Industries / Industrial equipment and services / Industrial services / Scaffolding
Other ways to reach the work
Powered lifts, rope access, suspended and mast-climbing platforms and drones each reach some work at height without a scaffold, and this domain follows how they took over parts of the job.
5
Milestones achieved, from 1970 to 2024.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1970
Lifts instead of scaffolds
JLG says its founder, John L. Grove, saw a fatal scaffolding accident in 1969 and that the company built and sold its first aerial work platform in 1970: a powered platform that lifts a worker to the job with nothing to build first. Machines of this kind are now called mobile elevating work platforms, or MEWPs. The International Powered Access Federation (IPAF) says its members, in more than 80 countries, make about 85% of the platforms on the market and run most of the world's rental fleet.
Credit
John L. Grove and JLG Industries
1987
Ropes instead of scaffolds
Companies that had begun using ropes and harnesses for maintenance in the offshore oil and gas industry formed the Industrial Rope Access Trade Association (IRATA) in the UK, in part because existing law did not cover rope access. A rope access technician reaches the job hanging from a working line with a separate safety line, so that one failure cannot cause a fall, and no scaffold is built. In its code of practice, Britain's Health and Safety Executive (HSE) wrote in 2010 that rope access is "an accepted technique to use in appropriate circumstances", and its offshore division commended the code for offshore work. IRATA says it has more than 700 member companies and has trained more than 130,000 technicians.
Credit
IRATA and its founding member companies
2018
One rulebook for US lifts
The American National Standards Institute's A92 suite, published in December 2018, replaced separate US standards for boom lifts, scissor lifts and other types with three standards organized by task: design (A92.20), safe use (A92.22) and operator training (A92.24). Among the changes IPAF lists: "MEWP" replaced "aerial work platform" as the US term, most new machines must sense an overload and refuse normal operation, the maximum wind rating must be shown at the controls, and training is now by machine group (whether the platform can reach past the tipping line) and type (whether it can travel while raised). IPAF's guide gave the industry until December 2019 to comply.
Credit
the ANSI A92 standards committee
2023
Drones skip the scaffold
EPRI, the US power industry's research institute, published guidance in March 2023 on inspecting nuclear plant condensers, the large heat exchangers that turn spent steam back into water, with drones instead of people on scaffolds. EPRI says the method has already been used at nuclear plants, can sometimes be done at full power, and saves $30,000 to $100,000 an inspection, mostly by cutting scaffolding, permits and staff. Caged drones built to bump into structures and keep flying, such as Flyability's Elios 3, are made for this kind of indoor work.
Credit
drone makers including Flyability, the plants that adopted them, and EPRI
2024
Lift deaths counted worldwide
IPAF collects accident reports on powered access machines from anyone through a web portal and its ePAL phone app, and released the first digital edition of its yearly Global Safety Report in July 2024. The 2026 edition counts 76 deaths in 2025 involving MEWPs, mast climbing work platforms and construction hoists, from reports in 25 countries. The leading cause of fatal and major incidents was electrocution and electric shock, ahead of falls from the platform and overturns.
LessonIPAF finds the same few hazards behind the worst accidents year after year; they are well understood but not controlled at the point of work.
Credit
IPAF and its International Safety Committee
Watch for
Thickness readings without scaffolds
Voliro says its Voliro T drone, which presses an ultrasonic probe against steel to measure how much wall is left, takes up to 200 thickness readings an hour and makes such inspections 10 times faster than work from scaffolds or ropes, which it says typically needs three to five people.
Achieved whena plant owner or inspection body publishes a side-by-side test on the same tanks or pipes, giving the time, crew size and agreement of readings for the drone and for scaffold or rope access.
Claimed by
Voliro, November 2025
Open
01
Count what voluntary reports miss
A yearly count of US deaths and severe injuries on powered lifts, built from public government records, with each case sorted into IPAF's causes (electrocution, fall from the platform, overturn, entrapment and the rest) and set beside IPAF's own count for the same year.
The briefCredit · unclaimed02
Flag power lines before dispatch
A US desk check for lift jobs, built on open map data: it takes the address of a planned job, looks up overhead power lines mapped near it, and warns the planner before the machine is sent, so the utility can be called and a safe distance set. It is tested first against the sites of past lift electrocutions.
The briefCredit · unclaimed
Open 01 · the brief
Count what voluntary reports miss
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A yearly count of US deaths and severe injuries on powered lifts, built from public government records, with each case sorted into IPAF's causes (electrocution, fall from the platform, overturn, entrapment and the rest) and set beside IPAF's own count for the same year.
Why it is still open
IPAF's figures come from reports people choose to send: it received them from 25 countries for 2025, and it says it does not investigate them. The independent US counts found in this search are old. CPWR, a construction safety research center, found from 1992–1999 federal fatality data that an average of 26 construction workers died each year using aerial lifts. Pan and colleagues at NIOSH (2007) drew lift falls from three federal sources and found that tipovers made up 44–46% of boom-lift falls and 56–59% of scissor-lift falls. A search found no recent count from government records set against IPAF's.
Built with what exists
OSHA's Fatality Inspection Data, which covers federal inspections opened after April 2011 and state-plan inspections from about October 2014; OSHA's severe injury reports, which give a written account of each case; a language model that answers fixed-choice questions about each account (see the Note "A thousand questions, one pass"); two people to check a sample.
First step
Download OSHA's severe injury reports and pull every case whose account mentions an aerial, scissor or boom lift. A keyword search for this file found about 1,300 such reports from January 2015 to November 2025.
Done looks like
For 2025, every US lift death and severe injury found in OSHA's records listed with its cause; two people check the sorting on at least 200 cases; the totals published beside IPAF's 2025 figures, with the gap stated.
Open 02 · the brief
Flag power lines before dispatch
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A US desk check for lift jobs, built on open map data: it takes the address of a planned job, looks up overhead power lines mapped near it, and warns the planner before the machine is sent, so the utility can be called and a safe distance set. It is tested first against the sites of past lift electrocutions.
Why it is still open
Electrocution and electric shock was the leading cause of fatal and major lift incidents in IPAF's 2025 data. WorkSafe Western Australia found that in many incidents the business or operator could not find out where the lines were before reaching the site. Australian utilities already answer this with Energy Queensland's free Look Up and Live map, which shows 210,000 km of overhead lines in Queensland for planning work and which Transgrid and other utilities now feed with their own network data. A search found no such map covering the US. OpenStreetMap volunteers map many power lines, and Open Infrastructure Map displays them, but a search found no measure of how many past lift electrocution sites such a map would have flagged.
ipaf.orgworksafe.wa.gov.auenergymagazine.com.autransgrid.com.auopeninframap.org
Built with what exists
OpenStreetMap power-line data, downloaded through the Overpass API; OSHA's severe injury reports, which give map coordinates for each case; a coding agent to write the lookup (see the Note "Checked without being asked").
First step
Pull the lift reports in OSHA's severe injury data whose accounts mention electricity or power lines (a keyword search for this file found about 190, each with coordinates) and plot them on Open Infrastructure Map.
Done looks like
For every OSHA severe injury report from 2015 to 2025 in which a lift made electrical contact, the share of sites with a mapped line within 30 m (about 100 feet), published with the full list; the same check run on 500 lift injury sites with no electrical contact, to show how often it would raise a false alarm.