Industries / Energy, water and waste / Environmental services
Environmental remediation
Environmental remediation finds pollution in soil and groundwater and then removes, destroys or contains it, so that the land and water can be used safely again.
1980
In Lekkerkerk, near Rotterdam in the Netherlands, chemicals leaking from hundreds of drums buried under a new housing estate were found in the groundwater, and on 2 May 1980 the government ordered the estate emptied by 1 June so that the polluted ground could be dug out.
37
Milestones achieved across 6 domains.
7
To watch for: announced, not yet confirmed outside.
12
Open deliverables. Nobody has shipped them.
In one minute
Where it started
Cleaning up polluted land became an industry around 1980, after waste buried under homes came to light at Love Canal in New York and at Lekkerkerk in the Netherlands. The US Congress set up its Superfund for cleanups in 1980, and by January 1981 the Dutch government counted about 3,000 chemical waste dumps in the country, 300 of them a serious threat to health. The first answer was to dig the pollution out, but by the early 1990s the Dutch found that too costly for every site and began cleaning land only as far as its intended use required.
Where it stands
In the US, EPA counts 583,313 confirmed leaks from underground fuel tanks; 530,454 had been cleaned up and 52,859 were still waiting in March 2026. At US Superfund sites, digging polluted soil up and trucking it away is still the most common choice for soil, while polluted groundwater is now treated in place underground more often than it is pumped out. Worldwide, the UN's FAO and UNEP reported in 2021 that there are still "significant knowledge gaps and uncertainty about the number and extent of areas affected."
What is open
Much of what is known about cleanups sits in reports that consultants file with regulators, one site at a time. Open jobs turn those reports into checked public data: how in-place treatments begun since 2012 have worked, how fast PFAS break through carbon and resin filters, how long injected carbon barriers hold, and how often closed sites are reopened. Others build shared tests for AI that reviews Phase I site assessments, for methods that map plumes and forecast when a site will be clean, and for checks from satellites and aerial images.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Site investigation
Site investigation finds out which chemicals are in the soil and groundwater, where they are and how far they have spread, so that a cleanup can be planned.
6 · 1 · 2
Last achievedOne lab method for PFAS2024
Watch forPFAS tested in the field
2
openRemoving and treating soil
This work digs polluted soil out of the ground and then treats it on the surface, sends it to a landfill or puts it back to use.
6 · 2 · 2
Last achievedDigging still leads2025
Watch forWashing Kuwait's oily soil
2
openPumping and treating groundwater
This work pumps polluted groundwater up through wells and cleans it at the surface, often mainly to stop a plume, the spreading underground body of polluted water, from moving further.
6 · 1 · 2
Last achievedPumping falls from favor2025
Watch forReusable resin pays back
2
openTreating in place
Treating in place cleans polluted soil and groundwater where they lie, by pulling out vapors, heating the ground, or injecting chemicals, microbes or carbon, without digging the soil up or pumping the water out.
6 · 1 · 2
Last achievedResults from 235 projects pooled2016
Watch forCarbon barriers for decades
2
openMonitoring
Monitoring samples wells, soil gas and indoor air again and again, during and after a cleanup, to show whether pollution is shrinking, holding steady or moving toward people.
6 · 1 · 2
Last achievedA national vapor guide2015
Watch forSensors instead of well sampling
2
openClosing a site for reuse
Closing a site means deciding that polluted land is clean enough for a stated use, recording any limits on how it may be used, and handing it back for homes, work or nature.
7 · 1 · 2
Last achievedMinnesota reopens closed leak sites2024
Watch forChina's farmland safe-use claim
2
open
Advances to build with
3 research notes

Muse Ember
The jobs agents repeat
Meta's Muse Ember matched Claude Haiku 5.5 on an outside firm's tests at a third of the cost per task, though both list the same prices for text in and out.

Cursor Agent SDK
Findings that cite notes
Cursor released a kit for building AI agents, and its example, a code reviewer that cites the note behind each finding, is known only from Cursor's account.

Inkling 2 Small
Checked without being asked
The maker of Inkling 2 Small, Thinking Machines, says the AI model checks its work without being asked, a habit that no published test measures.
Open in environmental remediation
3 of 12 open deliverables
Open · Site investigation
Score AI on Phase I
A public test set of Phase I environmental site assessments, each with the public records the assessor used and the "recognized environmental conditions" (RECs, signs that a property is or may be polluted) the assessor found, plus a scored run of an AI agent given the same records.
Built with what exists
Public Phase I reports from city and state brownfield programs; EPA's public facility and cleanup-site databases; the Library of Congress's Sanborn fire-insurance maps and USGS historical topographic maps; a model built for long documents, such as Muse Ember (see the Note "The jobs agents repeat"); Gemini Decision 1 to answer a fixed yes-or-no question for each record (see the Note "A thousand questions, one pass"); an agent that cites the record behind each finding (see the Note "Findings that cite notes"); open agents such as matrix-esa-agent as a baseline.
Open · Removing and treating soil
Track polluted soil after 2012
A public yearly series, 2006 to 2025, of the polluted soil that England's permitted waste sites received, split into landfill and treatment or recovery, built from the Environment Agency's Waste Data Interrogator. Soil is coded in the European Waste Catalogue as 17 05 03* (soil holding hazardous substances) and 17 05 04 (other soil). The series then measures the change after April 2012 against HMRC's forecast.
Built with what exists
The yearly Waste Data Interrogator files on data.gov.uk (2006 to 2025, Excel extracts of waste received at each permitted site); HMRC's landfill tax statistics; Python with pandas or DuckDB; a coding agent that writes and tests a parser for each year's file layout, such as one built on Inkling 2 Small (see the Note "Checked without being asked").
Open · Pumping and treating groundwater
Rerun the 2004 pumping contest
Port the three 2004 pump-and-treat optimization problems (Umatilla, Tooele and Blaine) from their original MODFLOW96 and MT3DMS files to current open tools, MODFLOW 6 and FloPy, with a scoring script that checks every limit on pumping and concentration, and publish them as an open benchmark. Then test modern optimizers and an AI coding agent against the best 2004 answers.
Built with what exists
The ESTCP files on frtr.gov; MODFLOW 6 and FloPy from the US Geological Survey; open optimizers such as SciPy, pymoo or Nevergrad; a coding agent to convert the files and write tests, such as one built on Inkling 2 Small (see the Note "Checked without being asked").
Where it sits
Broader
In outline