Industries / Energy, water and waste / Pipelines and midstream
Gas processing and liquefied gas
Gas processing removes water, acid gases and heavier liquids from raw gas so it can go into pipelines; liquefaction chills the gas into a liquid, liquefied natural gas (LNG), so ships can carry it.
7
Milestones achieved, from 1930 to 2025.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
In depth
The same ground is charted in more depth, as an industry of its own.
The road
AchievedWatch forOpen
Achieved
1930
Amines scrub sour gas
Robert Roger Bottoms of the Girdler Corporation in Louisville, Kentucky, patented a process in 1930 that passes gas through water containing an amine, such as triethanolamine, which takes up carbon dioxide and hydrogen sulfide. Heating the liquid releases those gases so it can be used again. Amine treating is still the usual way to clean sour gas (gas containing hydrogen sulfide).
Credit
Robert Roger Bottoms, The Girdler Corporation
1944
The Cleveland explosion
On 20 October 1944 a storage tank of liquefied gas at the East Ohio Gas Company in Cleveland leaked vapor, which mixed with air and exploded; a second tank exploded about 20 minutes later. The fire killed 130 people and destroyed 79 homes. The Encyclopedia of Cleveland History says it led to new and safer methods for storing gas at low temperature.
Lessonvapor from leaking liquefied gas can travel, here through the sewers, before it ignites.
Credit
East Ohio Gas Company
1959
Liquefied gas crosses an ocean
In January 1959 the Methane Pioneer, a converted wartime cargo ship, carried LNG from Lake Charles, Louisiana, to Canvey Island, England.
Credit
Constock, a venture of Continental Oil (now ConocoPhillips) and Union Stockyards
1964
Regular trade begins
After the CAMEL liquefaction plant at Arzew, Algeria, was completed, the purpose-built Methane Princess delivered Algeria's first commercial LNG cargo to Canvey Island on 12 October 1964.
Credit
the CAMEL plant at Arzew; the Methane Princess
2017
Liquefaction moves offshore
On 1 April 2017 Petronas loaded the first cargo from PFLNG Satu, a floating plant that liquefies gas at sea over the Kanowit field off Sarawak, Malaysia, with a capacity of 1.2 million tonnes a year. Reuters reported it as the world's first LNG cargo from a floating production unit.
Credit
Petronas
2021
Plants without backup power stop
In the February 2021 freeze, gas processing plants in Texas and nearby states went down from lack of incoming gas, frozen equipment or power outages, according to FERC and NERC staff. Only 16 of the 50 plants that answered had any other power source, and backup generators could not run a whole plant.
Lessongas plants that need the grid can fail with it, which cuts gas to the power plants the grid needs.
Credit
FERC and NERC staff
2025
Satellites count LNG flaring
Laura Minet of the University of Victoria and colleagues used ten years of VIIRS Nightfire satellite data on 48 LNG export plants worldwide. Plants flared on an average of 148 days a year in normal running and flared about three times as much gas per unit of capacity in their first two years. World Bank figures were lower than the satellite estimates for about two-thirds of plants, and most environmental assessments overlook start-up.
Lessonstart-up is when a plant flares most, and planning papers leave it out.
Credit
Laura Minet and co-authors, in Environmental Science & Technology
Watch for
A net zero LNG plant
Woodfibre LNG in British Columbia says it "will be the world's first net zero LNG export facility," powered by hydroelectricity and using electric-drive compressors.
Achieved whenafter start-up, an outside party verifies its reported emissions, including how much of the net zero depends on carbon offsets.
Claimed by
Woodfibre LNG, on its website as read in November 2026
Open
01
Code the freeze reports
A public table of every air emission event report filed by Texas gas processing plants during the February 2021 freeze, each coded by cause: grid power loss, frozen equipment, loss of incoming gas, or other.
The briefCredit · unclaimed02
Forecast start-up flaring
Published, dated forecasts of how much gas each LNG export plant now under construction will flare in its first two years, made before start-up and scored later against satellite data.
The briefCredit · unclaimed
Open 01 · the brief
Code the freeze reports
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public table of every air emission event report filed by Texas gas processing plants during the February 2021 freeze, each coded by cause: grid power loss, frozen equipment, loss of incoming gas, or other.
Why it is still open
FERC and NERC staff named these causes but gave no counts by cause and named no plants. The Texas environment agency's database lets anyone search event reports by date and county and export them to a spreadsheet. No public table coded by cause was found.
Built with what exists
The agency's emission event database; an AI model that reads free-text reports (Note: "The jobs agents repeat"); two people to check the codes.
First step
Export the February 2021 reports and pick out the gas processing plants.
Done looks like
Every report from gas processing plants dated 10 to 28 February 2021 coded; two coders agree on at least 90% of a 100-report sample; the share of each cause published.
Open 02 · the brief
Forecast start-up flaring
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
Published, dated forecasts of how much gas each LNG export plant now under construction will flare in its first two years, made before start-up and scored later against satellite data.
Why it is still open
The 2025 study found start-up flaring far above later years and said most environmental assessments overlook it. No public register of forecasts was found.
Built with what exists
The study's published flaring rates; VIIRS Nightfire satellite data from the Payne Institute at the Colorado School of Mines; public lists of LNG plants under construction.
First step
List the plants due to start in 2027 and apply the study's start-up rate to each one's capacity.
Done looks like
Forecasts for at least ten plants posted before their first cargo; after two years of running, forecast against satellite totals reported for each.