Industries / Retail, hospitality and personal services / Hospitality and tourism / Wedding and events / Trade show displays
Setup and teardown
This work marks out the hall, puts each stand up on the show floor in the days before opening and takes it down afterwards, under the hall's labor rules and safety law.
4
Milestones achieved, from 2010 to 2019.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
2010
Chicago loosens work rules
After the Illinois General Assembly passed reforms for McCormick Place, Chicago's convention center, the International Housewares Association said in July 2010 that its show would stay in Chicago through 2016. Under the reforms, exhibitors in a booth of any size could use a ladder and power hand tools to set up and dismantle, assemble their own machinery, and unload a private car with a dolly or hand cart. Labor was billed at straight time for any consecutive 8 hours between 6 a.m. and 10 p.m. on weekdays, and electrical service was no longer exclusive to one contractor.
LessonThe housewares show tied its decision to stay in Chicago to the reforms passing.
Credit
the Illinois General Assembly
2014
Philadelphia's sign-or-leave deal
In May 2014 the Pennsylvania Convention Center told the six unions that supply its labor to sign a "customer satisfaction agreement" or lose their jurisdiction, the right to work there. The agreement let exhibitors use battery power tools and ladders and set up booths of up to 600 sq ft (56 m²) themselves. The riggers, electricians, stagehands and laborers signed; the Teamsters and carpenters had not signed by 6 May, and the carpenters had struck briefly the week before.
LessonChanging work rules by contract brought a strike and left two unions outside the agreement.
Credit
the Pennsylvania Convention Center's board
2015
Stand building becomes construction
From April 2015 the UK's revised Construction (Design and Management) Regulations, known as CDM, applied to the build-up and breakdown of exhibitions. The London Book Fair's 2020 guidance explains that a space-only exhibitor, one that rents bare floor and brings its own stand, is the "client" under the law and must appoint a principal designer and a principal contractor and make sure a construction phase plan exists. A stand needing more than 500 person-days of work, such as 100 workers a day over a five-day build, must be notified to the Health and Safety Executive (HSE).
Credit
the HSE and the UK government
2019
A robot marks the floor
Stand positions are marked on the bare hall floor before build-up. In November 2019 The Expo Group, a show contractor, used Lionel, a floor-marking robot from August Robotics, to mark booth corners from the CAD floor plan for a conference at the Kay Bailey Hutchison Convention Center, "for the first time ever in Dallas". In September 2024 August Robotics said its US fleet marked IMEX America at Mandalay Bay in Las Vegas, working with GES and other contractors.
Credit
August Robotics; The Expo Group
Watch for
Robot marks, claimed accuracy
August Robotics says Lionel makes every mark "to at least +/-1/8" accuracy" (about 3 mm), is "10x more accurate than hand-marking" and makes 80 to 90 marks an hour, and that it passed 1 million floor marks in May 2025. The figures are the company's own; a sponsored article about its first 280,000 marks gave no measured accuracy.
Achieved whenan independent survey of marks against the CAD plan, for robot and hand marking, is published.
Claimed by
August Robotics, May 2025
Open
01
Measure floor mark accuracy
An independent survey of where floor marks land against the CAD plan, in halls marked by robot and halls marked by hand.
The briefCredit · unclaimed02
Count build hours from video
Time-lapse cameras and a vision model that count crew-hours on each stand during build-up, by task, so exhibitors and builders have measured hours per square meter for each type of stand.
The briefCredit · unclaimed
Open 01 · the brief
Measure floor mark accuracy
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An independent survey of where floor marks land against the CAD plan, in halls marked by robot and halls marked by hand.
Why it is still open
The accuracy figures for robot marking come from its maker, and a sponsored trade article about it cited "amazing marking precision" with no numbers.
Built with what exists
a rented surveyor's total station, which measures positions to millimeters; the hall's CAD floor plan; QGIS or Python to compare planned and measured positions.
First step
Ask one venue for a hall's CAD plan and permission to measure 50 marks after the next move-in.
Done looks like
500 marks measured in two robot-marked and two hand-marked halls, with the spread of errors in millimeters published.
Open 02 · the brief
Count build hours from video
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
Time-lapse cameras and a vision model that count crew-hours on each stand during build-up, by task, so exhibitors and builders have measured hours per square meter for each type of stand.
Why it is still open
The published benchmarks are prices per hour and per pound, such as The Exhibitor Advocate's survey; this research found no published measure of the hours a stand takes to build.
Built with what exists
off-the-shelf time-lapse cameras; an open object-detection model such as Ultralytics YOLO to count people, with faces blurred; a vision-language model to label tasks.
First step
With the crew's consent, film one stand's build-up from two corners and compare a head count from the video with the timesheet.
Done looks like
Hours per square meter for 30 stands of known type and size, each within 10% of the crew's timesheet.