Inspection and handover
Inspectors check that a building matches its approved plans and the building code, and at handover the builder gives the owner the keys, the certificates and the information needed to run the building.
6
Milestones achieved, from 1667 to 2025.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1667
Surveyors enforce the rules
After the Great Fire of London in 1666, the Act for rebuilding the City required houses of brick or stone, set the number of storeys and the thickness of walls, and was the first to provide surveyors to enforce its rules, by the building historian Jean Manco's account. Other British towns followed, and the Public Health Act of 1875 brought building control by local bylaws under one model.
Credit
the Parliament of England
2007
Handover data, not paper
At handover, owners traditionally received paper manuals and drawings. Bill East of the US Army's Engineer Research and Development Center defined COBie, the Construction-Operations Building information exchange, an open format, usually a spreadsheet, that lists a building's spaces, equipment and products for the people who will run it. By 2010, US federal agencies had specified COBie on contracts for more than two years, though East and colleagues reported that the requirement was often waived during construction.
LessonA data requirement gets waived unless the people on site are shown how to meet it.
Credit
E. William East, US Army Engineer Research and Development Center
2019
Hospital stopped before opening
Five days before the Royal Hospital for Children and Young People in Edinburgh was due to open in July 2019, Scotland's health secretary stopped the move because ventilation in its critical care unit did not meet national guidance. NHS National Services Scotland found the ventilation there inadequate and warned that contamination in the unit could be fatal for patients. Audit Scotland traced the fault to 2012 tender papers that did not match the guidance for critical care, and a "series of opportunities" to catch it over seven years. The fix was expected to add £16 million to a £150 million building, which opened about 20 months late.
LessonRequirements have to be checked against the standard at every stage, not only when the building is finished.
Credit
found by NHS National Services Scotland; reviewed by Audit Scotland
2022
Milestone checks for old towers
On 24 June 2021 part of the Champlain Towers South condominium in Surfside, Florida, collapsed and killed 98 people. In May 2022 Florida's legislature passed a law requiring a structural "milestone inspection" of condominium buildings of three stories or more at 30 years of age, or 25 within three miles of the coast, and every 10 years after. In June 2026 the US National Institute of Standards and Technology (NIST) found the collapse began in the pool deck, and named as primary causes an original design that deviated from the codes of the day and construction that deviated from the drawings.
LessonA building's safety depends on checks long after handover, and on a true record of how it was built.
Credit
Florida Legislature (Senate Bill 4-D); NIST investigation
2023
A regulator approves tall homes
After the Grenfell Tower fire of 2017 (see Finishes), Parliament passed the Building Safety Act 2022. Under it, from 1 October 2023 new high-rise residential buildings, care homes and hospitals in England 18 meters or more high need approval from a new Building Safety Regulator before work starts and again before anyone moves in, and the as-built plans and documents must be handed to the owner. The regulator decided only 16 of 668 applications received by 30 June 2024 within the legal time limit, and refused 270, by government figures cited by the consultancy HKA.
LessonA new checkpoint needs enough trained reviewers before it starts, or it becomes the longest task on the schedule.
Credit
UK Parliament; Building Safety Regulator
2025
One digital permit desk
Singapore's CORENET X brings more than 20 approval steps across seven government agencies into three gateways on one digital system. Its use became mandatory for new projects of 30,000 square meters or more on 1 October 2025, and for all new projects on 1 October 2026.
Credit
Urban Redevelopment Authority and Building and Construction Authority of Singapore
Watch for
AI checks rebuild plans
After the January 2025 wildfires, the City and County of Los Angeles began a pilot in July 2025 of Archistar's eCheck, which reads uploaded plan drawings and checks them against zoning and some building code rules before a person reviews them; the county said results could take up to 10 business days. A March 2026 county presentation carries the claim that it cuts permit time from more than 12 months to under one or two months, and in the same deck county Public Works says the tool cannot yet check structural, energy or mechanical, electrical and plumbing plans, and that it is checking the tool's accuracy.
Achieved whenThe city or county publishes review times and correction counts for plans checked with and without eCheck.
Claimed by
Archistar, with Los Angeles City and County, July 2025 and March 2026
AI plan review at scale
UpCodes says its AI reviewed more than 1,300 plan sets in 73 jurisdictions after its launch in June, from single-family homes to medical buildings, and flagged more than 180,000 potential issues, an average of 21 critical issues a set. It gives no accuracy figure and calls the tool a first pass.
Achieved whenAn outside party compares its findings with plan examiners' corrections on the same plans and publishes how many real problems it caught and how many flags were false.
Claimed by
UpCodes, October 2026
Open
01
Score the AI plan checkers
A public test of AI plan review. Take house or backyard-cottage (accessory dwelling unit, ADU) plans that a city has already approved, plant known code violations in copies, such as a bedroom with no escape window or a stair that is too steep, and score each AI checker on how many it finds and how many false alarms it raises.
The briefCredit · unclaimed02
Asset register from manuals
An agent that reads the equipment manuals and product data handed over at the end of a job and fills the asset register, the COBie sheets listing each piece of equipment with its make, model, serial number, warranty and maintenance tasks, and a public test set to score it.
The briefCredit · unclaimed
Open 01 · the brief
Score the AI plan checkers
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public test of AI plan review. Take house or backyard-cottage (accessory dwelling unit, ADU) plans that a city has already approved, plant known code violations in copies, such as a bedroom with no escape window or a stair that is too steep, and score each AI checker on how many it finds and how many false alarms it raises.
Why it is still open
Los Angeles County says it is still checking eCheck's accuracy and that the tool does not check structural, energy or mechanical, electrical and plumbing plans. UpCodes reports issue counts but no accuracy. This research found no public test set of this kind.
Built with what exists
Approved ADU or house plans whose designers agree to their use; a PDF editor or CAD program to plant errors; the International Residential Code; the AI checkers themselves, and general AI models used as document reviewers (see the Note "Seven more flagged").
First step
Ask two designers whose ADU plans a city has pre-approved for permission to use copies, list 20 violations to plant, and have a working plan examiner confirm that each is a violation.
Done looks like
20 plan sets with 200 planted violations across at least eight code sections, and a published table of violations found and false alarms for each tool, with the answer key released after scoring.
Open 02 · the brief
Asset register from manuals
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An agent that reads the equipment manuals and product data handed over at the end of a job and fills the asset register, the COBie sheets listing each piece of equipment with its make, model, serial number, warranty and maintenance tasks, and a public test set to score it.
Why it is still open
A 2024 paper by Hamada Elshaboury and colleagues notes that building models often carry low-quality, incomplete data that needs extensive manual rework, and it tested extraction from design and construction documents, not a full register checked against one built by hand. COBie's authors reported in 2010 that the requirement was often waived during construction.
Built with what exists
Manufacturers' published installation and maintenance manuals, which are free to download; the COBie spreadsheet format; a general AI model used as a document reader (see the Note "Seven more flagged"); Python.
First step
Write the equipment list for a small office (air handler, boiler, pumps, fans, water heater), download the manuals, and fill the first 100 fields by hand.
Done looks like
A mock handover package of at least 50 real product manuals for one building, a hand-built register of at least 1,000 fields, and a published field-by-field accuracy for the agent.