BRENNEN

Industries / Industrial equipment and services / Industrial machinery / Generators

Engines and turbines

This is the work of building the engines and gas turbines that spin the generator in a generator set (an engine and alternator on one frame, or genset) or a turbine-generator package.

4

Milestones achieved, from 1882 to 1992.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1882

    Engine bolted straight to dynamo

    At Edison's Pearl Street Station in New York, each "Jumbo" dynamo, an early direct-current generator, was coupled directly to a high-speed steam engine, where engines had usually driven generators through belts or ropes. That made the machine smaller and more efficient, ASME says. Commercial operation began on 4 September 1882, and one unit, No. 9, survived an 1890 fire and is at the Henry Ford Museum.

    asme.orgethw.org

    Credit

    Thomas Edison and the Edison companies

  2. 1897

    Diesel's engine passes its test

    On 17 February 1897 at Maschinenfabrik Augsburg, now part of Everllence (formerly MAN Energy Solutions), Rudolf Diesel's third test engine reached 26.2% efficiency under load, by DieselNet's account, against about 10% for steam engines of the day. It had one cylinder, ran at 172 revolutions per minute and was rated 14.7 kW (20 hp). It used compression ignition: the fuel lights from the heat of squeezed air, with no spark. The company's timeline says it built its first large-scale diesel power plant in 1904.

    dieselnet.comeverllence.com

    Credit

    Rudolf Diesel; Maschinenfabrik Augsburg

  3. 1939

    Gas turbine makes grid power

    Brown Boveri of Baden, Switzerland, built a 4 MW simple-cycle gas turbine for the municipal power station of Neuchâtel, 17.4% efficient. ASME calls it the "world's first successful electricity-generating gas turbine to go into commercial operation." It ran until 2002 and is now displayed at Alstom's factory in Birr.

    asme.org

    Credit

    A. B. Brown Boveri

  4. 1992

    Jet engine turned generator driver

    GE's LM6000 is an aeroderivative, a gas turbine adapted from an aircraft engine. GE says the first unit began commercial operation in 1992 at the Ottawa Health Services facility, and that in 2011 it shipped the 1,000th, to Black Hills Corp., whose Pueblo plant rates each turbine at 40 MW.

    geaerospace.com

    Credit

    GE

Watch for

  1. Engine plants for data centres

    Wärtsilä says it will supply a 282 MW on-site power plant of 15 Wärtsilä 50SG gas engines for a US data centre, for an unnamed independent power producer, with delivery in 2028 and full operation in 2029. Wärtsilä says this is its seventh US data-centre order, for more than 3 GW in all.

    Achieved whenthe plant runs and the operator or a regulator confirms that it supplies the data centre.

    wartsila.com

    Claimed by

    Wärtsilä, October 2026

  2. Supersonic-jet core as generator turbine

    Boom Supersonic announced Superpower, a 42 MW gas turbine sharing technology with its Symphony jet engine, and an order from Crusoe for 29 units (1.21 GW). On 25 September 2026 Boom's chief executive, Blake Scholl, said the two companies were no longer launching the turbine together; no turbines had been delivered. Scholl said Boom would deliver about 250 MW to other sites in 2027.

    Achieved whena Superpower unit makes power at a customer site and someone outside Boom confirms its output.

    boomsupersonic.combaxtel.com

    Claimed by

    Boom Supersonic, December 2025 and September 2026

Open

  1. 01

    Open genset block-load table

    A public, machine-readable table of how gensets respond to a block load, a large load switched on at once. The ISO 8528-5 standard measures this as the dip in frequency and voltage and the time to recover. Gather every value makers have published in spec sheets, white papers and test reports, mark each row as measured or claimed, and note whether it used the standard's step sizes.

    The brief
    Credit · unclaimed
  2. 02

    Fuel-by-load curves from spec sheets

    An open data set of fuel burn at 25%, 50%, 75% and 100% load taken from makers' spec sheets, with a fitted model that predicts the curve for any size and type of genset. Caterpillar's sheet for an 808 ekW C32 set, for example, lists 207.5 L/h at full load and 65.1 L/h at a quarter load, about 0.26 against 0.32 litres per kWh. Planning tools such as HOMER model fuel as a straight line, a no-load term plus a slope, and leave users to supply the two numbers.

    The brief
    Credit · unclaimed

Open 01 · the brief

Open genset block-load table

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public, machine-readable table of how gensets respond to a block load, a large load switched on at once. The ISO 8528-5 standard measures this as the dip in frequency and voltage and the time to recover. Gather every value makers have published in spec sheets, white papers and test reports, mark each row as measured or claimed, and note whether it used the standard's step sizes.

Why it is still open

Caterpillar's own white paper says the transient performance of a given genset "may not be well-publicized" and that data for custom load steps is usually "not available", so only estimates can be given. Spec sheets mostly state only that a set conforms to class G3, the strictest of the standard's three named classes. Searches of GitHub, Zenodo, Kaggle and Hugging Face in November 2026 found vendor white papers and one single-machine simulation, but no data set across makers.

emc.cat.com

Built with what exists

pdfplumber or pdftotext to read spec-sheet PDFs; Python with pandas; a CSV schema on GitHub; a DOI from Zenodo; an AI document reader to find the figures in long PDFs, every value checked by hand (the Note "Seven more flagged" covers an AI reviewer of long documents).

  1. First step

    Write the column schema (model, rating, step size, frequency dip, voltage dip, recovery time, source) and fill it from 10 public spec sheets and Caterpillar's white paper.

  2. Done looks like

    At least 100 genset models from at least 5 makers, each row linked to its source PDF, with a script that checks every row against the ISO 8528-5 class limits and reports how many claims lack measured figures.

Open 02 · the brief

Fuel-by-load curves from spec sheets

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open data set of fuel burn at 25%, 50%, 75% and 100% load taken from makers' spec sheets, with a fitted model that predicts the curve for any size and type of genset. Caterpillar's sheet for an 808 ekW C32 set, for example, lists 207.5 L/h at full load and 65.1 L/h at a quarter load, about 0.26 against 0.32 litres per kWh. Planning tools such as HOMER model fuel as a straight line, a no-load term plus a slope, and leave users to supply the two numbers.

Why it is still open

Searches of GitHub, Kaggle, Hugging Face and Zenodo in November 2026 found one GitHub project, built on synthetic data with no licence. Dealers' public fuel charts are labelled estimates, give no source and are all rights reserved. No open data set tied to named spec sheets was found.

github.comgeneratorsource.coms7d2.scene7.comsupport.ul-renewables.com

Built with what exists

pdfplumber or pdftotext; Python with pandas and statsmodels or scikit-learn; GitHub and Zenodo for release.

  1. First step

    Download 20 public spec sheets from three makers, extract the four load points, and measure how far each departs from a straight line.

  2. Done looks like

    At least 300 diesel and gas genset ratings with source links and a fitted intercept and slope for each, plus a held-out test that reports the size-only model's error in L/h at 25% load.