Maintenance
Maintenance is the planned and unplanned upkeep of a building's heating and cooling, electrical, plumbing, roofs and walls, and the work of measuring what is wearing out and which repairs have been put off.
5
Milestones achieved, from 1989 to 2019.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1989
Campus repairs put off
The Decaying American Campus: A Ticking Time Bomb, a joint report published by APPA, the US association of college facilities officers, surveyed almost 700 colleges and universities. It estimated their renewal and replacement needs at $60 billion, $20.5 billion of it priority work, and found that in 1988 they put off four dollars of maintenance for every dollar they spent; putting repairs off to a later year is called deferred maintenance. Its lead author, Sean Rush, followed it in 1991 with Managing the Facilities Portfolio, published by NACUBO, the college business officers' association, which set out four steps for counting such needs and reporting them to management. The facility condition index, the cost of deferred repairs divided by the cost of replacing the building, became a common way for campuses to rate condition; APPA's journal described its development in 2001. In April 2021 APPA put the backlog of US higher education at more than $112 billion.
Credit
Sean C. Rush and Sandra L. Johnson; APPA; NACUBO
1995
A repair bill for schools
The US General Accounting Office (GAO, now the Government Accountability Office) surveyed a national sample of about 10,000 schools, 78% of which answered, and visited 41. It projected that US schools needed about $112 billion to repair or upgrade their buildings, that about 14 million students attended the third of schools needing extensive repair or replacement of at least one building, and that almost 60% of schools had at least one major building feature, such as plumbing, in disrepair. A second GAO survey, in 2020, estimated that 41% of districts needed to update or replace the heating, ventilation and air conditioning (HVAC) in at least half their schools, about 36,000 schools, and found that most states leave condition assessments to districts.
LessonDistrict officials told GAO that putting off maintenance from year to year for lack of funds was a major cause of the decline.
Credit
US General Accounting Office
1996
RCM comes to buildings
Reliability-centered maintenance (RCM) decides, for each piece of equipment, whether to run it until it fails, service it on a schedule or watch it for signs of trouble, depending on what a failure would cost. NASA wrote an RCM guide for its buildings and their equipment and put it in use in 1996; its 2008 edition says NASA Headquarters spent $15 million on RCM from 1995 to 1997. A study NASA commissioned from the firm EMR in 2000 put the agency's avoided costs at $26.8 million to $33.6 million, a return of 1.75 to 2.20 times the spend, and NASA centers reported about 10,000 faults found by predictive testing and inspection, such as vibration and infrared checks, averaging $2,724 of avoided cost each.
Credit
NASA; EMR, Inc
2008
A standard for HVAC upkeep
ASHRAE, the US society of heating and air-conditioning engineers, and ACCA, the Air Conditioning Contractors of America, published Standard 180-2008, which sets a minimum level of inspection and maintenance meant to keep a commercial building's HVAC delivering comfort, energy efficiency and acceptable indoor air. ASHRAE called it the first standard to address HVAC inspection and maintenance. Robert Baker, who chaired the committee, said some buildings followed strict maintenance policies while others ran equipment until it failed, and put HVAC and refrigeration at about 60% of a building's on-site electricity use.
Credit
ASHRAE; Air Conditioning Contractors of America; committee chair Robert Baker
2019
Every school in England surveyed
England's Department for Education ran its Condition Data Collection from 2017 to 2019. About 300 surveyors and engineers at a time visited 22,031 schools, 99.8% of government-funded schools, graded 211 kinds of building element from A (good) to D (bad: life expired or at serious risk of failure) and costed the repairs: £11.4 billion to fix every defect, with electrical services the largest share at £2.5 billion. A second round, CDC2, is visiting every school again from 2021 to 2026.
LessonThe survey is visual only; the department says it does not inspect structure or asbestos, so it prices only what a surveyor can see.
Credit
Department for Education, England
Watch for
Repairs without a site visit
Carrier says a pilot of its Abound building-controls platform, run with its own command centers across more than 2,100 clinics of an unnamed medical services provider, solved 78% of HVAC issues without sending a technician and cut monthly energy costs by about 6.5%. The claim was made by Ed Carney, a Carrier sales manager, at the American Society for Health Care Engineering's 2026 innovation conference; the pilot is still running.
Achieved whenthe provider or an outside reviewer publishes dispatch counts, fault records and energy bills from before and during the pilot.
Claimed by
Carrier, August 2026 (reported 3 September 2026)
Open
01
A school HVAC census
An open table of US public school buildings giving each building's heating and cooling system type, install year and condition grade, pulled from the facility condition assessments, bond documents and state inventories that districts and states already post, and joined to federal school ID numbers. Start with five states.
The briefCredit · unclaimed02
Grade condition from photos
An open set of 2,000 photos of building elements, such as roofs, windows, boilers and floor finishes, each graded A to D by two building surveyors working apart, using the grade definitions of England's Condition Data Collection. Then score AI vision models against the surveyors, and the surveyors against each other.
The briefCredit · unclaimed
Open 01 · the brief
A school HVAC census
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open table of US public school buildings giving each building's heating and cooling system type, install year and condition grade, pulled from the facility condition assessments, bond documents and state inventories that districts and states already post, and joined to federal school ID numbers. Start with five states.
Why it is still open
GAO's 2020 figure of about 36,000 schools needing HVAC work is a survey estimate with a margin of error of 9,000 schools, and GAO found that most states do not assess school buildings statewide. The Federation of American Scientists wrote in 2023 that there are no standardized national data sets on school facilities. Maine visited all 594 of its public school buildings in 2023 and 2024 and built a database that includes HVAC, which shows a state can do it, but it covers one state.
Built with what exists
A low-cost text model such as Claude Haiku 5.5 or Meta's Muse Ember (see the Note "The jobs agents repeat") to pull fields from PDF assessments; Python with pdfplumber; the National Center for Education Statistics' Common Core of Data for school IDs; a public schema on GitHub.
First step
Collect the condition assessments that 20 districts in one state have posted online and code the HVAC fields of five by hand to fix the schema.
Done looks like
At least 5,000 school buildings in five states with HVAC type, age and condition, each row linked to its source document, and 200 rows checked by hand with the error rate published.
Open 02 · the brief
Grade condition from photos
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open set of 2,000 photos of building elements, such as roofs, windows, boilers and floor finishes, each graded A to D by two building surveyors working apart, using the grade definitions of England's Condition Data Collection. Then score AI vision models against the surveyors, and the surveyors against each other.
Why it is still open
Fang and colleagues at University College London (2022) trained a model on 11,526 photos from commercial condition surveys, but to name the type of asset (72.2% test accuracy), not its condition, which they list only as a potential next use; they also say no large public inspection-and-repair photo set exists. England's CDC2 takes photos at every school, but its reports go to schools and their owners, not the public. Koch and colleagues (2018) and Yao and colleagues (2026) rated whole buildings from outside photos and street views against appraisers' or raters' scores, not the separate elements a surveyor grades.
Built with what exists
Phone cameras; Label Studio for grading; the CDC grade and priority definitions; vision models such as Claude Opus 5.5 and an open-weight model run locally; Python for agreement statistics such as Cohen's kappa.
First step
Ask one school or college estates team to let a surveyor photograph and grade 100 elements during a routine inspection.
Done looks like
2,000 graded photos from at least three sites, the two surveyors' agreement reported, at least three models scored on exact grade and on grades within one step, and the photos released with the owners' consent.