Secure landfill
A secure landfill holds hazardous waste that cannot be destroyed or recycled, either in lined cells at the surface or in rooms cut deep in salt, and must keep it away from water for decades or longer.
7
Milestones achieved, from 1972 to 2002.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1972
Waste stored in salt
On 4 September 1972 the first metric ton of waste salts from an oil refinery went into Herfa-Neurode, a worked-out potash mine near Heringen in Hesse, Germany. The disposal rooms sit about 800 m down in a stable salt layer about 300 m thick. Each delivery is checked and sampled, full rooms are walled off, and every container's place is recorded, so the site works "like a large warehouse," in the words of Hesse's environment agency. The trade journal Mining Report put the total at more than 3.5 million metric tons in 2023.
Credit
Kali und Salz, now K+S
1984
No burial without treatment
The 1984 amendments to RCRA, the main US hazardous waste law, banned putting untreated hazardous waste in or on the land. EPA had to set a treatment standard for each waste before it could be landfilled, diluting waste in place of treating it was prohibited, and waste could not be stored indefinitely to avoid treatment.
Credit
US Congress; US EPA
1985
A trusted clay pit leaks
The Kölliken special waste landfill in Aargau, Switzerland, took hazardous waste from 1978 until it closed in 1985, in a worked-out clay pit judged so tight that its builders left out an extra base liner. Waste declarations were vague, drums leaked, and water entering the landfill washed pollutants out; the site lies beside a groundwater stream from which about 200,000 people draw drinking water.
LessonFees of CHF 50 to 70 per cubic meter fell far short of the later costs, and about CHF 2 million was set aside at closure; the consortium estimated the full dig-out and cleanup at about CHF 706 million (October 2016) and all costs to 2020 at about CHF 860 million.
Credit
the SMDK consortium (the cantons of Aargau and Zurich, the city of Zurich and the Basel chemical industry)
1990
Liner layers slide apart
A 90 ft (27 m) high waste fill at the Kettleman Hills hazardous waste landfill in California slid up to 35 ft (11 m) sideways and settled up to 14 ft (4 m), sliding along the layers of its liner. Tests published in 1990 found friction angles as low as 8° between the plastic sheet, fabric, drainage net and wet compacted clay in the liner.
LessonThe authors advised running the same shear tests on the liner materials of every proposed landfill.
Credit
James K. Mitchell, Raymond B. Seed and H. Bolton Seed
1992
Leaks must be measured
An EPA rule of 29 January 1992 set out the double liner for new US hazardous waste landfill units: two or more liners with a leachate collection system above and between them, leachate kept under 30 cm deep on the liner, and an "action leakage rate," the most the leak detection layer between the liners can drain, against which the flow is checked weekly while the landfill is active.
LessonRecords from 187 double-lined cells at 54 landfills, analyzed for EPA in 2002, showed plastic-only primary liners built with quality checks often leaked less than 50 liters per hectare per day but sometimes more than 200.
Credit
US EPA
2002
Europe sets entry tests
A Council Decision of 19 December 2002 set leaching limits, the most of each substance that may wash out of a waste sample in a standard test, for waste accepted at EU hazardous waste landfills, to apply from 16 July 2005. Waste for underground storage needs a site-specific safety assessment instead. Sampling and testing must be done by independent, qualified people, though member states may let producers or operators do it under supervision.
Credit
Council of the European Union
2002
Fire ends reversible storage
Stocamine stored industrial hazardous waste about 550 m down in salt under Wittelsheim, Alsace, under a 1997 permit for 320,000 metric tons that was meant to be reversible. A fire in storage block 15 on 10 September 2002 ended deliveries. Some waste was removed from 2014 to 2017, but by 2023 the slow closing of the mine tunnels made further removal unsafe after 2027, and on 17 June 2025 the Strasbourg administrative court upheld sealing the rest in for good behind twelve concrete dams.
LessonRetrievable storage stays retrievable only while the mine stays open; the court accepted a worst case in which brine rising through the flooded mine pushes mercury above drinking-water limits over an area about 105 m long and 50 m wide near one shaft.
Credit
Mines de Potasse d'Alsace (MDPA), the operator; Strasbourg administrative court
Watch for
Twelve dams around Stocamine
MDPA says dams 1 to 8 of the twelve concrete dams that will seal the waste blocks are finished and dams 9 and 10 are under way, with confinement work scheduled into 2027 and the Joseph and Else shafts to be backfilled after. Work at height stopped after a worker fell 3.2 m on 30 March 2026 and resumed from 17 April.
Achieved whenall twelve dams and both shaft backfills are complete and the state's inspectors, or the outside study the prefect ordered, confirm the work.
Claimed by
MDPA, to the site's monitoring commission, July 2026
Hazardous waste landfills hold PFAS
The Defense Department's 2026 update of its PFAS disposal guidance calls hazardous waste landfills a strong option, because of double liners with leachate collection and leak detection and their extensive record-keeping, and says ordinary solid waste landfills are less suitable for concentrated firefighting foam and other liquid PFAS.
Achieved whenleachate and leak detection records from hazardous waste landfills that take PFAS waste are published and show the PFAS staying inside the liner system over several years.
Claimed by
US Department of Defense, March 2026
Open
01
A ledger of liner leaks
An open dataset of leak detection flows from double-lined US hazardous waste landfill cells, converted to liters per hectare per day and set against each cell's permitted action leakage rate, with a count of the months over the limit and what the operator did about them.
The briefCredit · unclaimed02
When the 30 years end
A public list of US hazardous waste land disposal units in post-closure care, the monitoring and upkeep owed after a landfill closes, with the date care began, the date the default 30 years run out, the latest groundwater status, and whether the regulator has extended, shortened or ended care.
The briefCredit · unclaimed
Open 01 · the brief
A ledger of liner leaks
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open dataset of leak detection flows from double-lined US hazardous waste landfill cells, converted to liters per hectare per day and set against each cell's permitted action leakage rate, with a count of the months over the limit and what the operator did about them.
Why it is still open
The largest study that included hazardous waste cells, done for EPA by Rudolph Bonaparte, David Daniel and Robert Koerner, covered 187 double-lined cells at 54 landfills and was published in December 2002. Its 2023 successor, by Pradeep Jain, Thabet Tolaymat and colleagues, covered 240 cell areas at 54 landfills, all of them municipal, and its data are available only on request.
Built with what exists
Monthly leak detection reports in state permit files and online portals, where the 2023 study found much of its data; EPA's RCRAInfo permitting tables through the Envirofacts API, to list landfill units (process code D80); pdftotext; a model built for pulling numbers out of long scanned reports, such as Muse Ember (see the Note "The jobs agents repeat"); Python.
First step
Pick one state with an online permit portal, find its hazardous waste landfills in RCRAInfo, and pull one year of leak detection reports for one cell.
Done looks like
Records for at least 30 hazardous waste landfill cells, each covering at least five years, every value linked to its source page, and the flow ranges compared with those of the 2002 study.
Open 02 · the brief
When the 30 years end
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public list of US hazardous waste land disposal units in post-closure care, the monitoring and upkeep owed after a landfill closes, with the date care began, the date the default 30 years run out, the latest groundwater status, and whether the regulator has extended, shortened or ended care.
Why it is still open
EPA's 2016 guidance says many facilities are nearing the end of their first 30-year period and that the 30-year default is not a finding that care can then stop. EPA's Inspector General wrote in 2001 that the 30-year figure "was based on a compromise and not on scientific research," and that most state agencies it sampled had no process to decide whether to extend care. In 2015 the Inspector General estimated that 54% of units in permitted post-closure care would reach the end of the period within ten years, but it published a count by year, not a list of units. A search found no public list.
19january2021snapshot.epa.gov19january2021snapshot.epa.gov19january2021snapshot.epa.gov
Built with what exists
RCRAInfo's permitting tables through the Envirofacts API, whose unit records carry a process code, legal and operating status and an effective date (a query for landfill units, process code D80, returned 5,662 unit records on 18 November 2026); EPA's ECHO site for inspections and violations; DuckDB; a coding agent that tests its own queries, such as one built on Inkling 2 Small (see the Note "Checked without being asked").
First step
Download the landfill unit records from Envirofacts, decode the status codes with RCRAInfo's data dictionary, and count the units in post-closure by state.
Done looks like
Every hazardous waste land disposal unit with a post-closure status listed, a care end date filled for at least 80% of them, and a check of 30 units against their permits that finds the dates right in at least 27.