Industries / Energy, water and waste / Environmental services / Solid waste collection
Landfills
At the landfill, crews weigh each incoming truck at the scale house, spread and pack its load at the working face, the small area where waste is placed that day, and cover it, trying to fit as many tons as possible into the permitted space, which the trade calls airspace.
5
Milestones achieved, from 1948 to 2018.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1948
One landfill for a city
New York City opened Fresh Kills Landfill on tidal marsh on Staten Island's west shore in 1948, and by 1955 it was the largest landfill in the world. At its peak in 1986–87 it received as much as 29,000 tons of trash a day, and by 1991 it was the city's only landfill taking household garbage.
LessonA 1996 state law ordered it to stop taking waste by the end of 2001; its four mounds hold about 150 million tons, and the site is being turned into a park almost three times the size of Central Park.
Credit
City of New York
1991
Cover it every night
US rules for municipal landfills require operators to cover each day's waste with 6 inches of soil at the end of the operating day, or more often if needed, to control disease-carrying pests, fires, odors, blowing litter and scavenging. A state may approve other cover materials that do the same job, and may set a different schedule for landfills that take 20 tons a day or less.
Credit
US EPA, rule 40 CFR 258.21, published on 9 October 1991
1996
Cover counted as recycling
A 1996 California law (AB 1647) let alternative daily cover, cover made of something other than soil, count as recycling. A 2014 law (AB 1594) reversed this for green material such as yard trimmings: from 1 January 2020 it counts as disposal. CalRecycle, the state's recycling agency, lists 11 approved kinds of alternative cover, from compost and shredded tires to foam, fabric panels and spray-on cement; the three kinds not made from waste can never count toward recycling.
LessonYard trimmings buried as cover counted as recycling for 24 years before the law changed; in 2024, four years after the change, green material was 2% of California's 4.2 million tons of disposal-related uses and other alternative cover was 63%, by CalRecycle's count.
Credit
California Legislature; CalRecycle
2017
Koshe dump collapses
On the night of 11 March 2017 part of the Koshe dump on the edge of Addis Ababa, Ethiopia, gave way and buried homes built on and beside it. Officials put the death toll at 113 by 16 March. The site had taken the capital's garbage for more than 50 years.
LessonA resident told the Associated Press that dumping had stopped in recent years and resumed only after farmers near a new landfill being built elsewhere blocked trucks from dumping there, so the old site's closing depended on the new one opening.
Credit
Addis Ababa city administration, which ran the dump
2018
A 10% cap in Europe
The European Union amended its Landfill Directive in 2018 (Directive (EU) 2018/850). As it now stands, the directive limits the share of municipal waste landfilled to 10% by 2035 and restricts landfilling of waste that is suitable for recycling or energy recovery from 2030. In 2018, 24% of the municipal waste generated in the EU was landfilled, according to the European Commission.
Credit
European Parliament and Council of the European Union
Watch for
A compactor without a driver
WM says it will test a Caterpillar-built autonomous landfill compactor, the heavy steel-wheeled machine that packs waste at the working face, at its Marana landfill near Tucson, Arizona. It follows a pilot that began in late 2025, in which operators in a climate-controlled room ran a bulldozer by remote control using Caterpillar's Cat Command system. Neither WM's release nor Waste Dive's report gives figures for hours, output or safety.
Achieved whenWM or an outside party publishes how many hours the compactor ran without an operator aboard and the waste density it reached, set against a crewed machine on the same site.
Claimed by
WM and Caterpillar, August 2026
Open
01
Closure years, checked
For every active municipal landfill in ten US states, the expected closure year listed in EPA's landfill database, set beside the years left implied by the remaining capacity and yearly intake the landfill reports to its state, with every gap of more than five years flagged.
The briefCredit · unclaimed02
Density from public lidar
In-place waste density, the tons packed into each cubic yard, for 15 Texas landfills, measured from the change in ground surface between two public airborne lidar surveys and the tons each landfill reported receiving in between, set against the density its reported capacity implies.
The briefCredit · unclaimed
Open 01 · the brief
Closure years, checked
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
For every active municipal landfill in ten US states, the expected closure year listed in EPA's landfill database, set beside the years left implied by the remaining capacity and yearly intake the landfill reports to its state, with every gap of more than five years flagged.
Why it is still open
The one national list is the database of EPA's Landfill Methane Outreach Program (LMOP). Its September 2024 file covers 2,641 municipal landfills, 1,266 of them open, and gives an expected closure year for 1,103 of the open ones, but EPA says the database "is not exhaustive" and that not all data are updated each year; most of its waste-in-place figures are for 2022. States report remaining capacity in their own formats: Texas counts about 50 years of capacity statewide (TCEQ, September 2025) and files each landfill's annual report separately, and NEWMOA's April 2026 report finds that Northeast landfills receiving 23% of the region's disposed waste will reach permitted capacity within five years. No published comparison of LMOP's closure years with state records was found.
Built with what exists
EPA's LMOP landfill file (a spreadsheet); state annual landfill reports (Texas, Illinois, Louisiana, Florida and the NEWMOA states publish them); DuckDB; a low-cost extraction model to read the reports (see the Note "The jobs agents repeat"); an agent that cites the page behind each number (see the Note "Findings that cite notes").
First step
Download LMOP's landfill file and the Texas 2024 report, match the 20 largest Texas landfills by name and permit number, and compare their years left.
Done looks like
Every active municipal landfill in at least ten states has a row with both estimates, each linked to its source. For each state, the remaining capacity in the table matches the state's own published total within 5%, and a list names every landfill where the two estimates differ by more than five years.
Open 02 · the brief
Density from public lidar
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
In-place waste density, the tons packed into each cubic yard, for 15 Texas landfills, measured from the change in ground surface between two public airborne lidar surveys and the tons each landfill reported receiving in between, set against the density its reported capacity implies.
Why it is still open
Texas landfills report remaining capacity in both tons and cubic yards (about 2 billion tons and 3 billion cubic yards statewide at the end of 2024), so each implies a density; no outside check of those figures was found. The closest study, by Miyuki Muto and Hideyuki Tonooka in 2025, measured volume change at 15 dumps in six developing countries from ASTER satellite elevation data and assumed the density; it covered no US sites and used no lidar. No study was found that does this with public lidar for US landfills.
Built with what exists
USGS 3D Elevation Program lidar, downloaded through OpenTopography or The National Map; PDAL and CloudCompare to compare point clouds; QGIS; Python; TCEQ landfill annual reports for tonnage.
First step
Use the 3DEP coverage map to list Texas landfills that fall inside two lidar projects flown in different years, and pick five.
Done looks like
Fifteen landfills with two lidar surveys at least two years apart, each with a measured volume change, a density with an error range, and the density implied by its reported capacity beside it. A second person reruns one site and gets a volume within 10%.