
50 boards fastened on film, 200 screws in all, with a published tally of screws seated flat, cross-threaded, stripped, dropped or missed, each board checked by hand afterward, and code and training data public.