Safety and compliance is the set of duties, checks and records that keep the people in a building safe and healthy and keep its owner within the law.
7
Milestones achieved, from 1970 to 2023.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1970
Japan measures office air
Japan's Law for Maintenance of Sanitation in Buildings, enacted in 1970, sets indoor air standards for "specially designated buildings" of 3,000 square meters or more used as offices, department stores, entertainment venues and the like: carbon dioxide no more than 1,000 parts per million, carbon monoxide no more than 10 ppm, airborne particles no more than 0.15 mg per cubic meter, temperature from 17 to 28 °C (the lower limit is 18 °C today), relative humidity from 40% to 70% and air speed no more than 0.5 m per second. Owners must measure the air about once every two months and keep the records for inspection by local health centers. In 2020 researchers at the National Institute of Public Health reported that the share of buildings failing the temperature, humidity and carbon dioxide standards had risen since 1999 and jumped with the electricity saving that followed the 2011 earthquake.
LessonPressure to save energy pushed indoor air out of compliance even under a law that required it to be measured.
Credit
Government of Japan; Motoya Hayashi and colleagues, National Institute of Public Health
1974
Whoever controls the premises
Britain's Health and Safety at Work etc. Act 1974 gave each person who has, to any extent, control of non-domestic premises used as a place of work a duty to make the premises, the ways in and out, and the plant and substances in them safe "so far as is reasonably practicable" for people who are not their own employees. Section 4(3) extends that duty to anyone who has taken on the maintenance or repair of the premises by contract or tenancy, which brings facility contractors within it.
Credit
UK Parliament
1984
Sick buildings named
A 1984 World Health Organization committee report suggested that up to 30% of new and remodeled buildings worldwide might draw excessive complaints about indoor air, by the US Environmental Protection Agency's account. EPA's 1991 fact sheet defined sick building syndrome as complaints such as headache, eye, nose and throat irritation and fatigue, linked to time spent in a building, with no specific illness or cause found. It said problems often arise when a building is run or maintained in a way that does not match its design, and named low ventilation as a likely factor: after the 1973 oil embargo, energy measures had cut outdoor air from about 15 to 5 cubic feet per minute per occupant.
LessonFresh air cut to save fuel came back as complaints from the people breathing it.
Credit
World Health Organization; US Environmental Protection Agency
1992
Barriers out of old buildings
The Americans with Disabilities Act, signed on 26 July 1990, requires businesses open to the public, which the law calls "public accommodations", to remove architectural barriers in existing buildings where doing so is "readily achievable", meaning easy to do without much difficulty or expense, a test the Justice Department ties to the business's size and resources. The rules took effect on 26 January 1992 and give examples such as installing ramps, making curb cuts, rearranging furniture and display racks, and adding raised markings on elevator buttons.
Credit
US Congress; US Department of Justice
1992
Workplaces kept in repair
Britain's Workplace (Health, Safety and Welfare) Regulations 1992 require a workplace and its equipment, devices and systems to be "maintained (including cleaned as appropriate) in an efficient state, in efficient working order and in good repair", where appropriate under "a suitable system of maintenance". They also require a reasonable temperature indoors during working hours and enough thermometers for people to check it. They came into force on 1 January 1993, and from 1 January 1996 for most of their duties in workplaces already in use.
Credit
UK Government (Statutory Instrument 1992/3004)
2022
Air cleaners tested late
During the COVID-19 pandemic, bipolar ionization devices, which release charged particles into the air, spread into schools, churches and hospitals, along with photocatalytic devices, which use light and a coated surface to break down contaminants. In August 2021 California's public health department told school districts that no independent group had developed standard methods to measure how well such devices work in real conditions. In 2022 US Environmental Protection Agency researchers led by Katherine Ratliff tested both kinds in a large chamber with a recirculating air system: the best result for bipolar ionization was a reduction of 0.88 log10, about 87%, in airborne MS2, a harmless virus used as a stand-in, compared with runs with the device off; the photocatalytic device reached 1.8 log10 but raised ozone.
LessonBuildings bought air cleaners before there was an agreed way to test them.
Credit
Katherine Ratliff and colleagues, US Environmental Protection Agency; California Department of Public Health
2023
Clean air on demand
On 24 June 2023 ASHRAE, the US society of heating and air-conditioning engineers, approved Standard 241, Control of Infectious Aerosols, commissioned by the White House and written in six months from authorization, four of them in committee. It covers new and existing buildings and sets an "equivalent clean airflow" rate: the outdoor air, filtered air and disinfected air together that a room must receive during a declared period of high infection risk, which the authority having jurisdiction or the owner can call. Owners write a building readiness plan, and air cleaners must be tested to show they work and do not make the air worse in other ways, for example by raising ozone.
Credit
ASHRAE Standard Project Committee 241, chaired by William Bahnfleth
Watch for
Venues must plan for attacks
Britain's Terrorism (Protection of Premises) Act 2025, known as Martyn's Law, received Royal Assent on 3 April 2025. It will require those responsible for premises where 200 to 799 people may be present at once to have public protection procedures that staff follow if they suspect an attack, without any duty to alter the building or buy equipment, and premises and events of 800 or more to do more, with the Security Industry Authority as regulator. The Home Office published its statutory guidance on 15 April 2026 and expects an implementation period of at least 24 months from Royal Assent; nothing is required until the law comes into force.
Achieved whenthe duties are in force and the Security Industry Authority publishes inspection results showing what share of covered premises have the procedures in place.
Claimed by
UK Home Office, July 2026
Open
01
Barrier survey by phone
A test of whether a phone's depth sensor can do the measuring in an accessibility survey of an existing building. In 30 consenting buildings, measure door clear widths, ramp slopes and work-surface heights with an iPhone LiDAR app and again with a steel tape and a digital level, and score each phone reading as pass or fail against the 2010 ADA Standards: doors at least 32 inches clear, ramps no steeper than 1 in 12, and work surfaces from 28 to 34 inches high.
The briefCredit · unclaimed02
A register of air cleaners
A public register of air cleaning devices sold for commercial buildings, starting with in-duct and electronic devices such as ionizers, photocatalytic units and ultraviolet lamps. For each product it records what the maker claims, whether a test report exists under one of the methods ASHRAE Standard 241 accepts, who ran the test, the measured result and the device's ozone output.
The briefCredit · unclaimed
Open 01 · the brief
Barrier survey by phone
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A test of whether a phone's depth sensor can do the measuring in an accessibility survey of an existing building. In 30 consenting buildings, measure door clear widths, ramp slopes and work-surface heights with an iPhone LiDAR app and again with a steel tape and a digital level, and score each phone reading as pass or fail against the 2010 ADA Standards: doors at least 32 inches clear, ramps no steeper than 1 in 12, and work surfaces from 28 to 34 inches high.
Why it is still open
Barrier surveys of public buildings are still measured by hand. Xia Su and colleagues at the University of Washington built RASSAR, a phone app that uses LiDAR and computer vision to flag problems such as narrow doors and counters at the wrong height; across ten homes it found the problems with a precision of 0.86 and a recall of 0.83 when the researcher scanned, and counter height, judged against a 28 to 34 inch rule, was its weakest item (CHI 2024). Researchers at the University of Colorado Denver found phone LiDAR useful for checking sidewalks and curb ramps (reported December 2025), and an April 2026 preprint sets out checks for using phone scans in compliance surveys of care homes but says its validation study is still to come. A search found no published test of phone readings against tape and level for the doors, ramps and counters of public buildings.
Built with what exists
An iPhone Pro with its LiDAR sensor and apps such as Apple's Measure or Polycam; RASSAR's open source code (github.com/makeabilitylab/RASSAR) as a starting point for finding doors, ramps and counters in scans; a digital inclinometer and a steel tape as the reference; a vision model such as Claude to label elements in the photos; Python for the agreement statistics.
First step
Measure 20 doors, 5 ramps and 10 counters in one campus building both ways and compare the two sets.
Done looks like
At least 600 measured elements in 30 buildings, with the average error by element type and the share of the phone's pass or fail calls that match the tape-and-level result, published with the photos and readings.
Open 02 · the brief
A register of air cleaners
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public register of air cleaning devices sold for commercial buildings, starting with in-duct and electronic devices such as ionizers, photocatalytic units and ultraviolet lamps. For each product it records what the maker claims, whether a test report exists under one of the methods ASHRAE Standard 241 accepts, who ran the test, the measured result and the device's ozone output.
Why it is still open
California's public health department told schools in 2021 that there were no independent standard methods for ionization and similar devices. Addendum a to Standard 241, approved on 21 October 2024, names accepted methods, such as ANSI/ASHRAE Standard 185.1 or ISO 15714 with the MS2 virus for ultraviolet lamps in ducts. Pacific Northwest National Laboratory published lab tests of portable air cleaners in 2026, but a search found no public register of in-duct and electronic devices with results under the Standard 241 methods. EPA's researchers write that there are often few or no independent, non-commissioned assessments of how well such devices work.
Built with what exists
An AI agent such as Claude to collect product sheets and test reports from makers' websites; the California Air Resources Board's list of air cleaners certified for ozone emissions; a spreadsheet of Standard 241's equivalent clean airflow arithmetic; two people checking every entry against its source.
First step
List 25 in-duct devices marketed to US schools from 2020 to 2022 and ask each maker for its test reports.
Done looks like
100 products in the register, each with its claim, test method, laboratory, result and ozone status linked to the source document, and a published count of how many have results under a Standard 241 method.