Conventional mining

Conventional mining digs uranium ore out of open pits or underground workings and sends it to a mill, while keeping miners' exposure to radon gas and gamma rays low.

7

Milestones achieved, from 1879 to 2014.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1879

    Schneeberg lung disease described

    Ore at Schneeberg in Saxony and Jáchymov (Joachimsthal) in Bohemia was mined for centuries for metals and, later, for uranium dyes, and miners there died of a lung disease called Bergkrankheit, "mountain sickness". In 1879 F. H. Härting and W. Hesse reported it in detail as lung cancer and put it behind 75% of miners' deaths, an estimate later follow-up cut by about a third. In 1930 the Czechoslovak Ministry of Public Works began ventilating the Jáchymov mines, which was reported to cut radon from 0.32 to 8.9 working levels (a measure of radon's decay products in air, explained below) to under 0.35.

    pmc.ncbi.nlm.nih.gov

    Credit

    F. H. Härting and W. Hesse; Czechoslovak Ministry of Public Works

  2. 1946

    Mining for the Soviet bomb

    In April 1946 Soviet-led teams mined their first uranium at Johanngeorgenstadt and Oberschlema in Saxony, 17.2 t that year. Their operation, which became SAG Wismut in 1947 and the joint Soviet and East German SDAG Wismut in 1954, employed about 200,000 people at its 1950–51 peak, and the first Soviet atomic bomb, tested in 1949, used uranium from these Ore Mountains, by Wismut's account. Output peaked at 7,110 t of uranium in 1967, and planned production ended on 31 December 1990.

    wismut.de

    Credit

    SAG Wismut and SDAG Wismut

  3. 1967

    A federal radon limit

    From 1948 the US Atomic Energy Commission guaranteed to buy all uranium ore mined in the country, and at the peak of the boom that followed, centered on the Colorado Plateau, about 750 mines were working in the mid-1950s. The US Public Health Service began studying the miners in 1950; William Bale and John Harley showed by 1951–52 that radon's short-lived decay products, lodged in the lung, deliver most of the dose, and from their work came the working level, a measure of the energy those products in a liter of air will release. In September 1967 the Federal Radiation Council advised that no miner receive more than 12 working level months (WLM, one working level breathed for 170 working hours) in a year, and a standard of 0.3 working levels, about 4 WLM a year, took effect on 1 January 1969, by Brugge and Goble's account.

    LessonFor up to two decades after the hazard was known, US miners worked without federal protection; an estimated 500 to 600 who worked between 1950 and 1990 died of lung cancer, most from radon, and Congress passed the Radiation Exposure Compensation Act in 1990.

    pmc.ncbi.nlm.nih.gov19january2021snapshot.epa.gov

    Credit

    US Public Health Service (Duncan Holaday, Victor Archer); William Bale and John Harley; Federal Radiation Council

  4. 1974

    Elliot Lake miners walk out

    In 1974 uranium miners in Elliot Lake, Ontario, members of the United Steelworkers, staged a wildcat strike, one without union approval, over injuries, silicosis and lung cancer. Premier William Davis set up a royal commission chaired by the engineering professor James Ham, whose more than 100 recommendations became the basis of Ontario's Occupational Health and Safety Act, in force for all industries from the fall of 1979, CIM Magazine reports.

    LessonBecause uranium was under federal control, the new act did not at first cover the Elliot Lake miners whose strike had prompted it; the union won its provisions through collective agreements instead.

    magazine.cim.org

    Credit

    Elliot Lake miners and the United Steelworkers; James Ham

  5. 1976

    Low-grade ore, giant pit

    Rössing, in Namibia's Namib Desert, has been mined since 1976 as a large open pit in very hard rock. Its reserves at the end of 2018 graded 0.033% uranium, by the World Nuclear Association's figures, against an average of 6.48% U3O8 at Canada's McArthur River at the end of 2025, so each tonne of uranium means moving far more rock. Rio Tinto developed the mine; China National Uranium Corporation, part of CNNC, has held the majority since 2019, and Rössing reports producing over 3,100 t of uranium oxide in 2025, its most since 2011.

    world-nuclear.orgrossing.com

    Credit

    Rio Tinto; Rössing Uranium Ltd; China National Uranium Corporation

  6. 2000

    Mining without entering the ore

    McArthur River in Saskatchewan began commercial production on 1 November 2000, after its first ore reached the Key Lake mill in January. Cameco froze the water-bearing rock around the ore with chilled brine and mined it by raise boring, a "non-entry" method: from a chamber in barren rock above, a machine drills overlapping holes down through the ore, remote-controlled loaders collect the broken ore below, and each hole is then filled with concrete. Cameco says raise boring has extracted more than 250 million lb of U3O8 there since 1999, and that boxhole boring, which drills upward from below, had not been used in uranium mining before its tests at McArthur River.

    LessonFreezing protects the ore zone, but new tunnels can still hit water: on 6 April 2003 part of a new tunnel's roof caved in at the 510 m level, and the inflow grew to about 900 m³ an hour against pumps rated at 1,000 m³ an hour.

    cameco.commineraldeposits.saskatchewan.ca

    Credit

    Cameco, with partners Cogema (now Orano) and Uranerz

  7. 2014

    Mining ore with water jets

    Cigar Lake's ore lies about 480 m down in soft, water-bearing Athabasca sandstone. Cameco first freezes the ground, piping brine chilled to -40 °C through it for about a year, then drills a pilot hole into the frozen ore and cuts the ore out with a high-pressure water jet run by remote control, flushing it down as a slurry of ore and water. Jet boring began in December 2013, the first slurry left for Orano's McClean Lake mill in March 2014, and Cameco reports 174.5 million lb of U3O8 produced since 2014 at what it calls the world's highest-grade uranium mine.

    LessonFloods in 2006 and 2008 pushed the start from 2011 to 2014 and the cost from C$660 million to about C$2.6 billion, by the World Nuclear Association's figures.

    cameco.comworld-nuclear.orgcameco.com

    Credit

    Cameco (developed jet boring); Orano

Watch for

  1. Rook I under construction

    NexGen plans a 10.7-year underground mine at Arrow using longhole stoping, in which ore is drilled and blasted between two tunnel levels, producing up to 30 million lb of U3O8 a year at first and 21.7 million lb a year on average, with tailings, the waste left after milling, placed underground as paste. Canada's nuclear regulator licensed site preparation and construction on 5 March 2026, and NexGen began a four-year construction program in August 2026, by the World Nuclear Association's account.

    Achieved whenthe regulator grants an operating license and NexGen reports a full year of output near the 21.7 million lb average.

    miningweekly.comworld-nuclear.org

    Claimed by

    NexGen Energy, March 2026

Open

  1. 01

    Mines against their plans

    A public ledger of the uranium mines built or restarted since 1995, setting each project's first feasibility-study estimates of capital cost, start date and early output beside what the company later reported, with the page each figure comes from.

    The brief
    Credit · unclaimed
  2. 02

    Radon readings back in public

    A public table, mine by mine and year by year, of the radon decay-product readings in working levels taken in US uranium mines from 1950 into the late 1960s, linked to each mine's location, with no workers' names.

    The brief
    Credit · unclaimed

Open 01 · the brief

Mines against their plans

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public ledger of the uranium mines built or restarted since 1995, setting each project's first feasibility-study estimates of capital cost, start date and early output beside what the company later reported, with the page each figure comes from.

Why it is still open

Cigar Lake's construction began in 2005 for a 2011 start; floods pushed production to 2014 and the cost from C$660 million to about C$2.6 billion, and NexGen raised Rook I's capital estimate from C$1.3 billion in 2021 to C$2.2 billion in 2024. The NEA's Red Book Retrospective measured the time from discovery to production up to 2004, but not cost or output against plan. Searches for this brief found no project-by-project comparison for uranium mines.

world-nuclear.orginis.iaea.org

Built with what exists

Technical reports filed under Canada's NI 43-101 rules on SEDAR+ and under Australia's JORC Code on the ASX; company annual reports; an AI model such as Claude to pull estimates from long reports with page citations; a person checking one figure in five.

  1. First step

    Build the Cigar Lake and McArthur River rows from Cameco's technical reports and annual reports.

  2. Done looks like

    At least 25 projects in at least five countries, each with first and final figures and a cited page, and published median overruns in cost and in months, with every figure traceable to a document.

Open 02 · the brief

Radon readings back in public

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table, mine by mine and year by year, of the radon decay-product readings in working levels taken in US uranium mines from 1950 into the late 1960s, linked to each mine's location, with no workers' names.

Why it is still open

The Federal Radiation Council wrote in 1967 that the Public Health Service field station in Salt Lake City kept records of mine identity, location and working-level readings, that states kept records from about 1960, and that only summaries by state and year were published. NIOSH researchers in 2022 linked each miner to employment records by mine and year combined with the available radon measurements; their paper reports risk estimates, not a mine-level table. A search for this brief found no public mine-by-mine dataset.

19january2021snapshot.epa.govstacks.cdc.gov

Built with what exists

Requests to the National Archives and to state archives in Colorado, New Mexico, Utah, Wyoming and Arizona; a document scanner; vision-language models such as Claude or Gemini to transcribe tables, with a second person re-keying a sample; the USGS Mineral Resources Data System for mine locations.

  1. First step

    Write to the National Archives and the Colorado State Archives asking where the Salt Lake City field station's and the state inspectors' radon survey files are held.

  2. Done looks like

    Readings for at least 500 mines transcribed and released, with 10% re-keyed by a second person and the error rate published, and yearly state averages that match the summaries the Federal Radiation Council printed in 1967.