BRENNEN

Industries / Health / Healthcare / HealthTech

Records

This is the work of building, selling, installing and running electronic health records (EHRs), the software that holds each patient's chart in hospitals and clinics and in which staff read results, write notes and place orders.

7

Milestones achieved, from 1967 to 2022.

3

To watch for: announced, not yet confirmed outside.

3

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1967

    A language for medical records

    Neil Pappalardo, Robert Greenes and Curt Marble wrote MUMPS (Massachusetts General Hospital Utility Multi-Programming System) in 1966–67 in G. Octo Barnett's Laboratory of Computer Science at Massachusetts General Hospital. It was a database kit with a built-in programming language, designed for building medical databases. Barnett licensed it at no cost to Digital Equipment Corporation, other sellers including Meditech, InterSystems and IDX followed, and in 1997 Greenes called it the most widely used programming language in medical applications. The same lab built COSTAR, which Greenes describes as the first computer-stored record for outpatient care, while the Harvard Community Health Plan was being formed.

    becker.wustl.edupmc.ncbi.nlm.nih.gov

    Credit

    G. Octo Barnett, Neil Pappalardo, Robert Greenes and Curt Marble, Massachusetts General Hospital

  2. 1972

    A whole hospital on screens

    From 1965 Lockheed Missiles and Space Company worked with El Camino Hospital in Mountain View, California, on one information system for the whole hospital. Doctors entered orders by pointing a light pen at lists on TV-style terminals, so no typing was needed, and nurses entered their observations at the same terminals; an outside evaluation by Battelle found nurses spent less time on clerical work. Lockheed sold the business to Technicon in 1971, the system was fully running at El Camino by 1972, and by 1993 more than 200 copies were installed in the US, Canada and Europe. In May 2026 the IEEE named it a Milestone, with a plaque that calls it "the first hospital-wide computerized medical information system".

    ethw.orgelcaminohealth.org

    Credit

    Lockheed Missiles and Space Company, El Camino Hospital and Technicon

  3. 1982

    A public-domain record system

    On 18 February 1982 VA Administrator Robert P. Nimmo signed an order organizing the US veterans' health service's own record software, the Decentralized Hospital Computer Program (DHCP), written in MUMPS. By 1985 it ran in 195 VA medical centers, and by 1996 it had been renamed VistA (Veterans Health Information Systems and Technology Architecture). Because VA wrote it with public money, its code is public domain and released under the Freedom of Information Act, and hospitals in Finland were the first outside the US to adapt it. In 2019 the US Government Accountability Office (GAO) counted about 130 versions supporting care at more than 1,500 sites, and in 2026 it wrote that VA had made three unsuccessful attempts over two decades to replace it before the current one.

    LessonA record system can outlive several attempts to replace it.

    worldvista.orgroute-fifty.comva.govgao.govgao.gov

    Credit

    VA and its DHCP developers

  4. 2005

    Deaths rose after go-live

    Computerized physician order entry (CPOE) is the part of a record system where doctors type orders directly instead of writing them on paper. A regional children's hospital affiliated with the University of Pittsburgh switched on a commercially sold CPOE system across the whole hospital in 6 days. Among 1,942 children brought in from other hospitals over 18 months, deaths rose from 2.80% (39 of 1,394) before the switch to 6.57% (36 of 548) in the 5 months after, and the system stayed linked to higher odds of death after adjusting for other factors (odds ratio 3.28). A 2006 study at Children's Hospital and Regional Medical Center in Seattle found no rise in intensive care deaths after its own CPOE start, which its authors put down to careful design, build, implementation and support.

    LessonHow a record system is switched on can change outcomes for patients.

    europepmc.orgeuropepmc.org

    Credit

    Y. Y. Han, J. A. Carcillo and colleagues, University of Pittsburgh; M. A. Del Beccaro and colleagues, Seattle

  5. 2016

    A Danish go-live audited

    Denmark's Capital Region and Region Zealand bought one system, Sundhedsplatformen, from the software company Epic, which says it was founded in a basement in 1979 and that more than 325 million patients now have a current record in its software. At about DKK 2.8 billion it was the largest IT investment in Danish health care up to then, and in the Capital Region it serves about 30,000 users and 1.8 million residents. It went live at Herlev and Gentofte Hospital on 21 May 2016, with doctors now entering the registration codes that medical secretaries used to type from their dictation. In June 2018 the national auditor, Rigsrevisionen, found the region had gone live without adequate testing or training and had planned for a 3-week fall in activity, yet 1.5 years later activity was still down at several hospitals; outpatient activity reported to the national patient register fell about 34% at Herlev and Gentofte right after go-live and settled 5% to 10% below its earlier level, though the auditor could not say how much of the fall was real and how much was faulty registration.

    LessonPlan for a long dip when go-live moves clerical work onto doctors.

    cdn.rigsrevisionen.dkepic.com

    Credit

    Rigsrevisionen, which audited it

  6. 2017

    Certified by typing the answers

    To earn US federal incentive payments, clinics had to use EHR software that had passed testing by an independent body approved by the Department of Health and Human Services (HHS). The Justice Department alleged that eClinicalWorks, one of the largest US sellers, passed a test of standardized drug codes by typing in only the 16 codes the test used instead of looking codes up in a complete database, and that its software did not accurately log user actions, did not reliably record imaging orders or check drug interactions, and did not let clinics move patient data to other vendors. In May 2017 the company, three founders and some staff agreed to pay $155 million in all, with no determination of liability. A five-year agreement with the HHS Inspector General made the company hire an independent software-quality reviewer and move any customer's data to another vendor without charge.

    LessonA test with fixed, known answers can be passed by software built only to pass it.

    justice.gov

    Credit

    US Department of Justice; whistleblower Brendan Delaney, a software technician for New York City

  7. 2022

    Orders lost in a queue

    In October 2020 VA's Mann-Grandstaff medical center in Spokane became the first VA site to move from VistA to a commercial record system from Cerner, which Oracle bought in June 2022. The VA Inspector General reported in July 2022 that through June 2021 the new system sent more than 11,000 orders for care to an "unknown queue", a location staff could not detect, without alerting the clinician who placed them. VA reviewers classified 149 resulting harms to patients (2 major, 52 moderate, 95 minor), and the Inspector General found no evidence that the vendor had warned VA about the queue before go-live. After feedback from veterans and clinicians that the system was not meeting expectations, VA halted further deployments in April 2023 while it fixed the five sites using it.

    LessonA record system must tell the clinician when an order does not reach its destination.

    oversight.govva.govgao.gov

    Credit

    VA Office of Inspector General, which reported it; GAO

Watch for

  1. VA's restarted rollout

    VA resumed its move to the Oracle Health record at four Michigan sites on 11 April 2026, finished 13 sites during 2026, and plans 26 more in 2027 and about 170 sites in all by 2031. Neil Evans, acting head of the program, said "the deployments in Michigan went remarkably well", and Deputy Secretary Paul Lawrence told lawmakers, "We have deployed in the schedule exactly as we said we would." GAO testified in September 2026 that VA had not fully carried out 14 of its 18 recommendations, including those on user satisfaction, trouble tickets and an independent operational assessment, a test of the working system by people outside the program.

    Achieved whenthe VA Inspector General, GAO or another outside assessor reviews the 2026 sites and reports that orders, referrals and prescriptions reach their destinations without the harms found at Spokane.

    nextgov.comnextgov.comgao.gov

    Claimed by

    US Department of Veterans Affairs, April to October 2026

  2. A record built around AI

    Oracle Health says its new EHR was "built from the ground up" with AI "embedded in every layer and workflow", lets clinicians ask by voice for a patient's recent results and current medications instead of clicking through screens, and will "nearly eliminate the countless hours of data entry" clinicians do. It passed US federal certification for outpatient clinics on 3 October 2025. In September 2026 Advisory Board, a research firm, reported it live only for early adopters, who said it was "not yet ready for broad-scale deployment".

    Achieved whenan outside study at clinics that switched to it measures documentation time and errors against their previous system.

    oracle.comadvisory.com

    Claimed by

    Oracle Health, November 2025

  3. Germany's record for everyone

    German statutory health insurers set up an electronic patient record (ePA) for each member who did not object, and since 1 October 2025 doctors and other providers have had to put findings, letters and medication data into it. In April 2026 gematik, the mostly federally owned agency that runs it, counted almost 73 million records, more than 100 million documents uploaded against 37.4 million downloaded, and up to 93,000 medical and dental practices opening records each week. In February 2026 the Federation of German Consumer Organisations (vzbv) said the record "is simply falling far short of expectations" and asked lawmakers for an independent evaluation; in its survey of 1,037 insured people, 71% did not manage their record themselves.

    Achieved whenan independent evaluation measures how often clinicians open the record during care and whether it holds the documents they need.

    gematik.dezwp-online.infoheise.de

    Claimed by

    gematik, April 2026

Open

  1. 01

    What a chart move loses

    A public test that moves the same synthetic patients between open-source record systems and counts, item by item, what is lost, changed or duplicated on the way. Generate 1,000 patients with Synthea from a fixed seed, load them into OpenEMR, move them to a second system such as OpenMRS or Medplum and back, using each system's own export and import tools and any community migration module. Compare every allergy, problem, medication, immunization, lab result, vital sign, procedure and encounter with the Synthea original, and log each difference as missing, altered (time, unit or code) or duplicated. Only made-up patients are used.

    The brief
    Credit · unclaimed
  2. 02

    A downtime drill, scored

    A repeatable drill kit for record-system outages, run in a simulation lab. Load a 20-bed ward of Synthea patients into OpenEMR, print the downtime reports a ward relies on (active medications, allergies, tasks due), then cut access for four hours while volunteer nursing and medical students carry out 100 scripted orders, medication doses and results on paper. When the system returns, they enter the paper record back in. Score every scripted item as entered correctly, missing, duplicated, at the wrong time or on the wrong patient, and time the back-entry. Only made-up patients and volunteers are involved.

    The brief
    Credit · unclaimed
  3. 03

    A register of go-live dips

    An open table of record-system go-lives around the world. For each: the organization, country, vendor, date, the fall in activity or productivity it planned for, and the fall it later reported, each figure linked to the page of the public document it came from.

    The brief
    Credit · unclaimed

Open 01 · the brief

What a chart move loses

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public test that moves the same synthetic patients between open-source record systems and counts, item by item, what is lost, changed or duplicated on the way. Generate 1,000 patients with Synthea from a fixed seed, load them into OpenEMR, move them to a second system such as OpenMRS or Medplum and back, using each system's own export and import tools and any community migration module. Compare every allergy, problem, medication, immunization, lab result, vital sign, procedure and encounter with the Synthea original, and log each difference as missing, altered (time, unit or code) or duplicated. Only made-up patients are used.

Why it is still open

A 2020 review of moves from one EHR to another found "scant literature" and no "corpus of systematic studies", only case reports such as a medication dose doubled during conversion; a 2019 study of one large implementation named incomplete data migration among the causes of changes in quality and productivity. The nearest tests are small. In 2024 Narf Group researchers round-tripped one Synthea file through OpenEMR, found it could not re-import its own export until three bugs were fixed, and saw time stamps cut to dates, but counted nothing. A 2026 OpenEMR migration module was tested on eight Synthea patients and does not import lab results, procedures or care plans. US certification requires every certified product to export all of a patient's electronic health information, and that of its whole patient population, and a public dashboard at joshuamandel.com grades the export documentation of 217 certified products, but it grades documents, not data that has moved: only 13 publish sample data.

pmc.ncbi.nlm.nih.goveuropepmc.orgnarf-blog.pages.devpackagist.orghealthit.govjoshuamandel.com

Built with what exists

Synthea, an open-source generator of made-up patient records; OpenEMR (GPL), OpenMRS (MPL 2.0) and Medplum (Apache 2.0) from GitHub; the oe-module-migration importer; Python for the item-by-item comparison; an AI coding agent such as Claude Code to write converters where no import path exists, with its losses reported beside those of the hand-built tools. Coding agents make it cheap to write a converter for each pair of systems, which is most of the work.

github.com

  1. First step

    Generate 100 Synthea patients, run the OpenEMR module's dry run and import, and compare allergies, medications and immunizations with the source.

  2. Done looks like

    1,000 patients moved in both directions between at least two pairs of systems; a table of lost, altered and duplicated items per record type for each route, with every item listed; the seed and scripts published so anyone gets the same counts; a bug report filed upstream for each kind of loss found.

Open 02 · the brief

A downtime drill, scored

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A repeatable drill kit for record-system outages, run in a simulation lab. Load a 20-bed ward of Synthea patients into OpenEMR, print the downtime reports a ward relies on (active medications, allergies, tasks due), then cut access for four hours while volunteer nursing and medical students carry out 100 scripted orders, medication doses and results on paper. When the system returns, they enter the paper record back in. Score every scripted item as entered correctly, missing, duplicated, at the wrong time or on the wrong patient, and time the back-entry. Only made-up patients and volunteers are involved.

Why it is still open

In 76 downtime-related safety reports from one US health system, Larsen and colleagues found downtime procedures were not followed or not in place in 46%, and wrote that "few provider organizations practice their downtime procedures or assess their ability". The US government's 2025 SAFER Guides include one on contingency planning for EHR outages, but it is a self-assessment checklist. Searches found no published count of the errors made when paper records are entered back after an outage.

pmc.ncbi.nlm.nih.govhealthit.gov

Built with what exists

Synthea; OpenEMR in Docker; a short script that prints downtime reports from the OpenEMR database; paper downtime forms; a nursing school's simulation lab; volunteer students as staff; a scoring sheet and spreadsheet.

  1. First step

    Write the 100 scripted items and run a one-hour pilot with four volunteers.

  2. Done looks like

    At least three drills of 100 scripted items each, with rates of missing, duplicated, wrong-time and wrong-patient entries and the back-entry time, comparing at least two downtime methods (for example printed reports against a read-only copy of the record), and the kit published so a hospital can rerun it.

Open 03 · the brief

A register of go-live dips

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table of record-system go-lives around the world. For each: the organization, country, vendor, date, the fall in activity or productivity it planned for, and the fall it later reported, each figure linked to the page of the public document it came from.

Why it is still open

Planners have no base rate. Denmark's Capital Region planned for a 3-week fall in activity after its 2016 go-live and still had lower activity at several hospitals 1.5 years later, and the Danish parliamentary auditors (Statsrevisorerne) faulted it for not using knowledge available from abroad and from consulting firms. The nearest prior work, KLAS Research's January 2025 report on EHR implementations, covers 22 newly live organizations but measures clinician satisfaction, not activity: 73% of them scored below average after go-live. Published studies follow one implementation at a time.

cdn.rigsrevisionen.dkklasresearch.comeuropepmc.org

Built with what exists

public documents such as national audit reports (Rigsrevisionen, GAO, the VA Inspector General) and NHS board papers, for example NHS England's March 2025 paper on record coverage; a model for extraction from long documents, such as Meta Muse Ember, to find candidate figures (see the Note "The jobs agents repeat"); two people to check each figure against its page; a CSV file on GitHub.

england.nhs.uk

  1. First step

    Log the Danish and VA go-lives from the reports cited here, then search NHS trust board papers for ten more go-lives since 2015.

  2. Done looks like

    At least 30 go-lives from at least 4 countries, each with its planned and reported dip (or "not reported"), every figure linked to its page and checked by two people with their agreement reported, and the median ratio of reported to planned dip length.