Industries / Technology / Telecommunications / Satellite internet
Radio spectrum
Satellite internet runs on radio frequencies shared with other satellites, phone networks and radio telescopes, and this work decides who may transmit where, at what power.
4
Milestones achieved, from 2017 to 2026.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
2017
Large fleets get US access
On 22 June 2017 the FCC conditionally let OneWeb's planned 720-satellite system serve the US in Ku and Ka bands, calling the grant "the first of its kind for a new generation of large... NGSO systems," meaning systems not in geostationary orbit. Conditions included coordination through the ITU, the UN agency for radio, power limits, and avoiding in-line interference, when two satellites line up as seen from a dish. Eleven companies filed in the same FCC processing round.
Credit
FCC; OneWeb
2024
Phone spectrum used from space
In March 2024 the FCC adopted a framework, FCC 24-28, that lets a satellite operator lease a mobile carrier's licensed spectrum to reach that carrier's customers' ordinary phones, which the FCC called "the first of its kind in the world." The rules took effect on 30 May 2024.
Credit
FCC
2024
Leaks the rules miss
Using the LOFAR radio telescope on 19 July 2024, Cees Bassa of ASTRON, the Netherlands Institute for Radio Astronomy, and co-authors found that second-generation Starlink "V2-mini" satellites give off unintended radio emission up to 32 times brighter than the first generation, which LOFAR had already caught the year before. Bassa said the emission is 10 million times brighter than the faintest sources LOFAR observes, and ASTRON called for stricter rules on unintended radiation.
LessonRules written for the signals a satellite means to send do not cover what its electronics leak.
Credit
Cees Bassa, Federico Di Vruno and co-authors (Astronomy & Astrophysics, September 2024)
2026
Power limits replaced
EPFD (equivalent power flux density) limits cap the combined power that fleets in lower orbits may send toward dishes pointed at geostationary satellites. On 30 April 2026 the FCC voted to replace its EPFD framework, developed in the late 1990s, with performance-based protection criteria for geostationary links, backed by good-faith coordination between operators. Chairman Carr and Commissioners Gomez and Trusty approved.
Credit
FCC (FCC 26-26)
Watch for
Global limits at WRC-27
The ITU's World Radiocommunication Conference, where countries revise the international radio rules, meets in Shanghai from 11 October to 12 November 2027. Runway Girl Network reports an agenda item there that could lead to action on the EPFD limits at WRC-2031; SpaceX's Udrivolf Pica has argued the limits "are spectrally inefficient and unnecessarily constrain non-GSO systems," while SES has argued the pace of launches shows they have not held operators back.
Achieved whenWRC-27 adopts a decision that changes the limits or sets a date to change them.
Claimed by
Runway Girl Network's reporting, December 2025
Seven times the capacity
The FCC says its April 2026 rules could bring "up to seven-fold more capacity for space-based broadband services" and more than $2 billion in economic benefits.
Achieved whenan outside tester measures US satellite broadband speeds or capacity before and after operators use the new power levels.
Claimed by
FCC, April 2026
Open
01
One table of WRC-27 positions
A free, searchable table of every regional group's and country's published position on each satellite-related WRC-27 agenda item, each row linked to the sentence it came from and updated as new drafts appear.
The briefCredit · unclaimed02
Measure the new protection
A logbook from working geostationary internet terminals that records signal quality every second, marks each moment a low-orbit satellite passes near the line between the dish and its geostationary satellite, and measures any drop, the kind of harm the FCC's new criteria are meant to limit.
The briefCredit · unclaimed
Open 01 · the brief
One table of WRC-27 positions
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A free, searchable table of every regional group's and country's published position on each satellite-related WRC-27 agenda item, each row linked to the sentence it came from and updated as new drafts appear.
Why it is still open
The ITU posts regional groups' preliminary positions, from the African (ATU), Inter-American (CITEL) and Asia-Pacific (APT) groups among others, as separate documents. PolicyTracker's WRC-27 dossier, which sorts positions by regional group, is part of its research service for subscribers. A search found no free table.
Built with what exists
Position documents from the ITU and the regional groups; a language model that drafts each row and cites the sentence it came from (see the Note "Findings that cite notes"); a second pass that flags doubtful rows for a person to check (see the Note "Seven more flagged"); CSV files on GitHub.
First step
Enter the ATU and APT preliminary positions on the EPFD item from the ITU's posted documents and check each row by hand.
Done looks like
Every satellite-related WRC-27 agenda item with the positions of the six regional groups (CEPT, CITEL, APT, ATU, ASMG and RCC) and at least 20 countries, every row cited, a second checker agreeing on at least 95% of rows, published before the conference opens on 11 October 2027.
Open 02 · the brief
Measure the new protection
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A logbook from working geostationary internet terminals that records signal quality every second, marks each moment a low-orbit satellite passes near the line between the dish and its geostationary satellite, and measures any drop, the kind of harm the FCC's new criteria are meant to limit.
Why it is still open
The FCC's April 2026 order replaced fixed power limits with protection criteria for geostationary links and leaves operators to bargain over protection in private agreements. Claims of harm go unmeasured in public: unnamed executives told Runway Girl Network that air passengers near the equator could see "meaningful degradation." A search found no published field measurement of geostationary link quality during these line-ups.
Built with what exists
Geostationary terminals whose modems report signal quality; CelesTrak's supplemental orbit data for low-orbit satellite positions; Python with the Skyfield library to compute angles; the FCC order's criteria as the yardstick.
First step
Log one week from one geostationary terminal and mark every low-orbit satellite pass within 10 degrees of its beam.
Done looks like
Ninety days of one-second logs from three sites at different latitudes, every line-up within 5 degrees listed, and the measured change in signal quality reported against hours with no line-up, with data and code public.