Industries / Government, education and community / Government / Postal and courier
The transport network
The transport network is the chain of riders, coaches, trains, planes and trucks that carries mail between post offices, sorting centers and hubs.
6
Milestones achieved, from 1490 to 2025.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1490
Relay riders for an emperor
At Emperor Maximilian I's request, the Taxis family set up a standing courier route from Innsbruck to Mechelen, near Brussels, with stations where riders and horses were changed. A town chronicle of Memmingen for 1490 records that "the mail began to be ordered" on Maximilian's orders. Innsbruck's tourist board puts the stations 20 to 40 km apart and dates the first route to 1489. The Thurn und Taxis family says a letter took five and a half days between Innsbruck and Brussels around 1500.
artsandculture.google.comthurnundtaxis.dediscover-innsbruck.at
Credit
Janetto and Francesco de Tassis (Franz von Taxis); Maximilian I
1784
Coaches replace post boys
Mail in Britain had traveled with boys on horseback. John Palmer, a theater owner, paid for a trial of fast, guarded coaches. On 2 August 1784 one left Bristol at 4 p.m. and reached the General Post Office in London the next morning, covering 116 miles in 16 hours instead of the usual 38. Bristol Museums says that within a year every mail route in England and Wales used the system.
Credit
John Palmer
1860
The Pony Express
From 3 April 1860 riders carried mail about 2,000 miles between St. Joseph, Missouri, and Sacramento, changing horses at relay stations 10 to 15 miles apart. The first run took ten days, less than half the time of the stagecoach route. The service ended on 26 October 1861, after the telegraph line across the country was finished. The company charged up to $5 per half ounce, when ordinary postage was 10 cents, and still did not cover its costs, by the Postal Service historian's account.
LessonA faster network can lose to a different technology within months, however fast it is.
Credit
William H. Russell, Alexander Majors and William B. Waddell
1927
A railway only for mail
The Post Office opened its own underground electric railway in London in 1927, linking six district sorting offices with two main railway stations, away from street traffic. It carried its last mail on 31 May 2003. Royal Mail said it cost at least four times as much as moving the same post by road, and the bags it carried had fallen from 7 million to 3.4 million a year.
LessonA network tied to fixed buildings loses its use when the buildings close; by 2003 only three of its stations were still in use.
Credit
the British Post Office
2021
Slower mail, fewer planes
From 1 October 2021 the US Postal Service added one or two days to its delivery standards for part of First-Class Mail, so that more of it could travel by truck instead of plane. It said air is less reliable, because of weather and ground stops, and costs much more. The Postal Regulatory Commission's advisory opinion said the Postal Service had run no operational or pilot test, and that the savings would be eaten up by the costs of growing package volume; by law the opinion could not stop the change.
Credit
US Postal Service; Postal Regulatory Commission
2025
Japan Post loses truck license
In April 2025 Japan Post disclosed that 75% of its 3,188 delivery offices had not carried out the required alcohol and health checks on drivers. Japan's transport ministry then revoked its license to run trucks, which bars it from about 2,500 trucks and vans for five years, and by February 2026 had also suspended 3,333 small delivery vans at 1,862 post offices. Japan Post covered the work with outside contractors and nearby offices.
LessonA safety check kept only on paper can take a national post's trucks off the road.
Credit
Japan's Ministry of Land, Infrastructure, Transport and Tourism
Watch for
Bullet trains for parcels
East Japan Railway (JR East) began running a freight-only bullet train between Morioka and Tokyo on 23 March 2026. The seven-car train, converted from a passenger train, runs on weekdays and carries up to about 1,000 boxes, 17.4 metric tons, in about three hours and 15 minutes. JR East says demand will grow because of truck driver shortages and the need to cut carbon emissions.
Achieved whenJR East or its customers publish loads carried over a full year, showing the train runs well filled rather than as a showcase.
Claimed by
JR East, March 2026
Open
01
An open test-letter panel
A standing panel of volunteers who mail dated postcards to each other on a fixed schedule. The receiver scans a QR code on each card to log the arrival day. In the US each card also carries an Intelligent Mail barcode, the 65-bar code that sorting machines read, so the Postal Service's own scan records show which plants the card passed through and how long it sat in each. Publish monthly on-time shares by route, with all raw data, beside the regulator's figures for the same months.
The briefCredit · unclaimed02
Parcels on fast trains
An open model that reads a high-speed rail operator's public timetable and estimates how many parcels a day could ride between each pair of cities in converted cars, how long they would take door to door with a van at each end, and how that compares with a truck.
The briefCredit · unclaimed
Open 01 · the brief
An open test-letter panel
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A standing panel of volunteers who mail dated postcards to each other on a fixed schedule. The receiver scans a QR code on each card to log the arrival day. In the US each card also carries an Intelligent Mail barcode, the 65-bar code that sorting machines read, so the Postal Service's own scan records show which plants the card passed through and how long it sat in each. Publish monthly on-time shares by route, with all raw data, beside the regulator's figures for the same months.
Why it is still open
Official delivery figures come from test-mail panels run for the posts or their regulators; the research firm Quotas, for one, recruits volunteers to send and receive test letters "to help postal operators" monitor quality. Outside checks are one-off newsroom tests: in October 2026 Spectrum News found that 89 of 213 local letters took longer than two business days, and the Postal Service said the test was not definitive evidence. University of Northern Iowa researchers used the barcode scans in 2025 to time survey reply envelopes to a single address, with a median of 3.5 days. This research found no standing public panel with open raw data.
Built with what exists
Postcards and stamps paid for by the volunteers; QR codes and an open-source form tool such as KoboToolbox; in the US, a Mailer ID and the Postal Service's Informed Visibility scan data, with pyimb, a free Python library, to draw the barcode; Python for on-time shares with 95% confidence intervals. Volunteers mail only their own cards and publish only postcode districts, never full addresses.
First step
Recruit 20 volunteers, mail one round of 100 cards, and check that the arrival form and, in the US, the barcode scans line up.
Done looks like
1,000 cards over eight weeks among at least 100 volunteers in at least 50 postcode areas, on-time shares published with confidence intervals by route, plant paths for the US cards, a comparison with the regulator's figures for the same period, and the raw log released under an open license.
Open 02 · the brief
Parcels on fast trains
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open model that reads a high-speed rail operator's public timetable and estimates how many parcels a day could ride between each pair of cities in converted cars, how long they would take door to door with a van at each end, and how that compares with a truck.
Why it is still open
JR East now runs one converted train carrying about 1,000 boxes per run. Published studies of freight on high-speed lines deal mostly with China: a 2025 model of the Wuhan–Guangzhou line by Juhua Yang and colleagues, for example, was solved with Gurobi, a commercial solver, and came without code. This research found no open model that others could rerun on another country's timetable.
Built with what exists
GTFS timetables, the open format in which many rail operators publish schedules; Python with pandas; OSRM, an open road-routing engine, for the van and truck legs.
First step
Load one operator's GTFS feed and list every high-speed train between two large cities with its departure time and number of cars.
Done looks like
For one country, a published model and table for at least 20 city pairs giving parcels per day, door-to-door hours and truck hours, checked against JR East's figure of about 1,000 boxes and 17.4 metric tons per seven-car train.