Industries / Mining and materials / Cement and concrete
Precast
Precast concrete is cast in a factory into finished pieces, such as floor slabs, wall panels, beams, poles and pipes, which are cured there and shipped to the site to be fitted.
5
Milestones achieved, from 1928 to 2023.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1928
Prestressing patented
In pretensioning, steel wires are stretched before concrete is cast around them; when released, they squeeze the concrete so it can carry more load without cracking. On 2 October 1928 Eugène Freyssinet and Jean Séailles applied for French patent 680,547 on a process for making precast beams, pipes, sleepers and poles this way. Freyssinet then made electricity poles at the Forclum plant in Montargis, using steam curing to speed up hardening. By the account of Xercavins, Demarthe and Shushkewich, the plant was a technical success and a commercial failure because of the Depression, and Freyssinet lost his fortune in five years.
LessonA factory process can work and still fail as a business when demand collapses.
Credit
Eugène Freyssinet and Jean Séailles
1961
Slabs squeezed from a machine
Hollow-core slabs are prestressed floor planks with long round voids that cut their weight. In July 1961 Canada granted Ellis and Thorsteinson a patent for a machine that extrudes them: augers, or screw conveyors, force very stiff concrete through a moulding section while a vibrator compacts it, and the pressure pushes the machine forward along the casting bed. Glen Booth of Spiroll Corporation, Canada, applied in 1965 for a patent on improvements. The first extruded units were 200 and 265 mm thick and 1,200 mm wide, and Spiroll sold its machines with a yearly fee per square metre of slab produced.
Credit
Ellis and Thorsteinson; Glen Booth and Spiroll Corporation
1968
Ronan Point
On 16 May 1968 a gas explosion in an 18th-floor flat of Ronan Point, a new 22-storey council tower in Canning Town, London, pushed out a load-bearing wall panel, and one corner of the building collapsed floor by floor. Four people were killed and 17 injured. The tower was built from factory-made concrete wall and floor panels joined without a structural frame, in a Danish system developed in 1948 for buildings of about six storeys. The fifth amendment to the UK building regulations, in 1970, required buildings over four storeys to stay standing if a defined wall or member were removed, or else to design that member to resist a pressure of 34 kN/m².
LessonPanels must be tied together so that losing one piece does not bring down the floors above.
Credit
The Griffiths inquiry (1968); analysed by Cynthia Pearson and Norbert Delatte (2005)
2016
A national prefab target
On 27 September 2016 China's State Council General Office issued a guideline to promote prefabricated concrete and steel buildings, and modern timber buildings where suitable. It set the aim that prefabricated buildings reach 30% of new building floor area in about ten years, starting with the Beijing-Tianjin-Hebei, Yangtze River Delta and Pearl River Delta city regions. By the count of the housing ministry's Housing Industrialization Promotion Center, as reported by China National Radio, work began in 2019 on 420 million m² of prefabricated buildings, about 13.4% of new building floor area, after average growth of 55% a year over four years. The count includes steel and timber buildings as well as concrete.
Credit
General Office of the State Council of China (document Guobanfa [2016] No. 71); China's precast makers and builders
2023
RAAC closes schools
Reinforced autoclaved aerated concrete (RAAC) is a light, bubbly concrete cured in high-pressure steam ovens and cast with steel into planks, used mostly for flat roofs in British buildings from the 1950s to the mid-1990s. The Department for Education (DfE) calls it considerably weaker than traditional concrete and beyond its estimated service life. In May 2019 the Standing Committee on Structural Safety warned of a RAAC roof that collapsed in a working school, suddenly and with no apparent warning. After new cases in summer 2023, the DfE changed its guidance on 31 August 2023: 147 schools and colleges had confirmed RAAC as of 30 August, and by February 2024 the count was 234 of England's 22,000.
LessonPanels that looked sound failed without warning, so the DfE chose to remove RAAC from schools rather than monitor it.
Credit
Department for Education; Standing Committee on Structural Safety
Watch for
A part in three hours
Ruhr University Bochum opened CREATE, a cell of three industrial robots built with the maker BT Innovation, on 15 July 2026. Each robot picks from 13 tools; together they set adjustable formwork, place and weld or tie the steel, fill the form, and move the piece to an oven at 80 °C for about two hours. The university says a finished, fully cured, load-bearing and quality-tested part comes out in three hours, against three to five days before forms come off in usual practice.
Achieved whenan outside party measures the cycle time and the strength of parts from a production run, or a precast plant uses the method in regular work.
Claimed by
Peter Mark and David Sanio, Ruhr University Bochum, July 2026
Open
01
Count RAAC panel failures
A public, sourced record of every reported RAAC panel failure, in the UK first and elsewhere where RAAC was used, with date, building type, panel age, span, maker where known and the cause found, kept as an open spreadsheet with a form for engineers to add cases.
The briefCredit · unclaimed02
Measure strand slip by camera
A camera check, used after hollow-core slabs are sawn to length and moved to storage, that measures how far each prestressing strand has slipped into the slab end, and logs it against the slab's casting record.
The briefCredit · unclaimed
Open 01 · the brief
Count RAAC panel failures
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public, sourced record of every reported RAAC panel failure, in the UK first and elsewhere where RAAC was used, with date, building type, panel age, span, maker where known and the cause found, kept as an open spreadsheet with a form for engineers to add cases.
Why it is still open
A 2025 report for the UK Health and Safety Executive, by WSP, estimates 1.3 to 4.4 million RAAC panels in England and says about one panel a year is publicly reported as collapsing. It states: "We do not know how many additional collapses are occurring which are not publicly reported." Its collapse-rate estimate rests on that count.
Built with what exists
Public alerts and reports from the Standing Committee on Structural Safety and its successor CROSS-UK; DfE and NHS publications; local news archives; Python; a language model to pull fields out of reports, with a person checking each record (see the Note "Seven more flagged").
First step
List every RAAC failure mentioned in the HSE report RR1213, the DfE identification guidance and the 2019 safety alert, with a link for each.
Done looks like
Every case cited in the HSE, DfE and safety-committee reports, plus any others found, each with at least one source, and WSP's collapse-rate figure recalculated from the new count.
Open 02 · the brief
Measure strand slip by camera
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A camera check, used after hollow-core slabs are sawn to length and moved to storage, that measures how far each prestressing strand has slipped into the slab end, and logs it against the slab's casting record.
Why it is still open
Strand end slip is the indirect check that the strands grip the concrete over a short enough length, and the European standards for hollow-core slabs, EN 1168 and EN 13369, use it for production control, by the account of Tur and Fic (2013). Searches of Crossref and GitHub for this brief found no published camera system for the job.
Built with what exists
A phone or industrial camera; printed ArUco markers, square patterns that let software find scale and position; OpenCV and Python.
First step
With a plant's permission, photograph 50 slab ends in storage next to a printed scale and compare the photos by hand with the plant's own slip records.
Done looks like
Camera readings on at least 500 strand ends at one plant, each compared with a gauge reading by plant staff, with the mean difference and the share within 0.5 mm reported.