Industries / Transport and vehicles / Aviation / Helicopter services
Landing offshore
Landing offshore is the work of making platform, rig and ship helidecks safe to land on: their size, markings, lighting, airflow, motion, inspection and the handling of the helicopter once it is down.
7
Milestones achieved, from 1968 to 2023.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1968
Decks sized by helicopter length
Draft UK criteria of 1964 sized offshore landing areas by rotor diameter. The 1968 revision switched to the helicopter's overall length with rotors turning, called "D", and D still sets a deck's size, markings and obstacle-free zones. These criteria grew into CAP 437, the UK Civil Aviation Authority's (CAA's) standard for offshore landing areas, first published in September 1981 and now in its ninth edition (amended January 2026), which the CAA calls "a respected world-wide reference".
Credit
UK oil companies, helicopter operators and authorities (CAP 437's history does not name who published the 1964 and 1968 criteria); UK CAA for CAP 437
1992
A moving deck kills
In April 1992 a Sikorsky S-76 slid backwards on the helideck of the diving support vessel Mayo when a large wave struck it. The rotor disc dipped and killed the helicopter landing officer. In November 2001 a Super Puma slid and rolled onto its side on the drillship West Navion. The CAA says its research on moving decks began in 1992 partly in response to the Mayo accident.
Lessona helicopter on deck is braked and chocked but not tied down, so deck motion has to be measured, not judged by eye.
Credit
UK CAA research program
1995
Decks inspected at sea
CAA staff spent three and a half years inspecting offshore helidecks with the Health and Safety Executive (HSE), working with the British Helicopter Advisory Board. Their analysis, finished in April 1995, changed how decks are approved for use. Today the Helideck Certification Agency (HCA) inspects and certifies UK helidecks on behalf of the helicopter operators and publishes the Helideck Limitations List (HLL), which records each deck's known restrictions.
Credit
UK CAA, HSE, British Helicopter Advisory Board
2008
A turbulence limit, tested
Hot exhaust and air spilling around platform buildings make the air over a deck rough. BMT Fluid Mechanics, with QinetiQ and GE Aviation, ran a pilot-workload estimate over 16 months of flight data covering about 13,000 helideck landings. Only one landing exceeded the provisional limit, so the CAA lowered the advisory limit from 2.4 to 1.75 m/s (the standard deviation of vertical air speed over the deck) and put it in CAP 437 in December 2008. CAP 437 also asks operators to be told when exhaust can warm the air over the deck by more than 2 °C.
Lessonthe old 0.9 m/s mean vertical wind rule was dropped once the research could not link it to any hazard.
Credit
BMT Fluid Mechanics, QinetiQ, GE Aviation; funded by the UK CAA and HSE
2012
Lit circle and H
At night pilots need to find the right deck among the lights of a platform. CAP 437's seventh edition, in May 2012, gave the full specification for a lighting scheme of green perimeter lights, a lit touchdown circle and a lit "H". The 2018 amendment drew on in-service experience and completed equipment approvals, and CAP 437 now makes the scheme a requirement for night operations.
Credit
UK CAA research with the UK offshore industry
2023
Deck motion shown as lights
On floating decks a helideck monitoring system (HMS) measures pitch, roll, inclination and significant heave rate, plus a motion severity index and wind severity index that predict how likely the helicopter is to slide or tip once landed. CAP 437's ninth edition, in February 2023, brought together the specification for repeater lights on the deck: steady blue means safe to land, amber means land with caution and red means do not land. The CAA's research counted 28 occurrence reports on moving decks up to the end of 2016, three of them accidents, and found up to 39% involved misreported deck motion.
Credit
UK CAA research, with trials by Bond and Bristow and model validation by NLR
2023
Rotor blades break on deck
On 17 February 2023 an Airbus EC175 B, G-MCSH, shut down on the Elgin PUQ platform helideck after a gearbox chip warning, ahead of a storm. Its rotor brake failed, the blade tie-down straps could not be fitted, and the straps kept on the deck did not fit its tie-down points. The UK Air Accidents Investigation Branch (AAIB) found that air rising over the "cliff edge" of an accommodation block made the turning blades flap, and four blades broke off; one nearly struck a person strapping the helicopter down.
Lessona deck's airflow problems matter on the ground as well as in the air.
Credit
AAIB investigation, report May 2025, six safety recommendations
Watch for
Remote foam ring for helidecks
Woodside Energy says it designed, with Incos Engineering, a ring of pop-up nozzles that blankets the whole deck with fluorine-free foam and runs remotely, so no one has to stand at a foam cannon during a helicopter fire. It says fireground tests supervised by DNV and the training firm ERGT put out the fire in under 10 seconds, against a 30-second requirement, and that the system will be fitted on its Goodwyn A platform.
Achieved whenthe system is in service on Goodwyn A and a party outside Woodside, such as the regulator or a published verification report, confirms its performance.
Claimed by
Woodside Energy, June 2025
Wind profiles above the deck
Vaisala says its Elements helideck monitoring software is "the first and only software" to bring in high-resolution vertical wind profiles from its lidar, a laser wind sensor, up to 300 meters above deck level, along with site forecasts and lightning alerts within 100 kilometers.
Achieved whena helicopter operator, the HCA or a regulator publishes how the profiles are used in landing decisions, or an independent comparison shows them matching measured deck winds.
Claimed by
Vaisala, May 2025
Open
01
An open helideck airflow case
A public set of computer airflow (CFD) cases for a simple, fully described platform shape: an accommodation block with a helideck above it at air gaps of 0 to 6 meters. For each gap and for 24 wind directions, report the mean and turbulent vertical air speed 5 meters above the landing spot, set against CAP 437's 1.75 m/s and 2.4 m/s limits, with every mesh, setting and script released.
The briefCredit · unclaimed02
Downtime on floating helidecks
An open calculator that estimates, month by month, the share of hours a helideck on a floating production ship would be outside landing limits at a named field. It combines the ship's computed response to waves, wave records from a public hindcast (a computer reconstruction of past sea states), and CAP 437's public "stable deck" threshold of 1° pitch and roll and 0.4 m/s heave rate, plus any limits the user enters.
The briefCredit · unclaimed
Open 01 · the brief
An open helideck airflow case
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public set of computer airflow (CFD) cases for a simple, fully described platform shape: an accommodation block with a helideck above it at air gaps of 0 to 6 meters. For each gap and for 24 wind directions, report the mean and turbulent vertical air speed 5 meters above the landing spot, set against CAP 437's 1.75 m/s and 2.4 m/s limits, with every mesh, setting and script released.
Why it is still open
Designers must check each deck by wind tunnel or CFD, but the CAA's own wind-tunnel series on air gap, BMT's tests of a 1:100 Brae-A model at seven gaps in CAA Paper 2008/02, prints results as curves without the model's geometry, so no one can rerun it. SINTEF wrote in 2024 that CFD results can be trusted only if the right turbulence models are used, and no shared test case lets teams compare their choices. The nearest public code, a 2020 GitHub repository (PyTurb), post-processes one floating production ship's deck results from the commercial code KFX against the 1.75 m/s limit, without geometry or solver inputs.
Built with what exists
OpenFOAM (snappyHexMesh for meshing, large-eddy and RANS turbulence models), ParaView, Python, WebPlotDigitizer to read the CAA paper's curves.
First step
Digitize the air-gap curves in CAA Paper 2008/02 and build and run the zero-gap case.
Done looks like
Seven air-gap cases published under an open license; the trend in vertical turbulence with air gap compared, gap by gap, with the digitized Brae-A curves; two outside users rerun the cases and get results within 5% of the published numbers.
Open 02 · the brief
Downtime on floating helidecks
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open calculator that estimates, month by month, the share of hours a helideck on a floating production ship would be outside landing limits at a named field. It combines the ship's computed response to waves, wave records from a public hindcast (a computer reconstruction of past sea states), and CAP 437's public "stable deck" threshold of 1° pitch and roll and 0.4 m/s heave rate, plus any limits the user enters.
Why it is still open
About 63% of the roughly 540 registered North Sea helidecks were on moving units in 2010, according to an Offshore Engineer article by Athena Scaperdas and Paul Gallagher. The CAA's motion limits come from its own computer model, which its 2017 briefing called "not yet fully validated but considered fit for purpose", and type-specific limits sit in operators' manuals. No public tool links free wave records to these limits.
Built with what exists
Capytaine (an open-source solver for how a hull moves in waves), MET Norway's NORA3 wave hindcast, Python (xarray, NumPy).
First step
Compute a generic ship-shaped hull's motion response in Capytaine and run it against one year of NORA3 data at one Norwegian field.
Done looks like
Monthly out-of-limits percentages for at least five named fields over at least 20 years of hindcast, shown for several ship headings, with code and inputs public and one result checked against a published workability study.