Industries / Energy, water and waste / Power generation / Geothermal
Power plants
Power plants turn steam or hot water from geothermal wells into electricity, either by driving a turbine with the steam itself or by passing the heat to a second fluid that boils at a lower temperature.
6
Milestones achieved, from 1913 to 2023.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1913
First commercial geothermal plant
Nine years after Prince Piero Ginori Conti lit five light bulbs with geothermal steam at Larderello in Tuscany, Italy, the first commercial geothermal power plant, Larderello 1, went into service there with a 250 kW turbine. The IEA says it powered the railway system and villages in the area, and ThinkGeoEnergy says it also supplied the local chemical plants. ThinkGeoEnergy reported in 2024 that the Enel Group runs 34 geothermal power plants in Tuscany, supplying 34% of the region's electricity.
iea.blob.core.windows.netthinkgeoenergy.comthinkgeoenergy.com
Credit
Piero Ginori Conti; today Enel Green Power
1958
Power from hot water
Larderello ran on dry steam. Most geothermal fields hold hot water instead, and at Wairakei, New Zealand, the first turbine generated power on 15 November 1958 from "flash" steam: hot water under pressure that boils into steam when the pressure is let down at the surface. The New Zealand Geothermal Association calls Wairakei the world's second geothermal power station and the first to use flash steam from geothermal water. By October 1963 it had 191 MW of nameplate capacity. As the reservoir pressure fell, the operator, the NZ Electricity Department, retired two high-pressure units in 1982 and cut the station to 153 MW net. Later owner Contact Energy added a 14.3 MW binary unit in 2005 to use leftover 130 °C water and two 84 MW turbines at nearby Te Mihi in 2014.
Lessona plant has to be sized to the pressure the reservoir can hold over decades, not to its first years of output.
Credit
New Zealand Electricity Department; today Contact Energy
1960
The Geysers peaks and fades
Pacific Gas and Electric (PG&E) finished Unit 1 at The Geysers in northern California in 1960, an 11 MW plant running on steam bought from the developers Magma Power and Thermal Power. Its operator today, Calpine, calls it the first commercial geothermal electric unit in the Western Hemisphere. Many companies built plants on the same steam field, and by 1987 it had 21 plants and 2,043 MW installed. Calpine's history says output then fell fast for eight years as the steam reservoir lost pressure. Operators began joint studies of injecting extra water in 1989, and after Calpine bought 19 plants and their steamfields in 2000 it ran the field as one; its output has held at about 725 MW since 2009. A 2026 national laboratory report still calls The Geysers the largest single source of geothermal power in the world.
Lessona steam field shared by many plants and owners lost pressure once they drew more steam than it could resupply, and Calpine credits single ownership with letting it manage the field as a whole.
Credit
Magma Power Company, Thermal Power Company, PG&E; Calpine
1967
The first binary plant
At Paratunka on Russia's Kamchatka peninsula, Soviet engineers ran a 680 kW plant on water at only 81 °C. It was a binary plant: the hot water heated a second fluid, refrigerant-12, which boiled at a low temperature and drove the turbine, so the geothermal water never touched it. The water then heated greenhouses. In a 1979 survey for the US Department of Energy, Ronald DiPippo wrote that Paratunka is generally acknowledged as the first binary geothermal pilot plant to make electricity, and that it had been closed and dismantled because of leaks in the refrigerant piping; he also noted that the published test data were thermodynamically impossible as reported. Binary plants later became common for cooler resources: Ormat Technologies runs 46 of the 99 US geothermal plants, most of them binary, by the count of the National Laboratory of the Rockies (formerly NREL).
Lessonthe cycle worked, but a working fluid that leaked ended the plant.
Credit
Soviet engineers at Paratunka (tests reported by Moskvicheva and Popov, 1970); survey by Ronald DiPippo
2018
Lava overruns a plant
The 38 MW Puna plant on Hawaii's Big Island, run by Ormat, shut down on 3 May 2018 when Kīlauea erupted nearby. Lava covered the wellheads of three geothermal wells, monitoring wells, the plant's substation and a warehouse holding a drilling rig. The plant resumed partial operation in November 2020 at about 13 MW, and Ormat's natural-disaster insurance cover fell from about $100 million before the eruption to $30 million in 2020, by its own filing. Before the eruption Puna had also been an early example of a geothermal plant that follows demand: 8 MW of its 38 MW was set aside for flexible operation, with 3 MW of spinning reserve.
Lessona plant built on an active volcano carries a risk that insurers price after the event.
Credit
Ormat Technologies
2023
Growth shifts to new countries
The IEA reports that world geothermal power capacity rose almost 40% in the ten years to 2023, to nearly 15 GW, and that Türkiye, Indonesia and Kenya made more than three-quarters of the additions, helped in Türkiye by long-term contracts at fixed, government-set prices. Geothermal made just under 100 TWh in 2023, 0.3% of the world's electricity, but more than 10% of the supply in Kenya, Iceland, El Salvador, New Zealand, Nicaragua and Costa Rica. IRENA's 2026 statistics put world capacity at 15,674 MW in 2025, with Indonesia at 2,744 MW, Türkiye at 1,758 MW and Kenya at 925 MW.
Credit
national programs in Türkiye, Indonesia and Kenya
Watch for
Lithium from Salton Sea brine
The brine that geothermal plants pump up near California's Salton Sea carries lithium, and selling it could pay part of a plant's costs. BHE Renewables, which runs 10 geothermal plants in the Imperial Valley, and Occidental's subsidiary TerraLithium said in June 2026 that they had made lithium chloride from the brine, turned it into battery-grade lithium carbonate, and shown a process for lithium hydroxide. A local business paper wrote in August 2026 that the promised lithium industry had not yet arrived.
Achieved whena plant sells battery-grade lithium made from geothermal brine at commercial volume, confirmed by a regulator's report or an independent buyer's test.
Claimed by
BHE Renewables and TerraLithium, June 2026
Open
01
An output record per plant
A public record of the monthly net electricity made by every geothermal power plant in the United States and New Zealand since 2001, with each plant's capacity factor (output as a share of what it could make running flat out all year) on both nameplate and net capacity, its yearly decline, and a backtest: forecast each plant's 2021 to 2025 output from its 2001 to 2020 record and publish the error.
The briefCredit · unclaimed02
Measure how geothermal already flexes
A measured record of how often, how far and how fast each New Zealand geothermal station changes its output, from the public half-hourly generation of every station since 2015, set against wholesale prices, so that claims about flexible geothermal can be checked against what plants actually do.
The briefCredit · unclaimed
Open 01 · the brief
An output record per plant
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public record of the monthly net electricity made by every geothermal power plant in the United States and New Zealand since 2001, with each plant's capacity factor (output as a share of what it could make running flat out all year) on both nameplate and net capacity, its yearly decline, and a backtest: forecast each plant's 2021 to 2025 output from its 2001 to 2020 record and publish the error.
Why it is still open
The best-known plant-level study, by Bloomberg New Energy Finance in 2011, covered 71 fields in one year (2010), went to paying subscribers, and found that older fields in Japan and the Philippines ran lower because their productivity fell over time. A 2015 Idaho National Laboratory paper showed that EIA computes geothermal capacity factors on net summer capacity while other studies, such as BNEF's, use nameplate capacity, so published figures are not comparable. Searches of GitHub and Zenodo in November 2026 found no open plant-by-plant time series.
Built with what exists
EIA-923 and its predecessor forms (monthly generation by plant) and EIA-860 (capacity); the New Zealand Electricity Authority's half-hourly generation files, which list each geothermal station; Python with pandas; a low-cost AI model to pull dates of new wells, unit retirements and outages from operators' reports (see the Note "The jobs agents repeat").
First step
Download the EIA-923 files for 2001 to 2025, keep the rows with geothermal as the energy source, and plot the monthly output of The Geysers' plants.
Done looks like
Every US plant that reports to EIA and every New Zealand geothermal station, 2001 to 2025, published with code; a decline rate for each; and the median absolute percentage error of at least two forecasting methods against a "same as last year" baseline.
Open 02 · the brief
Measure how geothermal already flexes
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A measured record of how often, how far and how fast each New Zealand geothermal station changes its output, from the public half-hourly generation of every station since 2015, set against wholesale prices, so that claims about flexible geothermal can be checked against what plants actually do.
Why it is still open
The National Laboratory of the Rockies' 2026 market report lists only model studies on flexible geothermal and a few plant examples (Puna's 8 MW flexible block, load-following at The Geysers). A 2020 Berkeley Lab study by Millstein, Dobson and Jeong valued flexible operation from hourly prices at western US geothermal plants, not from their output. A November 2026 web search and Zenodo search found only modeling studies, and no measured fleet-wide record of ramping. New Zealand's Electricity Authority described geothermal in March 2026 as "steady" baseload supply and charted only daily and monthly totals.
Built with what exists
The Electricity Authority's Generation_MD files (half-hourly output per station; the October 2026 file lists at least 14 geothermal units, from Wairakei and Te Mihi to Ngāwhā) and its wholesale price files; Python with pandas and statsmodels.
First step
Download the October 2026 Generation_MD file and plot each geothermal station's half-hourly output for the month.
Done looks like
For every New Zealand geothermal station, 2015 to 2026: the number of half-hours spent below 90% of its rolling maximum, ramp rates in MW per half-hour, and the link between output and price, published with code and checked against at least one operator's own description of how it runs the plant.