Industries / Industrial equipment and services / Industrial services / Scaffolding
Tracking materials
Scaffolds are built from tubes, fittings and boards that are hired out, returned, checked and used again, and this work keeps count of those parts and decides which are still fit to use.
5
Milestones achieved, from 2001 to 2018.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
2001
One tube standard for Europe
The European standard EN 39:2001 sets the requirements for steel tubes used with EN 74 couplers in scaffolds: an outside diameter of 48.3 mm and a wall 3.2 mm or 4.0 mm thick. It includes detailed marking requirements "to aid long term identification" of tubes over their working life. An earlier edition dates from 1976, and Estonia's standards body lists the 2001 edition as withdrawn from 15 January 2026.
Credit
European Committee for Standardization (CEN)
2005
Every reused part checked
WorkSafe Victoria in Australia told industry on 29 July 2005 that suppliers must inspect and maintain scaffold components between hires, and that every component must be inspected by eye before it goes into a scaffold, because parts wear out with reuse. It pointed to the Australian and New Zealand guideline AS/NZS 4576: rejected parts go back to the supplier, who decides whether to repair or scrap them.
Credit
WorkSafe Victoria
2007
Software for the hire stock
Avontus, a software firm in Berkeley, California, released Quantify in 2007 to manage scaffold inventory, rentals, shipping and billing in one system, after starting in 2002 with estimating software.
Credit
Avontus, founded by Brian Webb
2016
RFID loses to steel
Altrad, one of Europe's largest scaffold makers, tried passive RFID tags, radio labels read without a battery, on tubes and wire crates at its German plant, but the mass of steel blocked their signals and the system was too expensive to run. In 2016 it instead put battery-powered Bluetooth beacons on crates, read by phones mounted on warehouse walls.
LessonTags that work on cardboard boxes may not read through stacks of steel.
Credit
Altrad and Smartly Solutions
2018
A bad batch of couplers
On a Kier and BAM joint venture site, a drop-forged double coupler sheared at its hinge pin lug while a scaffolder tightened it. Random checks of the same delivery found misplaced lug holes, badly cut threads and missing or bent washers, although the couplers were marked as meeting EN 74-1. The joint venture told sites to quarantine tube-and-fitting scaffolds until inspected and to replace every double coupler from batch BM0218G.
LessonA standard's marking does not prove a sound part, and a batch number lets a site find every suspect one.
Credit
Kier BAM joint venture
Watch for
AI counts returned parts
Doka says its AI Counting and Identification tool suggests a count from a phone photo of returned rental parts, including scaffold components, and records the photo with the result. Doka says it is used at more than 50 Doka locations, has counted over a million items in more than 10,000 uses, and is more than 98% accurate.
Achieved whenan outside party checks its counts against hand counts, or customers use it on their own sites and publish its error rate.
Claimed by
Doka, June 2025
Open
01
An open fittings count test
A public set of photos of returned scaffold fittings, such as couplers, joint pins and base plates, lying in stillages (steel cages) and bags, each pile counted twice by hand, with a scoreboard for any counting tool.
The briefCredit · unclaimed02
Grade returned couplers by camera
A bench station that photographs a returned coupler from several sides and sorts it as reuse, repair or scrap, naming the fault, such as a bent bolt, damaged thread, cracked body or missing washer.
The briefCredit · unclaimed
Open 01 · the brief
An open fittings count test
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public set of photos of returned scaffold fittings, such as couplers, joint pins and base plates, lying in stillages (steel cages) and bags, each pile counted twice by hand, with a scoreboard for any counting tool.
Why it is still open
Doka's counting tool is used only in Doka's own yards, and its 98% figure is its own. Chen and colleagues (2024) published a counting model for rebar, steel pipes, square tubes and I-beams seen end on, with an app that drew more than 28,000 users, but loose piles of fittings are a different problem. The only scaffold fitting set found on Roboflow Universe, 42 photos of spring clamps, marks clamps but does not count piles, and a 2024 Roboflow model trained on 121 photos finds scaffold bases without a test against counted piles. A search found no public test with counted piles of scaffold fittings.
internationalrentalnews.comapi.crossref.orguniverse.roboflow.comuniverse.roboflow.com
Built with what exists
Phone cameras; Ultralytics YOLO and open crowd-counting models; a platform scale for spot checks by weight; a coding agent such as Inkling 2 Small (see the Note "Checked without being asked") for the scoreboard.
First step
Ask one hire yard to let you photograph 50 returned stillages before its staff count them, and record their counts.
Done looks like
2,000 photos from at least two hire yards with true counts; the error per photo of at least two open models published; the set released under an open license, with any vendor invited to run the same test.
Open 02 · the brief
Grade returned couplers by camera
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A bench station that photographs a returned coupler from several sides and sorts it as reuse, repair or scrap, naming the fault, such as a bent bolt, damaged thread, cracked body or missing washer.
Why it is still open
Components are checked by eye: WorkSafe Victoria's guidance has every part inspected visually before use, with rejected parts returned to the supplier, and the 2018 bad batch was found by hand after a coupler broke. Kim and colleagues at Sungkyunkwan University (2022) built a prototype that grades reused scaffold parts from photos, trained partly on computer-made images, and describes it as a prototype. The spring-clamp set on Roboflow finds clamps in photos but does not judge their condition.
old.australianscaffolds.com.auscaffmag.comdoaj.orguniverse.roboflow.com
Built with what exists
A light box with two or more phone cameras; Ultralytics YOLO; Blender, free 3D software, for extra training images as Kim and colleagues used; the defect list from the 2018 coupler alert.
First step
Collect 50 scrapped and 50 serviceable couplers from a hire yard and photograph each from six angles.
Done looks like
1,000 returned couplers graded separately by two experienced yard inspectors; the station's agreement with them published; a pass means no coupler both inspectors scrapped is graded fit for reuse.