Industries / Energy, water and waste / Power generation / Geothermal
Heating networks and ground heat pumps
This work heats buildings with warm water piped up from underground, either directly or through a district heating network, or uses heat pumps to draw low-temperature heat from the shallow ground and groundwater.
7
Milestones achieved, from 1332 to 2024.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1332
A village heated by springs
In Chaudes-Aigues, in south-central France, private owners took over the hot springs from 1332, among them the Par spring at 82 °C, and ran the water through wooden pipes under the stone floors of their houses, moved by gravity alone. Geothermal-DHC, a European research network (COST Action CA18219), calls it the first known geothermal house heating system in the world. As more houses joined, homes downstream ran short, and in 1854 the town banned private use and built nine public fountains. The system still runs: Geothermal-DHC says it reaches more than a hundred houses, while the local tourist office says 40 homes are still heated this way.
Lessona shared heat source needs rules for sharing once demand outgrows the flow.
Credit
the people of Chaudes-Aigues
1930
Reykjavík pipes in hot water
A farmer at Suður-Reykir near Reykjavík began heating his house in 1908 with water piped about 500 m from a hot spring. In 1930 a 3 km pipeline from the hot springs of Laugardalur began supplying some official buildings and about 70 houses in Reykjavík, the start of large-scale geothermal space heating in Iceland. Reykjavík District Heating, now Reykjavík Energy, was formally set up in 1946. By John Lund and Aniko Toth's 2020 worldwide review, geothermal heat's share of space heating in Iceland rose from 43% in 1970 to about 90%, and about 30 town systems and some 200 small rural ones now run in the country.
Credit
the City of Reykjavík; Reykjavík District Heating
1948
Well water heats an office
The Equitable Building in Portland, Oregon, opened in January 1948 with heat pumps for all its heating and cooling and no backup heater. Two wells about 150 ft (46 m) deep supplied water at 62 to 64 °F (17 to 18 °C), and the used water went down a third well, 510 ft (155 m) deep. The American Society of Mechanical Engineers (ASME), which named it a landmark in 1980, calls it the first heat pump installation in the western hemisphere. Its designers computed that each unit of electricity charged to heating would deliver 7.8 units of heat, counting pumps and heat recovered from cooling. Raw well water later scaled and corroded the chillers and coils, so heat exchangers were added to keep the well water in a separate loop.
Lessongroundwater that runs straight through the machinery wears it out; a closed loop behind a heat exchanger lasts longer.
Credit
J. Donald Kroeker and Ray C. Chewning (design); Charles E. Graham (building engineer); Pietro Belluschi (architect)
1969
Doublets under Paris
The Paris Basin's geothermal heat comes from the Dogger, a limestone aquifer about 1,800 m down holding salty water at a mean 75 °C. Each plant is a doublet: one well brings the water up, its heat passes to a city heating network, and a second well returns the cooled water to the same rock. The oldest such operation, at Melun-l'Almont, was commissioned in 1969. After the oil price shocks, 54 doublet plants were built, mostly from 1979 to 1984, by the French geological survey BRGM's 1988 count, and in 2020 the Dogger's 46 operations supplied heat to 6 to 7% of the region's 11 million people. The salty, sour water corroded and scaled the carbon steel well casings until operators began injecting corrosion inhibitors at the bottom of the wells.
Lessonthe chemistry of the water decides how long a well lasts, as much as its heat.
Credit
the plant operators and the cities they serve; BRGM
1986
Rotorua closes its bores
Rotorua, a New Zealand city built on a geothermal field, had more than 1,000 shallow wells by the 1970s, drawing hot water for heat and other uses and discharging most of it to waste. Hot springs and geysers declined, and the Waikite Geyser last erupted in 1967. From 1986 the government closed the wells within 1.5 km of Pohutu Geyser and required other users to change energy source or return the water underground, and net fluid loss fell from about 29,000 tonnes a day in 1985 to 4,400 in 1992. Aquifer pressure recovered faster than the surface features: springs reactivated from 1992, some overflowed for the first time in over 30 years, and some geysers have not come back.
Lessonmany small heating wells together can drain a field as surely as one power plant.
Credit
the New Zealand government; Bay of Plenty Regional Council, which manages and monitors the field
2007
Staufen's ground rises
In September 2007 the town of Staufen im Breisgau, Germany, drilled seven borehole heat exchangers, closed pipe loops in holes up to 140 m deep, to heat and cool its renovated town hall. Within weeks, cracks appeared in the town hall and nearby buildings. Baden-Württemberg's geological survey found that the grout sealing the space around at least one loop had failed, letting pressurized groundwater from deeper layers rise into anhydrite, a mineral that swells as it absorbs water and turns into gypsum. The ground rose up to 11 mm a month, more than 260 owners had reported damage by March 2013, and the peak rise reached 65 cm. The state, the towns of Baden-Württemberg and Staufen agreed in 2014 to share the first €30 million of damage costs, and in August 2026 the town was still pumping groundwater at about 5.4 liters a second to slow the swelling.
Lessona shallow heating borehole that links two water layers can damage a whole town center, so the seal matters as much as the depth.
Credit
Clemens Ruch, Gunther Wirsing and colleagues at the Baden-Württemberg geological survey (LGRB) for the investigation
2024
A gas utility's shared loop
In Framingham, Massachusetts, the utility Eversource drilled 88 boreholes about 650 ft (200 m) deep and joined them with a loop of water pipe to 37 homes, apartment blocks and commercial buildings, so that they draw heat from the ground and from each other. WBUR reported it as the first time a gas company had built such a networked geothermal system; the Boston nonprofit HEET proposed the idea to Eversource in 2017. The first building took heat from the loop on 26 August 2024, and Eversource is testing the system for 24 months from early 2025.
Credit
Eversource (Eric Bosworth, project manager); HEET (Zeyneb Magavi and Audrey Schulman); the City of Framingham
Watch for
Aarhus aims for 110 MW
Innargi says its first geothermal heating plant in Aarhus, Denmark, at Skejby, has fed the city's district heating network since 31 October 2025, and that with two more plants the system will reach 110 MW of heat, 20% of the city's district heating demand, and become the largest of its kind in the EU by 2030. In March 2026 the trade magazine GeoExpro reported, from a company spokesperson, that the single well pair delivers 17.5 MW, of which more than 85% is heat from the ground and the rest from heat pumps, and that the next wells are to be drilled from the first half of 2027.
Achieved whenthe metered heat delivered by all three plants is published by Kredsløb or a Danish authority and reaches the 110 MW plan.
Claimed by
Innargi, with the district heating company Kredsløb, October 2025
Open
01
Open register of heating plants
A free, downloadable list of every geothermal heating network and large direct-use plant in the world, each with its location, start year, number of wells, water temperature, heat output and status, and a public source for every figure.
The briefCredit · unclaimed02
Thermal tests from public files
An open, mapped set of thermal response test results, gathered from public reports. A thermal response test heats water circulating through a test borehole for a few days and measures how fast the ground takes the heat away; it is run before a large ground loop is designed. For each test, record location, depth, measured ground conductivity and borehole resistance, then measure how well geological maps predict the results.
The briefCredit · unclaimed
Open 01 · the brief
Open register of heating plants
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A free, downloadable list of every geothermal heating network and large direct-use plant in the world, each with its location, start year, number of wells, water temperature, heat output and status, and a public source for every figure.
Why it is still open
The United States has one: the 2025 update of its Geothermal Direct-Use Database, made for the National Renewable Energy Laboratory's market report, lists US sites with open and close dates and well data. For Europe, the GeoDH project's open map gives only the locations of cities with geothermal district heating, as of 2014. The International Geothermal Association keeps project-level maps of installed heat for 88 countries, but the detailed records are for members only. The world review by Lund and Toth gives totals by country, not plant by plant.
gdr.openei.orgzenodo.orggeoscience-central.compangea.stanford.edu
Built with what exists
Country update papers from the World Geothermal Congresses, free in Stanford's geothermal conference paper database; the US database and the GeoDH map as starting points; a low-cost AI model to pull plant facts out of PDFs (see the Note "The jobs agents repeat"); OpenStreetMap for locations; a spreadsheet published under an open license.
First step
Enter Iceland's town heating systems and the Paris Basin's Dogger plants from their 2020 country update papers into a template copied from the US database.
Done looks like
At least 500 plants in 20 or more countries, each with a source link; country totals of heat output within 20% of Lund and Toth's figures for space heating, or the gap explained; 50 entries picked at random and checked by hand, with fewer than five errors.
Open 02 · the brief
Thermal tests from public files
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open, mapped set of thermal response test results, gathered from public reports. A thermal response test heats water circulating through a test borehole for a few days and measures how fast the ground takes the heat away; it is run before a large ground loop is designed. For each test, record location, depth, measured ground conductivity and borehole resistance, then measure how well geological maps predict the results.
Why it is still open
In Italy's Po plain, Colucci and Moia found that measured test values were consistently better than values estimated from the local rock and soil layers, because moving groundwater carries heat, so loops designed from maps alone can be larger than needed. The largest open European compilation, from the EU's Cheap-GSHPs project, combines guidelines, literature and over 400 direct measurements of rock and soil, and leaves out the effect of groundwater flow. The US Geothermal Data Repository holds single-site test reports, such as one for Carbondale, Colorado, but searches of it, of Zenodo and of the web in November 2026 found no georeferenced collection of test results.
Built with what exists
Test reports in research data repositories and in public building project documents; an AI model that reads tables in PDF reports (see the Note "The jobs agents repeat"); state and national geological maps; Python.
First step
Copy the Geothermal Data Repository's community geothermal test reports for Carbondale, Colorado and Chicago into a template and record what each report gives.
Done looks like
At least 300 tests from one country or ten US states, each linked to its source report; 30 entries checked by hand, with conductivity within 5% of the report; a published error for map-based estimates against the measured values.