Construction layout

Layout, also called setting out, is the work of marking on a site where the walls, columns, roads or tunnel lines of a design go, and of checking afterwards that they were built there.

4

Milestones achieved, from 1968 to 2010.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1968

    Lasers set the grade

    Grade is the height and slope to which ground or a trench is dug or built, set by surveyors with levels, stakes and string lines. In the mid-1960s James Fouss and Norman Fausey, agricultural engineers of the US Department of Agriculture's Agricultural Research Service at Ohio State University, built the first laser grade control: photocells on a drainage trenching machine raised and lowered its digger to follow a laser beam set to the required grade. Around the same time Robert H. Studebaker of Tipp City, Ohio, spun a prism in a laser beam to sweep out a flat plane of light that several machines could follow at once. Studebaker and Ted L. Teach formed Laserplane Corp. in 1967, and laser control of a trencher was first shown at the Ohio State Farm Science Review in September 1968, by the account of International Rental News. ENR dates Studebaker's Laserplane to 1965, says his business grew into the Spectra Precision group, which Trimble bought in 2000, and quotes an engineer at a Chicago contractor: "Every job has some sort of laser on it now."

    internationalrentalnews.comenr.com

    Credit

    James Fouss and Norman Fausey, USDA Agricultural Research Service; Robert H. Studebaker and Ted L. Teach, Laserplane Corp

  2. 1994

    One person sets out

    Setting out with a total station took a two-person team, one at the instrument and one holding the prism, a reflector on a pole, at each point. The Geodimeter 420 of 1987 could already set out by coordinates, updating the distance to the target 2.5 times a second. The Geodimeter 600 system of 1994 added tracker and radio modules that let the instrument follow the pole by itself, with the work controlled from the prism end. Robotic total stations of this kind now let one operator set out points alone.

    albertalandsurveyhistory.caconstructionmanagement.co.uk

    Credit

    Geodimeter (AGA's surveying business in Sweden, now part of Trimble)

  3. 2003

    Two halves, 54 cm apart

    Germany and Switzerland measure heights from different sea levels, the North Sea and the Mediterranean, which differ by 27 cm. In December 2003, in a routine check before Christmas, the site management of a new Rhine bridge between the German and Swiss towns of Laufenburg found the two halves 54 cm apart in height, after two stages had already been concreted. The offset had been corrected in the wrong direction, probably because a plus sign became a minus, which doubled the gap instead of removing it. The German side was lowered, the bridge opened on 18 December 2004, and its roadway still rises slightly toward the middle.

    LessonWhen two teams set out from different height systems, the offset between them has to be checked from both sides before concrete is poured.

    chgemeinden.chthelocal.com

    Credit

    the Canton of Aargau and the state of Baden-Württemberg, which shared the cost

  4. 2010

    Gotthard's ends meet

    On 15 October 2010 the tunnel-boring machine in the eastern bore of the 57 km Gotthard Base Tunnel broke through 8 cm off line sideways and 1 cm in height; 25 cm would have been allowed. Surveyors carried the line in with traverses and survey gyroscopes, which find north from the Earth's rotation, and down the 800 m shaft at Sedrun by plumbing and gyroscopes, checked by an inertial measuring system, three accelerometers and three laser gyroscopes, ridden down in the shaft cage at 58 km/h.

    LessonWriting in the German surveying journal zfv, Franziska Konitzer credits the result to checking every measuring method again and again by independent methods.

    tunnel-online.infomail.geodaesie.info

    Credit

    AlpTransit Gotthard AG and its survey teams

Watch for

  1. Robots drill from the plans

    DEWALT and August Robotics mount a DEWALT drilling rig on August's Lionel robot, which finds its own position indoors and works from the building's CAD file, to drill the floor holes that anchor data-center server racks, a job otherwise done by laying out each hole and then drilling it. DEWALT's director of robotics told The Robot Report that 12 robots in an early-access program had drilled 108,000 holes with 99.97% placement accuracy, and the article says the robots drill within about 1/8 in (3.1 mm) of the plan; the partners said that four robots cut a data center's floor preparation from eight or nine weeks of layout and drilling to seven to nine days.

    Achieved whena contractor or other outside party publishes a survey of drilled hole positions against the plan, with the tolerance used and the share of holes outside it.

    therobotreport.com

    Claimed by

    DEWALT, January 2026

Open

  1. 01

    Check marked layout by phone

    A phone method that photographs a floor after layout, with chalk lines or robot-printed lines, finds every line and mark, and reports how far each one sits from where the CAD drawing puts it, before any wall, sleeve or anchor goes in.

    The brief
    Credit · unclaimed
  2. 02

    An open floor-marking robot

    An open-source robot that drives over an empty floor and marks layout points and lines from a CAD file, steered by a robotic total station that tracks a prism on the robot, with all code, parts and accuracy results published.

    The brief
    Credit · unclaimed

Open 01 · the brief

Check marked layout by phone

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A phone method that photographs a floor after layout, with chalk lines or robot-printed lines, finds every line and mark, and reports how far each one sits from where the CAD drawing puts it, before any wall, sleeve or anchor goes in.

Why it is still open

Marked layout is still checked with tapes and total stations, or by laser scanning. The contractor Christman wrote in April 2026 that it runs drone images through AI software against each trade's CAD model to find misplaced sleeves and embedded parts before a pour, with variances found "down to fractions of an inch", but it published no accuracy test. Layout robots are rated at about ±2 mm by HP for its SitePrint, and this research found no published test of a photo method at that tolerance.

christmanco.comhp.com

Built with what exists

A phone camera; printed ChArUco targets, checkerboards with coded markers, placed on known control points; OpenCV for camera calibration and target detection; Meta's SAM 2 image segmentation model to pick out lines and marks; the ezdxf library to read the CAD file; a total station borrowed from a college surveying lab as the reference.

  1. First step

    Snap ten chalk lines on a gym or garage floor with the owner's permission, shift three marks on purpose, and test target detection on 20 phone photos.

  2. Done looks like

    On three empty floors laid out with chalk or tape, 300 marks, 50 of them deliberately shifted by 3 to 50 mm; the method's position for every mark published beside the total station's, with the share of shifted marks it flags and the share of correct marks it flags in error.

Open 02 · the brief

An open floor-marking robot

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open-source robot that drives over an empty floor and marks layout points and lines from a CAD file, steered by a robotic total station that tracks a prism on the robot, with all code, parts and accuracy results published.

Why it is still open

The robots that do this today, from Dusty Robotics, HP and August Robotics, are closed products, and their accuracy figures are their makers' own; HP's ±2 mm comes from its own tests under set conditions. Research robots have been built but not released: Takenaka, a Japanese contractor, reported in 2019 that its first prototype, located by a measuring instrument that tracked it, marked 182 positions in a 6 m by 6.5 m area of a real site with an average error of 2.3 mm and 98 seconds a mark, which its engineers judged short of a worker's accuracy and speed, and it cites earlier total-station marking robots by Inoue and colleagues. A GitHub search in November 2026 found no open robot that marks a floor. The nearest open work is ETH Zurich's compas_mrr library, which locates a mobile construction robot with a total station (Ercan, Meier, Gramazio and Kohler, 2019).

github.comhp.comiaarc.org

Built with what exists

A small robot base running ROS 2; a marker or paint pen on a servo; a rented robotic total station streaming prism positions, read through compas_mrr or Université Laval's RTS_project library; ezdxf for the CAD file.

  1. First step

    Mount a pen on a hobby robot base, fix a 360° prism above it, and log a total station's position stream through compas_mrr while the robot drives a straight line.

  2. Done looks like

    On an empty floor at least 20 by 20 m, 200 points and 50 m of line marked from one CAD file and then measured from a separate total station setup, with the error distribution (mean and 95th percentile, in mm) and marks per hour published beside a human crew's time on the same file.