High-pressure water cleaning

High-pressure water cleaning, also called hydroblasting or water jetting, cuts scale, coke, polymer and sludge out of heat exchanger tubes, pipes and vessels with water pumped through hoses and nozzles at hundreds or thousands of bar.

7

Milestones achieved, from 1977 to 2026.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1977

    Machines lance five tubes

    Hammelmann, a German maker of high-pressure pumps, says its semi-automatic "Pipemaster" was in use by 1977, with several lances on one frame cleaning up to five heat exchanger tubes at once. The same company article says most tube bundles are now pulled from their shells and cleaned in dedicated bays by semi-automatic units, at about 600 to 3,000 bar (roughly 8,700 to 43,500 psi) depending on the deposit.

    construnews.com

    Credit

    Hammelmann

  2. 1980

    Contractors write a code

    UK contractors formed the Association of High Pressure Water Jetting Contractors in 1980, with Mike Donaldson as its first president. It ran its first training courses in 1981 at the British Hydromechanics Research Association in Cranfield, sold a short safety code that year for £1.25, and published its first full code of practice in 1982. Renamed the Water Jetting Association (WJA) in 1997, it merged its three codes, for high-pressure jetting, for drains and sewers, and for pressure washers, into one "Black Code" in 2026.

    waterjetting.org.ukpmc.ncbi.nlm.nih.gov

    Credit

    the Water Jetting Association and its founding contractors

  3. 1997

    A lance flies out

    On 23 June 1997 a crew from All Waste Environmental Services of Bangor, Maine, was clearing a blocked pipe at a paper company with a flexible lance, a hose with a jetting nozzle on its end, when the lance shot out of the pipe under pressure and seriously injured the man feeding it. A coworker, not he, was working the foot pedal that switched the water on and off, and the crew had not fitted a stinger, a rigid section longer than the pipe is wide that stops the nozzle turning around. Ruling on OSHA's citation after a 1998 hearing, a judge of the Occupational Safety and Health Review Commission accepted the testimony of the WaterJet Technology Association's president that a lance ejecting under pressure is "the most hazardous situation confronted in the waterjet cleaning industry today", and upheld a $7,000 penalty.

    LessonBoth safeguards were already in the company's safety manual, but crews could skip them without asking anyone.

    oshrc.gov

    Credit

    OSHA; Judge Ann Z. Cook of the Review Commission

  4. 2009

    Same rules, skipped again

    On 31 January 2009 a 40-year-old hydroblasting technician working for the contractor HydroChem Industrial Services was killed at Sherwin Alumina's plant in Gregory, Texas, when the hose end he was feeding into a 30-inch pipe turned around and left the pipe while jetting at 8,000 to 8,500 psi. The US Mine Safety and Health Administration (MSHA) found that the rigid section at the nozzle was about 17 inches long where the contractor's manual called for about 90, that the dump valve, the foot control that releases the pressure, was 25 feet away and worked by another crew member who could not see him, and that a deflection shield had not been used for over a year.

    LessonMSHA's root cause was that contractor management did not make sure its own procedures were followed, the same gap as in 1997.

    msha.gov

    Credit

    investigated by MSHA

  5. 2019

    Treating jet injection wounds

    Doctors working with the WJA published guidance for hospitals on wounds in which a water jet drives water and dirt under the skin, drawn from 42 cases: 26 from medical journals and 16 reported to the association. They wrote that such wounds must always be treated as contaminated and as surgical emergencies, and noted that many WJA members carry a medical card that warns hospital staff what kind of injury it is.

    pmc.ncbi.nlm.nih.gov

    Credit

    Sancho Rodríguez-Villar, Robert Charles Kennedy, Martino Dall'Antonia and Carlos Pilasi Menichetti, European Journal of Trauma and Emergency Surgery

  6. 2021

    A customer times automation

    Reym, an industrial cleaning contractor in the Netherlands, cleaned two identical heat exchangers of 540 tubes each, one with a standard lance positioner and one fitted with StoneAge's Sentinel controller and sensors, which move the lances from tube to tube automatically. Reym's Hylle Pol said a bundle that normally took 16 hours was fully cleaned in four.

    bicmagazine.com

    Credit

    StoneAge; timed by Reym

  7. 2026

    Hand lancing needs sign-off

    The hydroblasting procedure of Marathon Petroleum's Galveston Bay refinery, revised on 27 April 2026 and in force from 15 May, says automated equipment "shall be used" whenever feasible so that the operator is out of the line of fire, and requires Marathon's safety department to approve every job that is not automated. It applies whenever the pump can reach 5,000 psi (345 bar), and needs a corporate variance for hand-held "shotgun" lances shorter than 66 inches or for lancing without an anti-withdrawal device, a stop that keeps the hose from backing out of the tube.

    marathonrefinerycontractor.com

    Credit

    Blanchard Refining Company, Marathon Petroleum

Watch for

  1. AI tube cleaner without water

    Oceanit says its CorLance system cleans heat exchanger tubes autonomously, using AI and pneumatic action instead of a water jet, and that its drive can also survey the inside of each tube. The product page gives no figures, customers or field trials.

    Achieved whena plant owner or inspector outside Oceanit publishes a job done with it, with the number of tubes, the hours taken and the inspected condition of the tubes afterward.

    oceanit.com

    Claimed by

    Oceanit, January 2026

Open

  1. 01

    Prove each tube is open

    A camera check, done after cleaning with the pumps off, that photographs a straight-tube bundle's tubesheet with a light panel at the far end, finds every tube in the photo, marks each one open or still blocked from the light coming through, and saves a tube map with the job record.

    The brief
    Credit · unclaimed
  2. 02

    Time the cleaning methods

    A public table of how many hours, and how much water, it takes to clean heat exchanger bundles by hand lancing, by semi-automatic units and by automated systems, built from contractors' job tickets and coded by tube count, tube length, deposit and pressure.

    The brief
    Credit · unclaimed

Open 01 · the brief

Prove each tube is open

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A camera check, done after cleaning with the pumps off, that photographs a straight-tube bundle's tubesheet with a light panel at the far end, finds every tube in the photo, marks each one open or still blocked from the light coming through, and saves a tube map with the job record.

Why it is still open

Tools that exist record where the lance went, not whether the tube came clean. Automated positioners log which tubes the lance has entered and warn when it returns to one already cleaned (Thompson Industrial Services). Arkema's US patent 12,339,073, granted in June 2025, tracks work on each tube with cameras and colored indicator disks fitted to plates over the tube ends. A 2024 paper by Jinshuo Liang and co-authors finds the round tube openings in tubesheet photos so that a machine can aim its lance, and Eddyfi's TubePro software finds tubes in a photo to build inspection maps, with plugged tubes added by hand. No method found reports, tube by tube, whether each tube is open after cleaning, with a published accuracy.

industrial.thompsonind.comipiq.iodoaj.orgblog.eddyfi.com

Built with what exists

A phone or industrial camera and an LED light panel; OpenCV for finding round tube ends; an Ultralytics YOLO or Segment Anything model, fine-tuned on labeled tubesheet photos; a CSV tube map in the row-and-column layout that inspection software uses.

  1. First step

    Ask a cleaning contractor for permission to photograph three bundles in its cleaning bay after cleaning, with the pumps off, and label their tubes by hand.

  2. Done looks like

    At least 20 cleaned straight-tube bundles and 5,000 tubes photographed; every tube also checked by a person looking for light through it or passing a gauge; the software agrees on at least 99% of open tubes and catches at least 95% of blocked ones; photos, labels and code published.

Open 02 · the brief

Time the cleaning methods

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table of how many hours, and how much water, it takes to clean heat exchanger bundles by hand lancing, by semi-automatic units and by automated systems, built from contractors' job tickets and coded by tube count, tube length, deposit and pressure.

Why it is still open

The figures in print are claims by sellers or single jobs. NLB Corp., a maker of high-pressure pumps, said in a 2009 white paper that automated systems remove deposits 75% to 90% faster than manual methods, without the data behind it. Reym timed 16 hours against four for two 540-tube exchangers (2021); Thompson Industrial Services reports under 24 hours against "slightly more than 100 hours" for 1,156 tubes in an undated post; Tube Tech International said in 2019 that conventional jetting uses 25% more water than necessary and removes only 30 to 50% of fouling, with no outside test. A search for studies comparing the methods found only material from vendors and contractors, and no pooled comparison.

chemicalprocessing.combicmagazine.comindustrial.thompsonind.comhydrocarbonprocessing.com

Built with what exists

Anonymized job tickets from cooperating contractors; a model that answers the same fixed questions about each ticket, such as Gemini Decision 1 (see the Note "A thousand questions, one pass"); DuckDB or a spreadsheet; a simple regression of hours per 100 tubes on method, deposit and tube length.

  1. First step

    Ask two contractors, or the WJA or the WaterJet Technology Association on their behalf, for one turnaround's anonymized job tickets, and code 30 by hand to settle the fields.

  2. Done looks like

    At least 300 bundle jobs from at least three contractors coded, with a second person checking 50 of them; published medians and ranges of hours per 100 tubes and liters of water per tube for each method.