Energy and emissions is the work of cutting the fuel that furnaces and kilns burn, and of cleaning and counting what leaves their chimneys. By the European Commission's Joint Research Centre (JRC), about 75 to 80% of the European glass industry's direct CO2 comes from burning fuel in furnaces, and the rest from carbonate raw materials giving off CO2 as they melt.
7
Milestones achieved, from 1615 to 2025.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1615
Coal replaces wood
In May 1615 a proclamation of King James I banned wood as fuel in English glasshouses, to save timber for shipbuilding, and noted that glass could now be made with "sea-cole, pit-cole and other fewell, without any manner of wood." Sir Robert Mansell had two glassmakers arrested in 1618 for still burning wood, and from 1623 to 1642 he held the monopoly on glass made with coal.
LessonA fuel switch set by law favors whoever already holds the new method, and Mansell used his coal patent to pursue makers who had not changed.
Credit
the government of James I; Sir Robert Mansell
1996
Gas ordered at Firozabad
In December 1996 the Supreme Court of India ordered 292 coal-burning factories in the Taj Trapezium Zone around Agra, including the glass pot furnaces of Firozabad that make bangles, to switch to cleaner fuels such as natural gas, or else move or close. The pot furnace owners had no gas-fired design. TERI (The Energy and Resources Institute), funded by the Swiss Agency for Development and Cooperation, developed a gas-fired recuperative pot furnace, one that uses exhaust heat to warm the incoming air. By TERI's own report it used nearly 30% less energy than other gas conversions, and over half of the town's 80-odd open-pot units adopted it.
LessonThe court ordered the switch before small furnace owners had a design that worked on gas, and their units faced closure until one was developed.
Credit
the Supreme Court of India; TERI and the Swiss Agency for Development and Cooperation
2019
Coal gasifiers shut at Morbi
On 6 March 2019 India's National Green Tribunal ordered every industrial unit in Morbi and Wankaner, Gujarat, that ran on coal gasifiers (plants that turn coal into fuel gas) to shut down. Ceramic, silicate and frit makers there could reopen on piped natural gas or other fuels that do not use coal. In February 2026 the tribunal dismissed appeals by 337 ceramic units against paying ₹122.05 crore (1.22 billion rupees) in environmental damage compensation for having used the banned gasifiers.
LessonA cheaper, dirtier fuel can be ordered out and billed for later, and the damage claims were still in dispute seven years after the ban.
Credit
the National Green Tribunal; the Gujarat Pollution Control Board
2021
Float glass on hydrogen
In 2021 Pilkington UK, part of NSG Group, ran its float glass furnace at St Helens on hydrogen for three weeks while making building glass, in a trial it called a world first. The trial belonged to the HyNet Industrial Fuel Switching project led by Progressive Energy, and BOC supplied the hydrogen. Pilkington's managing director said the hydrogen was "just as capable as natural gas" at melting; no outside measurement of glass quality was published with the result.
LessonThe fuel had to arrive by road, about 60 tankers for three weeks, so routine use depends on hydrogen pipelines that did not yet exist.
Credit
Pilkington UK (NSG Group); Progressive Energy; BOC
2023
A bottle furnace on electricity
In March 2021, 19 European container glass makers backed a "Furnace for the Future", to be built by Ardagh at Obernkirchen, Germany, and to run on 80% renewable electricity instead of the usual mix of about 80% gas. The EU turned down its grant, and in March 2022 the industry body FEVE said the project could not go ahead as planned. Ardagh then built its own hybrid "NextGen" furnace at Obernkirchen with German government and EU recovery funding, and its first amber bottles came out at the end of 2023. Ardagh says the furnace averaged 60% electric heating by mid-2024 and cut CO2 per bottle by 64%; Packaging Europe's report names no outside verifier.
LessonThe shared furnace stalled when its grant fell through, and Ardagh says raising the electric share has been difficult.
packagingeurope.comglass-international.comglasstec-online.compackagingeurope.com
Credit
Ardagh Glass Packaging, with furnace builder SORG; FEVE for the earlier joint project
2024
An electric brick kiln
In late 2024 Wienerberger began firing bricks in an all-electric kiln at Uttendorf, Austria, which went into regular operation in spring 2025 at 270 t of bricks a day. Wienerberger calls it the first industrial electric kiln for backing bricks and, after a year, says it cut the site's CO2 by 75% and its energy use by a third. The EU emissions register agrees on the direction: the site's verified emissions fell from 7,581 t of CO2 in 2022 to 1,499 t in 2025.
Credit
Wienerberger Austria
2025
Brick kilns sorted from orbit
In May 2025 the journal Scientific Data published an open map of about 11,000 brick kilns in Pakistan's share of the Indo-Gangetic Plain, found by machine learning on satellite images and checked by experts. It sorts each kiln as a fixed-chimney kiln or a zigzag kiln, a design in which the fire runs a zigzag path through the stacked bricks; citing earlier studies, the authors say a switch to zigzag kilns may cut carbon monoxide and soot by over 60%. The data and code are free on Zenodo and GitHub.
Credit
Muhammad Suleman Ali Hamdani and colleagues at the National University of Sciences and Technology in Islamabad, the University of Salzburg and the University of Oxford
Watch for
A hybrid furnace in Spain
Verallia opened its first hybrid furnace at Zaragoza, Spain, built with Sorg for €63 million, to melt bottle glass on 70% renewable electricity and 30% natural gas or biofuel. Verallia says it will cut the furnace's CO2 from fuel and bought power by around 50%, and its chief executive told analysts in February 2026 that it was running on up to 60% electricity.
Achieved whena full year of the site's verified emissions, set against its output, shows the cut, or an outside party measures it.
Claimed by
Verallia, April 2026
Toilets fired by electricity
Duravit opened a plant at Matane, Quebec, that fires washbasins and toilets at 1,260 °C in electric roller kilns about 100 m long, built by Riedhammer of the SACMI Group and run mostly on hydropower. Duravit calls it one of the first plants in the world to fire sanitary ceramics with electricity alone, and expects it, with shorter transport routes, to save about 9,000 t of CO2 a year and make up to 450,000 pieces a year once fully running in 2027.
Achieved whenthe plant reaches its rated output and an outside auditor or regulator reports its energy use and emissions per piece.
Claimed by
Duravit, November 2025
Open
01
Furnace claims against the register
A public table that sets each announced low-carbon glass furnace and ceramic kiln in Europe beside its site's verified CO2 emissions in the EU Emissions Trading System register, for the years before and after start-up, with a note on anything else that changed at the site.
The briefCredit · unclaimed02
Grid room for glass furnaces
A map of the United Kingdom's 32 glass furnaces showing, for each, the electrical load an all-electric or hybrid rebuild would need and the spare capacity at its nearest substation, from published grid data.
The briefCredit · unclaimed
Open 01 · the brief
Furnace claims against the register
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public table that sets each announced low-carbon glass furnace and ceramic kiln in Europe beside its site's verified CO2 emissions in the EU Emissions Trading System register, for the years before and after start-up, with a note on anything else that changed at the site.
Why it is still open
The percentages for new furnaces are the makers' own, and Packaging Europe's report of Ardagh's 64% cut per bottle names no outside verifier. The register already holds the site totals: Ardagh's Obernkirchen site reported 58,971 t of CO2 for 2022 and 38,983 t for 2025, about a third lower, while Wienerberger's Uttendorf brick site fell from 7,581 t to 1,499 t. A site total mixes every furnace and every change in output, so the two kinds of figure need explaining side by side, and no published comparison of the claims against the register was found.
Built with what exists
the European Commission's yearly verified-emissions spreadsheets for the EU Emissions Trading System, which list every installation from 2008 on; company press releases and annual reports for output and furnace counts; Python with pandas.
First step
Download the 2025 verified-emissions file and find the installations for the plants named in this domain (Obernkirchen, Zaragoza and Uttendorf), then write to each company asking how many furnaces or kilns the site runs.
Done looks like
at least 15 named furnaces and kilns, each with five years of site emissions, the maker's claim, and a one-line explanation of any gap, refreshed within a month of each new yearly file.
Open 02 · the brief
Grid room for glass furnaces
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A map of the United Kingdom's 32 glass furnaces showing, for each, the electrical load an all-electric or hybrid rebuild would need and the spare capacity at its nearest substation, from published grid data.
Why it is still open
British Glass says about 60% of the UK's 32 glass furnaces are due to be replaced within a decade, that fuel can be switched only when an old furnace reaches the end of its life, and that makers have been told of five-to-ten-year waits for a grid connection. Ardagh says its own furnace rebuilds from 2027 depend on access to suitable electrical infrastructure. No site-by-site match of furnaces against grid capacity was found.
Built with what exists
the network capacity maps and embedded capacity registers that UK distribution network operators publish; environmental permits and company pages for each furnace's site and capacity; published energy figures for electric melting, such as the JRC's; QGIS or Python with GeoPandas.
First step
Build the list of UK glass furnaces from company sites and permits, then download the capacity map of the network operator whose area holds the most of them.
Done looks like
all 32 furnaces placed on the map, each with a load estimate in megawatts, its nearest substation and that substation's published headroom, and the year of its next known rebuild, with the method reviewed by a network operator or British Glass.