Milling crushes mined ore, dissolves the uranium out of it in tanks of acid or alkaline solution, and recovers it from the solution as a dry uranium oxide concentrate called yellowcake.

6

Milestones achieved, from 1953 to 2024.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1953

    Resin columns recover uranium

    In ion exchange, a uranium-bearing solution flows through columns of synthetic resin beads that hold the uranium until a stronger solution washes it off in concentrated form. In 1953 the first commercial plants to use column ion exchange began operating in South Africa, and the Shiprock mill in New Mexico, opened in 1954, was the first in the United States, by the account of Frank McGinley of the US Atomic Energy Commission in 1958.

    ugspub.nr.utah.gov

    Credit

    South African uranium plants; the Shiprock mill

  2. 1956

    Solvent extraction enters mills

    In solvent extraction, uranium moves from the watery leach solution into a kerosene-based liquid that does not mix with water, and is then stripped out in pure form. Around 1950 the Raw Materials Section of Oak Ridge National Laboratory searched for chemicals that would pull uranium from sulfuric acid leach solutions and found two families, giving the Dapex and Amex processes, which "eventually dominated domestic uranium production" and spread worldwide, by Charles Coleman and Rex Leuze's 1978 account. McGinley wrote in 1958 that solvent extraction was first run continuously at the Shiprock mill in September 1956.

    osti.govugspub.nr.utah.gov

    Credit

    Oak Ridge National Laboratory; Kerr-McGee (Shiprock mill)

  3. 1988

    Uranium as copper by-product

    Olympic Dam in South Australia, a joint venture of Western Mining Corporation and BP Minerals, began operating in 1988 about 350 meters underground in what the World Nuclear Association calls the largest known uranium orebody in the world. The mine produces copper, with uranium and gold as by-products. About 80% of the uranium is recovered by acid leaching of the waste left after the copper minerals are floated off, and most of the rest by leaching the copper concentrate, which still holds up to 0.15% uranium, so the copper is smelted on site.

    LessonUranium left in a main product can decide where that product has to be processed.

    world-nuclear.org

    Credit

    Western Mining Corporation; BP Minerals; BHP (owner since 2005)

  4. 1998

    Fertilizer uranium stops paying

    Phosphate rock holds traces of uranium, and plants can recover it by solvent extraction from the phosphoric acid made for fertilizer. Eight such US plants operated from the 1970s, six in Florida and two in Louisiana, and from 1981 to 1992 central Florida's by-product output averaged just over 1,000 tonnes of uranium a year, up to 20% of the US total, by the World Nuclear Association's account. Production then fell sharply and ended in 1998, when it became uneconomic. A newer ion exchange process, PhosEnergy, recovered more than 92% of the uranium in a ten-week US demonstration to May 2014, but its backers curtailed spending in 2019 because uranium prices were low.

    LessonBy-product uranium comes and goes with the uranium price, however large the resource.

    world-nuclear.org

    Credit

    US phosphoric acid producers

  5. 2014

    A mill for undiluted ore

    Orano Canada's McClean Lake mill in northern Saskatchewan processes ore from Cameco's Cigar Lake mine without diluting it first, which Orano calls unique. The ore averages 15% uranium oxide, the world's highest grade by Orano's account, and is mixed into a slurry at the mine and trucked to the mill. Cigar Lake was commissioned in 2014 and began commercial operation in May 2015, by Cameco's account, and Orano reports a record 19.8 million pounds of uranium oxide from the mill in 2025, against a capacity of 24 million pounds a year.

    orano.groupcameco.com

    Credit

    Orano Canada (McClean Lake mill); Cameco (Cigar Lake mine)

  6. 2024

    A mothballed mill restarts

    Langer Heinrich in Namibia, an open pit with a conventional mill that leaches with an alkaline solution, began production late in 2006 and reached 2,000 tonnes of uranium a year of capacity from late 2011, with 84.5% recovery in late 2014. Low prices put it on care and maintenance, kept idle but ready to restart, in August 2018. Production resumed in March 2024, and the ramp-up to full mining and processing was completed by the end of June 2026, by the World Nuclear Association's account; Paladin Energy reports the ramp-up completed in its 2026 financial year.

    LessonBringing an idle mill back to full output took more than two years.

    world-nuclear.orgpaladinenergy.com

    Credit

    Paladin Energy

Watch for

  1. Rare earths at White Mesa

    Energy Fuels says it produced its first kilogram of dysprosium oxide, a rare earth used in permanent magnets, at pilot scale at its White Mesa uranium mill in Utah, at 99.9% purity against a 99.5% commercial specification, from monazite sand mined in Florida and Georgia. It planned large-scale separation of dysprosium, terbium and other heavy rare earths at the mill by late 2026.

    Achieved whenan independent laboratory or a buyer confirms the purity, and the mill reports output at commercial scale.

    miningweekly.com

    Claimed by

    Energy Fuels, August 2025

Open

  1. 01

    Acid and water per kilogram

    An open table giving, for every operating uranium mill and leaching-in-place plant, the acid, oxidant, water and energy used and the share of uranium recovered, per kilogram of uranium produced, with each figure linked to the page of the company or technical report it came from.

    The brief
    Credit · unclaimed
  2. 02

    An open uranium mill model

    A free, open-source process model of an acid leach uranium mill, covering leaching, separating liquid from solids, ion exchange or solvent extraction, and precipitation, that computes uranium recovery and reagent use and is checked against published figures from real plants.

    The brief
    Credit · unclaimed

Open 01 · the brief

Acid and water per kilogram

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table giving, for every operating uranium mill and leaching-in-place plant, the acid, oxidant, water and energy used and the share of uranium recovered, per kilogram of uranium produced, with each figure linked to the page of the company or technical report it came from.

Why it is still open

Gavin Mudd and Mark Diesendorf compiled energy, water and carbon figures for uranium mines and mills in 2008 and found "significant gaps" in sustainability reporting; Mudd's 2014 update covered resources, production, energy and greenhouse gas intensity, not reagents. For acid, the World Nuclear Association gives only a "general figure" of about 40 kg per kg of uranium for Kazakh mines, with other figures up to twice that, even though acid supply cut Kazakhstan's 2025 plans by 5,000 tonnes. A search for this brief found no plant-by-plant table of acid use.

doi.orgdoi.orgworld-nuclear.orgworld-nuclear-news.org

Built with what exists

Technical reports filed under Canada's NI 43-101 on SEDAR+, ASX announcements, US S-K 1300 technical report summaries on SEC EDGAR, company sustainability reports; AI models that read documents, such as Claude or Gemini, to find figures and record their page; Python with pandas.

  1. First step

    Download the latest technical reports for five leaching-in-place operations and record each one's stated acid use per kilogram of uranium.

  2. Done looks like

    At least 25 operations in at least six countries, each figure linked to its page, with a second person checking a random 10% of figures and the error rate published.

Open 02 · the brief

An open uranium mill model

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A free, open-source process model of an acid leach uranium mill, covering leaching, separating liquid from solids, ion exchange or solvent extraction, and precipitation, that computes uranium recovery and reagent use and is checked against published figures from real plants.

Why it is still open

Australia's nuclear science agency, ANSTO, builds uranium mass and energy balances in commercial software and in-house packages. The University of Idaho's GEMS simulator was applied to uranium processing in a 1980 paper, but no public code for it was found. PrOMMiS, an open modeling library for critical mineral and rare earth processing, has leaching, solvent extraction and precipitation models, but a GitHub code search of it for "uranium" returns nothing.

ansto.gov.aulink.springer.comgithub.com

Built with what exists

PrOMMiS and the IDAES process modeling platform it builds on; PHREEQC for solution chemistry; published plant figures, such as Langer Heinrich's 84.5% recovery in late 2014.

prommis.readthedocs.io

  1. First step

    Install PrOMMiS, run its rare earth leaching example, and replace the reactions in one leach tank with uranium's sulfuric acid leach reactions.

  2. Done looks like

    A model under an open license that reproduces reported recovery within 3 percentage points and reported acid use within 15% for at least three mills, with every input and its source published.