BRENNEN

Industries / Government, education and community / Government / Military

Maintenance

Keeping vehicles, ships, aircraft and equipment fit for use: planned checks, repairs, overhauls at depots and shipyards, spare parts and the records that track them.

7

Milestones achieved, from 1951 to 2018.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1951

    Manuals told as cartoons

    In June 1951 the US Army began publishing PS, The Preventive Maintenance Monthly, a magazine that explains maintenance in comic-strip form as a companion to its technical manuals. The cartoonist Will Eisner, a former soldier, conceived it and drew it under contract from 1950 until October 1971, for 227 issues, The Comics Journal reports; the Army still publishes it, now online.

    army.miltcj.com

    Credit

    Will Eisner; US Army

  2. 1963

    Every check written down

    In March 1963 the US Chief of Naval Operations started the Navy's Maintenance and Material Management (3-M) system. It has two parts: a Planned Maintenance System that sets out, for each piece of equipment, every maintenance action it needs, and a Maintenance Data Collection System that records the work, which before had mostly been noted only in ships' logs. GAO reported the Navy still revising its 3-M manual in 2003.

    agris.fao.orgintrepidmuseum.libraryhost.comnavyadministration.tpub.com

    Credit

    US Navy, Office of the Chief of Naval Operations

  3. 2002

    Prediction ordered, rarely used

    In November 2002 the US Defense Department made condition-based maintenance plus (CBM+), servicing equipment when sensor data show it is needed rather than on a fixed schedule, its policy. In December 2022 GAO found that "the military services have not fully implemented predictive maintenance on any of its weapon systems": the Army had fitted all its Apache and Black Hawk helicopters with the sensors, yet "no Army aircraft regularly uses predictive maintenance to defer preventive maintenance or replace parts." GAO puts the cost of keeping US ground systems, ships and aircraft ready at $90 billion a year, and in October 2026 the Army told it that it was no longer pursuing predictive logistics as a standalone program.

    LessonA policy with no single office in charge and no agreed measure of success can stall for twenty years.

    gao.gov

    Credit

    GAO

  4. 2011

    Ships worn out early

    In early 2011 Australia's amphibious transport ship HMAS Manoora was to be decommissioned on the Chief of Navy's advice, and its sister ship HMAS Kanimbla was out of service for an extended period. A review led by Paul Rizzo found a "failure to manage assets on a 'whole of life' basis", a "'can do, make do' culture" and "an overall ineffectiveness of the Naval engineering function"; Defence accepted all 24 of its recommendations.

    LessonPutting off maintenance and running down engineering staff can end a ship's working life early.

    bairdmaritime.comaustraliandefence.com.au

    Credit

    Paul Rizzo

  5. 2017

    Parts taken from other ships

    The UK National Audit Office found in November 2017 that cannibalisation in the Royal Navy, taking a part from one ship or submarine to fix another, had risen 49% in five years, with 3,230 instances involving 6,378 parts, about 66 a month against 30 a month in 2005. The support organisation met 55% of crews' demands for parts by the required date, against a target of 75%, and the Ministry of Defence "does not routinely monitor the use, causes and impact of equipment cannibalisation".

    LessonTaking parts from one ship to fix another hides a failing spare-parts supply.

    nao.org.uk

    Credit

    National Audit Office

  6. 2018

    Idle for want of parts

    The German defense ministry's report on the readiness of the Bundeswehr's main systems in 2017, dated 26 February 2018, put the average number of ready CH-53 transport helicopters at 16 of the 40 available, out of 72 owned, and named missing spare parts and much longer shipyard stays among the causes for its submarines. Hans-Peter Bartels, the Bundestag's Commissioner for the Armed Forces, reported that at the end of 2017 all six German submarines were out of service, and urged that new equipment be delivered with its spare parts, test equipment and simulators. From 2019 the detailed figures went into a classified part of the report.

    LessonEquipment bought without its spare parts and test gear sits idle.

    dbwv.debundestag.debmvg.de

    Credit

    Hans-Peter Bartels, Parliamentary Commissioner for the Armed Forces

  7. 2018

    Submarines wait for shipyards

    GAO found in November 2018 that US Navy attack submarines had lost 10,363 days to idle time and maintenance delays from fiscal 2008 to 2018, costing more than $1.5 billion in fiscal 2018 dollars, and that USS Boise had sat idle at the pier for over two years waiting for a shipyard. In August 2026 GAO reported more than 15,000 operational days lost in fiscal 2016 to 2025, at $3.4 billion, and that 15 attack submarines will enter idle time from fiscal 2026 to 2030.

    LessonWhen shipyard capacity is the limit, the delays grow year by year.

    gao.govgao.gov

    Credit

    GAO

Watch for

  1. Answers from digitized manuals

    The US Army is piloting AI-Assisted Maintenance (AIAM), which answers technicians' questions from digitized technical manuals and fills in the DA Form 5988-E maintenance worksheet. DefenseScoop reported that 200 to 250 manuals had been digitized and about 4,000 users had given feedback; Stars and Stripes gave about 7,500 manuals. Col. Cory Armstead said early versions produced "a lot of hallucinations", answers the manuals do not support, and no formal accuracy figures have been published, though an Army article claims human review keeps the tool "100 percent accurate".

    Achieved whenan outside evaluator such as GAO, the DoD Inspector General or the Army Audit Agency measures answer accuracy and repair time, and the tool is in use across the Army.

    defensescoop.comstripes.comarmy.mil

    Claimed by

    US Army, July to October 2026

  2. A digital log book

    MetroStar, a US software company, says Travis Air Force Base "has directly purchased" its Iris platform, which gives aircraft maintainers an AI assistant for procedures and a "searchable digital log book", and projects "35,000+ potential annual work hours recovered".

    Achieved whenthe Air Force reports measured hours saved or errors avoided.

    blog.metrostar.com

    Claimed by

    MetroStar, July 2026

Open

  1. 01

    The not-ready call, tested

    A public question set drawn from the preventive maintenance checks and services (PMCS) tables in Army operator manuals for non-weapon equipment cleared for public release, such as tactical generators and trailers. Each table lists, item by item, what to check, when, and when the equipment is "Not Fully Mission Capable", that is, not fit for use. Describe a fault and ask AI models whether it makes the equipment not ready and which item says so, with answers checked against the manual.

    The brief
    Credit · unclaimed
  2. 02

    Hand-filled worksheets, read back

    A public set of made-up, hand-filled US Army maintenance worksheets (DA Form 2404 and DA Form 5988-E, on which crews record faults found during checks), photographed and scanned, each with an answer key for every field. Score AI readers on getting the fields right.

    The brief
    Credit · unclaimed

Open 01 · the brief

The not-ready call, tested

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public question set drawn from the preventive maintenance checks and services (PMCS) tables in Army operator manuals for non-weapon equipment cleared for public release, such as tactical generators and trailers. Each table lists, item by item, what to check, when, and when the equipment is "Not Fully Mission Capable", that is, not fit for use. Describe a fault and ask AI models whether it makes the equipment not ready and which item says so, with answers checked against the manual.

Why it is still open

The Army's own AI maintenance pilot has reported "a lot of hallucinations" and published no accuracy figures. Public tests of AI on manuals exist: TechManualQA-700 (Graz University of Technology and Know-Center, October 2025) has 700 questions from 20 manuals for home appliances, cars and power tools, and Enginuity (June 2026) tests vision models on parts tables and diagrams from US military repair manuals. Neither asks the readiness question.

defensescoop.comzenodo.orgarxiv.org

Built with what exists

Public operator manuals such as TM 9-6115-641-10, for the 5 kW tactical quiet generator, which is marked "Approved for public release; distribution is unlimited" and whose PMCS table has a "Not Fully Mission Capable if:" column (item 1: "Cannot secure door"); pdftotext to pull the tables; Inspect, an open-source evaluation framework; AI models such as Claude, Gemini and GPT, each asked every question several times (see the Note "All twenty times").

radionerds.com

  1. First step

    Pull the PMCS table from TM 9-6115-641-10 and write 50 fault descriptions with answers from its items.

  2. Done looks like

    300 questions from at least three public manuals, each answer and item number checked by two people, about a third of them faults that do not make the equipment unfit; at least four models scored on correct calls, correct item numbers, and how often they ground equipment that is fine or pass equipment that is not.

Open 02 · the brief

Hand-filled worksheets, read back

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public set of made-up, hand-filled US Army maintenance worksheets (DA Form 2404 and DA Form 5988-E, on which crews record faults found during checks), photographed and scanned, each with an answer key for every field. Score AI readers on getting the fields right.

Why it is still open

Stars and Stripes reported in October 2026 that these maintenance documents "for decades have been completed with pen on paper", and a 2021 Army test of a tablet version noted that the standard process "still requires the transfer of hard-copy 5988s." A 2026 benchmark scored 17 AI models on one handwritten medical form, with the best near 85% accuracy; I found no public set of maintenance worksheets.

stripes.comarmy.milarxiv.org

Built with what exists

Blank forms and the public manuals' check lists, with invented equipment, units and serial numbers; Tesseract and docTR, open-source text readers, as baselines; AI models that read images, such as Claude and Gemini (see the Note "Seven more flagged"); a small vision model fine-tuned on one GPU (see the Note "One GPU to fine-tune").

  1. First step

    Invent 20 equipment records and faults from a public manual's checks, and hand-fill 50 worksheets.

  2. Done looks like

    500 worksheets filled by at least 10 writers, published with answer keys; at least four readers scored on exact match for each field and on character error rate.