Removing and treating soil

This work digs polluted soil out of the ground and then treats it on the surface, sends it to a landfill or puts it back to use.

6

Milestones achieved, from 1997 to 2025.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1997

    A town's soil burned

    In 1982 EPA found that Times Beach, Missouri, had sprayed its dirt roads with waste oil that held dioxin, a toxic chemical by-product. In 1983 EPA gave the Federal Emergency Management Agency (FEMA) $30 million to buy out and move the town's residents and businesses. An incinerator built on the site then burned 265,000 tons of dioxin-polluted soil and other material from 27 sites in the area, and the digging and burning finished in 1997.

    LessonThe burn ended 14 years after the buyout; the land opened as Route 66 State Park in 1999, and EPA's 2012 reassessment found no significant health risk to visitors or park workers.

    cumulis.epa.gov

    Credit

    US EPA; FEMA

  2. 2010

    Olympic soil washed clean

    London built its 2012 Olympic Park on old industrial land. Soil washing scrubs dug-up soil with water to split off the fine particles that carry most of the pollution. By June 2010 five soil-washing machines, sorting machines and large-scale composting had cleaned nearly 2 million tonnes of polluted soil, and more than 80% of 1 million cubic meters of polluted soil had been cleaned and reused on the site, the trade press reported. The Environment Agency's closing tally in February 2012 gave 2 million tonnes of soil cleaned.

    theconstructionindex.co.ukbuilding.co.uk

    Credit

    Olympic Delivery Authority; Environment Agency

  3. 2012

    Britain taxes landfilled soil

    When Britain began taxing waste sent to landfill in 1996, soil removed to clean up polluted land was exempt if the tax office issued a certificate. From 2005 to 2008 about 850 applications a year sought the exemption for more than 2 million tonnes of soil a year. A 2008 order stopped new certificates from 1 December 2008 and ended the exemption on 1 April 2012, because treating soil on site was now "often considered to be best practice."

    LessonHMRC wrote that the break, meant to help cleanups, had become "a market distortion in favour of landfilling.".

    legislation.gov.uklegislation.gov.uklegislation.gov.uk

    Credit

    HM Treasury; HM Revenue & Customs (HMRC)

  4. 2019

    PFAS limit stalls earthworks

    PFAS are long-lasting man-made chemicals, often called forever chemicals. In July 2019 the Dutch infrastructure ministry allowed soil and dredged sludge to be spread on land only if it held at most 0.1 micrograms of PFAS per kilogram, unless the receiving site already held more. The building industry said 70% of projects that moved soil had stopped, and the broadcaster NOS reported that more than 85% of tested soil was over the limit. After builders protested in The Hague, the national health institute RIVM set temporary background values of 0.9 µg/kg for PFOS and 0.8 µg/kg for PFOA, two common PFAS, on 3 December 2019, and the ministry used them as its new temporary limit.

    LessonA limit set below the level already found in most ordinary soil halted reuse until it was tied to measured background levels.

    dutchnews.nlnos.nlrivm.nl

    Credit

    Dutch Ministry of Infrastructure and Water Management, under junior minister Stientje van Veldhoven; RIVM

  5. 2022

    Fukushima's topsoil moved to storage

    After the 2011 Fukushima Daiichi nuclear accident, Japan scraped off topsoil and gathered other waste to lower radiation in towns and farmland. From the end of fiscal 2014 to March 2022 almost all of it outside the restricted areas was trucked to an Interim Storage Facility of about 1,600 hectares in Okuma and Futaba, and about 14.30 million cubic meters of removed soil and waste had arrived by the end of March 2026, the environment ministry says. The International Atomic Energy Agency (IAEA) reviewed the ministry's plan for recycling and disposing of the soil for sixteen months and in September 2024 found it consistent with IAEA safety standards.

    LessonJapanese law requires final disposal outside Fukushima Prefecture by March 2045, and the ministry likens the pile to about 28,000 25-meter swimming pools.

    josen.env.go.jpiaea.org

    Credit

    Ministry of the Environment, Japan; IAEA review

  6. 2025

    Digging still leads

    EPA's Superfund Remedy Report, 18th edition, counted the cleanup decisions for soil at US Superfund sites in fiscal 2021 to 2023. Of 94 decisions, 43 (46%) chose off-site disposal, digging the soil up and trucking it away, and 28 (30%) chose to contain it on site, mostly under caps. Fifteen (16%) chose to treat dug-up soil above ground, and among all 125 decisions on sources of pollution, thermal desorption, heating soil to drive the chemicals off, was chosen once.

    LessonThe Superfund law sets a preference for treatment, yet digging and hauling or capping is still chosen more often than treating soil.

    epa.govepa.gov

    Credit

    US EPA Office of Superfund Remediation and Technology Innovation

Watch for

  1. Washing Kuwait's oily soil

    The Gulf War left oil lakes and oil-soaked soil across Kuwait's oil fields. The UN-backed Kuwait Environmental Remediation Program (KERP), with US$3 billion from the UN Compensation Commission, covers about 26 million cubic meters of oil-polluted soil. Kuwait Oil Company (KOC) gave two dig-and-treat contracts to a joint venture of Khaled Ali Al-Kharafi & Brothers and Lamor in 2021, and in May 2025 the trade journal MEED reported them 95% complete against their original terms, after KOC found an extra 5 million tonnes of polluted soil. Lamor says about 6.5 million tonnes had been cleaned by January 2026; CDE, which supplied the washing plants, said in September 2025 that more than 8 million tonnes had been cleaned by washing and by bioremediation in piles.

    Achieved whenKOC or the UN publishes the total tonnage treated and the oil left in it, checked by an outside laboratory or auditor.

    lamor.comguest.meed.comoilreviewmiddleeast.com

    Claimed by

    Lamor and its joint venture with Al-Kharafi, January 2026

  2. Reusing Fukushima's removed soil

    Japan's environment ministry says about 75% of the removed soil holds 8,000 becquerels per kilogram or less (a becquerel is a unit of radioactivity) and can be recycled in public works under managed conditions, which would shrink what must leave Fukushima by 2045. The Prime Minister's Office began using the soil in July 2025 and central government offices in Kasumigaseki followed in September 2025; a 2022 trial at Shinjuku Gyoen National Garden fell through after local opposition, and a road map aims to have plans for public-works and private reuse around 2030.

    Achieved whenremoved soil is used in a public-works project outside Fukushima at scale, with radiation monitoring published by an independent party.

    josen.env.go.jpenglish.adnkronos.com

    Claimed by

    Ministry of the Environment, Japan, July 2025 to July 2026

Open

  1. 01

    Track polluted soil after 2012

    A public yearly series, 2006 to 2025, of the polluted soil that England's permitted waste sites received, split into landfill and treatment or recovery, built from the Environment Agency's Waste Data Interrogator. Soil is coded in the European Waste Catalogue as 17 05 03* (soil holding hazardous substances) and 17 05 04 (other soil). The series then measures the change after April 2012 against HMRC's forecast.

    The brief
    Credit · unclaimed
  2. 02

    Map Kuwait's cleanup from orbit

    A yearly map, 2019 to 2026, of oil-polluted ground in Kuwait's Sabriya and Greater Burgan oil fields, made from free Sentinel-2 satellite images, showing how much has been dug up and cleaned since the KERP contracts began in 2021, compared with the tonnages KOC and its contractors report.

    The brief
    Credit · unclaimed

Open 01 · the brief

Track polluted soil after 2012

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public yearly series, 2006 to 2025, of the polluted soil that England's permitted waste sites received, split into landfill and treatment or recovery, built from the Environment Agency's Waste Data Interrogator. Soil is coded in the European Waste Catalogue as 17 05 03* (soil holding hazardous substances) and 17 05 04 (other soil). The series then measures the change after April 2012 against HMRC's forecast.

Why it is still open

HMRC's 2008 impact assessment forecast that ending the exemption would cut polluted soil sent to landfill by 0.4 to 0.6 million tonnes a year and promised a review of actual costs and benefits within three years. A search found policy commentary from 2008 to 2010 but no published before-and-after count for England, and the government's May 2025 consultation on reforming landfill tax gives tonnes landfilled by tax rate, not tonnes of polluted soil.

legislation.gov.ukdata.gov.ukgov.uk

Built with what exists

The yearly Waste Data Interrogator files on data.gov.uk (2006 to 2025, Excel extracts of waste received at each permitted site); HMRC's landfill tax statistics; Python with pandas or DuckDB; a coding agent that writes and tests a parser for each year's file layout, such as one built on Inkling 2 Small (see the Note "Checked without being asked").

  1. First step

    Download the files for 2010, 2011, 2013 and 2014 and total the tonnes of codes 17 05 03* and 17 05 04 received at landfills in each year.

  2. Done looks like

    A published series for 2006 to 2025, with code, giving the yearly tonnes of each soil code by type of site; national totals that match the Environment Agency's own summary tables within 5% for at least three years; and a stated estimate of the change after April 2012 set against HMRC's forecast.

Open 02 · the brief

Map Kuwait's cleanup from orbit

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A yearly map, 2019 to 2026, of oil-polluted ground in Kuwait's Sabriya and Greater Burgan oil fields, made from free Sentinel-2 satellite images, showing how much has been dug up and cleaned since the KERP contracts began in 2021, compared with the tonnages KOC and its contractors report.

Why it is still open

Satellite studies have mapped Kuwait's oil-polluted soil, including a 2022 machine-learning model by Gordana Kaplan and co-authors and a 2021 study of the Burgan field that used one set of February 2019 images. Neither tracks the cleanup year by year, and the program's progress figures come from contractors and the trade press.

api.openalex.orgpmc.ncbi.nlm.nih.govlamor.com

Built with what exists

Sentinel-2 images from the Copernicus Data Space Ecosystem; Google Earth Engine, or Python with rasterio; the spectral indices and random-forest method of Kaplan and co-authors; QGIS; a small open vision model fine-tuned on one graphics card to tell freshly dug ground from oil-polluted ground (see the Note "One GPU to fine-tune").

  1. First step

    Download cloud-free Sentinel-2 scenes of Greater Burgan for February 2019 and February 2026, and mark 50 points of oil lake or tarcrete (sand cemented into a crust by oil) that show in the first and are gone in the second.

  2. Done looks like

    Yearly maps for 2019 to 2026 that score at least 85% on 300 points hand-labeled from high-resolution images, a table of polluted area per year in each field, and a written comparison with the reported tonnages.