Industries / Retail, hospitality and personal services / Hospitality and tourism / Wedding and events
Sound, light and staging
This work makes speeches, bands and toasts heard and seen across a room or a field: microphones, loudspeakers, lighting and its controls, rigging, temporary stages and roofs, and video screens, put up and taken down safely.
7
Milestones achieved, from 1915 to 2020.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1915
Loudspeakers reach a crowd
On Christmas Eve 1915, Peter Jensen and Edwin Pridham's loudspeaker and amplifier carried a carol concert on the steps of San Francisco City Hall to a crowd that the trade site ProSoundWeb estimates at 100,000. ProSoundWeb calls it "the first recorded example of an electric PA system being used to amplify a musical concert". The two men went on to form Magnavox in 1917.
Credit
Peter L. Jensen and Edwin Pridham
1969
Sound for a festival field
For Woodstock, Bill Hanley's company built speaker towers, the highest 70 feet (about 21 m) tall, driven by more than 10,000 watts of tube amplifiers under the stage. By Hanley's account the organizers expected 150,000 to 200,000 people, and about 400,000 came.
LessonThe system was planned for the crowd expected and had to serve about twice as many.
Credit
Bill Hanley, Hanley Sound
1981
Lights that move on cue
Showco's Vari-Lite system made its debut on the opening night of Genesis's Abacab tour, in a bullring in Barcelona, with 50 VL1 lights that a computer console could aim and recolor during the show. A Vari-Lite sales executive later said concerts had needed up to 3,000 lights, each focused and colored by hand.
LessonThe first automated lights broke down often; their inventor recalled "a Vari*Lite hospital backstage" and that "it was rare to finish a show with every light still running".
Credit
Showco (Rusty Brutsché and Jack Maxson) and its engineer Jim Bornhorst, with investment from Genesis
1990
One control signal for lights
The US Institute for Theatre Technology (USITT) published DMX512/1990, a shared digital signal that lets a lighting desk from one maker run dimmers and lights from another. ESTA, the entertainment technology standards body, published it as the American national standard E1.11 in November 2004, and in May 2009 added E1.31, often called sACN, to carry it over computer networks; a revision published in January 2026 adds support for IPv6.
Credit
USITT's Engineering Commission; ESTA
2011
A stage roof falls
On 13 August 2011, wind brought down the temporary roof over the stage at the Indiana State Fair before a Sugarland concert, and seven people died. The engineering firm Thornton Tomasetti found in April 2012 that the rigging did not meet the state code's requirement to withstand gusts of 68 mph (109 km/h); gusts that night were estimated at 59 mph (95 km/h). ESTA's standard for such roofs, E1.21, had existed since May 2006; it was revised in December 2013, and ESTA says its 2024 edition is referenced by the 2024 International Building Code and International Fire Code.
LessonThe roof fell in a gust below the state's design figure because it was built weaker than the code required.
Credit
Thornton Tomasetti (Scott Nacheman) for the investigation; ESTA for the standard
2017
Charges stayed for delay
On 16 June 2012 a stage collapsed at Downsview Park in Toronto before a Radiohead concert, killing the band's drum technician, Scott Johnson. Live Nation, Optex Staging & Services and the engineer who designed the stage faced 13 charges under Ontario health and safety law; after a mistrial, the charges were stayed in September 2017 under the Supreme Court of Canada's Jordan ruling on trial delays. An inquest in 2019 heard that the stage had been built differently from its engineered plans in several significant ways.
LessonWhen a case runs out of time, no one answers for the failure; CBC wrote that "no one has taken responsibility".
Credit
Ontario Court of Justice, for the ruling; the 2019 coroner's inquest
2020
Wireless mics lose a band
After the US Federal Communications Commission's auction of broadcast airwaves closed on 13 April 2017, the 600 MHz band (617 to 652 MHz and 663 to 698 MHz) went to new wireless services, and wireless microphones had to stop using it by 13 July 2020.
LessonEvent audio uses radio spectrum it does not own, and a regulator can give it to others.
Credit
US Federal Communications Commission
Watch for
AI assistants run a mixer
Violet Audio added a built-in Model Context Protocol (MCP) server, a standard way for AI assistants to operate other software, to its dMix 128 digital mixer, so that an operator can ask an assistant such as ChatGPT or Claude to mute a microphone, raise "the lectern microphone by 2 dB" or recall a saved setup. The announcement gives no test results.
Achieved whenA report not written by Violet describes the feature in use at real events, or an independent test reports how often the assistant does what it was asked.
Claimed by
Violet Audio, July 2026
Mobile operators eye mic airwaves
The GSMA supports mobile use of the 470 to 694 MHz band, which wireless microphones use across Europe, Africa and the Middle East, and asks for a new agenda item on the band at the 2031 World Radiocommunication Conference. The 2023 conference kept broadcasting as the band's main use and gave mobile a lower priority, which, by the policy firm Access Partnership's account, equals that of event and production equipment such as wireless microphones. The next conference meets from 18 October to 12 November 2027 in Shanghai.
Achieved whenThe conference's final acts, published after 12 November 2027, add countries to the band's mobile footnotes or open a 2031 agenda item on it.
Claimed by
GSMA, October 2026
Open
01
Cue lists from running orders
A test of whether AI agents can turn an event's running order, the minute-by-minute script of who speaks and what plays when, into a working lighting and sound cue list. For each running order (a conference session, an awards night, a wedding reception), a human programmer writes the reference cue list. The agent writes its own in open lighting software and plays it on a small rig of low-voltage LED lights standing on the floor, and each cue is scored on whether it fires at the right line and looks as the reference does.
The briefCredit · unclaimed02
Forecast and measured stage wind
A public dataset that pairs forecast wind gusts with gusts measured at stage-roof height at outdoor events, so organizers can see how often forecasts fall short of what hits their structures. Work with festivals that already log both, or with a production team that mounts a sensor on its own structure. The project only collects data and makes no calls about any live event.
The briefCredit · unclaimed
Open 01 · the brief
Cue lists from running orders
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A test of whether AI agents can turn an event's running order, the minute-by-minute script of who speaks and what plays when, into a working lighting and sound cue list. For each running order (a conference session, an awards night, a wedding reception), a human programmer writes the reference cue list. The agent writes its own in open lighting software and plays it on a small rig of low-voltage LED lights standing on the floor, and each cue is scored on whether it fires at the right line and looks as the reference does.
Why it is still open
LacyLights, an open-source project, already lets an AI assistant draw cue lists from theater scripts and play them, but reports no comparison with a human designer. Skip-BART (2025) predicts stage lighting from music and reports "only a limited gap" to lighting engineers, but works from songs, not event scripts. This research found no published test of AI cue lists for events.
Built with what exists
QLC+ or the Open Lighting Architecture to drive lights over DMX or sACN; LacyLights' MCP server; AI agents that call tools, each running order run 20 times and scored on passing every time (see the Note "All twenty times").
First step
Write one 30-minute conference running order, program its cue list by hand in QLC+, and ask one agent to do the same.
Done looks like
At least 20 running orders, each run 20 times on at least three agents, with a public table of the share of cues that fire at the right line and match the reference look within set limits, and video of the best and worst runs.
Open 02 · the brief
Forecast and measured stage wind
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public dataset that pairs forecast wind gusts with gusts measured at stage-roof height at outdoor events, so organizers can see how often forecasts fall short of what hits their structures. Work with festivals that already log both, or with a production team that mounts a sensor on its own structure. The project only collects data and makes no calls about any live event.
Why it is still open
Yourope, the European festival association, published a wind procedure in January 2026 that uses both forecast and measured gusts as triggers and asks organizers to log the data sources behind each decision. The Indiana State Fair roof fell in gusts estimated at 59 mph. This research found no published comparison of forecast and measured gusts at event stages.
Built with what exists
Ultrasonic anemometers and data loggers; free forecast archives from services such as Open-Meteo; Python for the comparison.
First step
Ask one festival with an on-site anemometer for last season's wind log and line it up against archived forecasts.
Done looks like
At least 1,000 hours of paired forecast and measured readings from at least 15 events on at least three kinds of site (open field, hilltop, city), with a public table of how often the measured gust beat the forecast gust by more than 10 km/h at forecast lead times of 1, 6 and 24 hours.