Codes and permits
Codes are the written rules a design must meet, and a permit is the official approval, given after someone reviews the drawings, that lets building start.
6
Milestones achieved, from About 1750 BC to 2025.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
About 1750 BC
Builders answer for collapse
The laws of Hammurabi, king of Babylon, held builders responsible for their work: if a house fell and killed its owner, "then that builder shall be put to death", and a builder whose walls seemed about to topple had to make them solid at his own cost. The Louvre dates Hammurabi's reign to 1792 to 1750 BC.
Credit
Hammurabi of Babylon; English translation by L. W. King
1666
Rebuilding London in brick
After the Great Fire, an Act for rebuilding the City of London allowed only four types of house and required that "all the outsides of all Buildings" be of brick or stone. It appointed surveyors to enforce the rules, and a house built against them could be declared a "common nuisance" and pulled down.
Credit
Parliament under Charles II; the City of London's surveyors
1933
State review of school designs
A magnitude 6.4 earthquake hit Long Beach, California, on 10 March 1933 and damaged 120 schools, 70 of them destroyed. A month later the state legislature passed the Field Act, under which a state agency reviews the plans for every public school and the building work is inspected independently. The California Geological Survey says no school has collapsed in an earthquake since the act took effect.
LessonIndependent review of plans and inspection of the work can be judged by what happens in later earthquakes.
Credit
California State Legislature; the Division of the State Architect
1994
One US model code
A model code is a rulebook written by an expert body that governments can adopt into law. The three US groups that each wrote their own, BOCA, ICBO and SBCCI, formed the International Code Council (ICC) in 1994 to write one national set, and the ICC now publishes 15 codes.
Credit
International Code Council
2017
Grenfell changes UK approvals
A fire at Grenfell Tower in London on 14 June 2017 killed 72 people. The Building Safety Act 2022, law from 28 April 2022, created a building safety regulator and stricter rules for "higher-risk buildings", and the public inquiry's final report of 4 September 2024 found that the deaths were all avoidable and recommended a single construction regulator.
LessonThe inquiry found that people had been failed "in most cases through incompetence but in some cases through dishonesty and greed.".
Credit
the Grenfell Tower Inquiry; UK Parliament
2025
Approvals from 3D models
Singapore's Building and Construction Authority (BCA) began requiring architectural BIM submissions for projects over 20,000 m² in 2013, which GoGeomatics reported BCA calling the world's first BIM electronic submission. Since 1 October 2025, new projects of 30,000 m² gross floor area or more must use CORENET X, which replaces more than 20 approval stages across 7 agencies with 3 submissions.
Credit
the Building and Construction Authority, Singapore, with six other agencies
Watch for
AI pre-check of house plans
Los Angeles city and county launched a pilot of Archistar's eCheck tool for people rebuilding homes lost in the Palisades and Eaton fires: applicants upload plans and the tool checks them against building and zoning rules before formal submission, which city staff still review. Archistar says its tool can "cut permit processing times by up to 55%" and gives no basis for the figure.
Achieved whenThe city or an independent auditor publishes data showing that pre-checked plans are approved faster or with fewer rounds of corrections, and that the tool's findings match those of human plan checkers.
Claimed by
the City of Los Angeles, Los Angeles County and Archistar, July 2025
AI first drafts for planners
The UK housing ministry is testing a prototype called Augmented Planning Decisions, which sorts applications for home extensions and similar small projects, summarizes them and gives planning officers a first assessment, with the aim of halving processing time. Trials are running in Barnet, Camden and Dorset, and a qualified officer must approve every assessment. Planning permission covers land use and is separate from building regulations approval.
Achieved whenPublished trial results, checked by someone outside the ministry, show shorter times with decisions no worse in quality.
Claimed by
UK Ministry of Housing, Communities and Local Government, June 2026
Open
01
Public test for plan checks
A public set of house plan sets, each reviewed by a certified plan examiner, to score software that checks plans against the building code. Cover the checks these tools already claim: room sizes, ceiling heights, window area and plumbing fixtures.
The briefCredit · unclaimed02
Why plans get sent back
Sort every reviewer comment in Seattle's open plan-comments data by the code requirement it cites and the kind of fix it asks for, and publish a ranked list of the most common corrections for each type of review.
The briefCredit · unclaimed
Open 01 · the brief
Public test for plan checks
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public set of house plan sets, each reviewed by a certified plan examiner, to score software that checks plans against the building code. Cover the checks these tools already claim: room sizes, ceiling heights, window area and plumbing fixtures.
Why it is still open
Los Angeles County's March 2026 workshop slides for fire rebuilds show Archistar's AI PreCheck testing glazing, room dimensions, ceiling heights and fixtures, with a planner still reviewing each report. Archistar publishes no accuracy, miss rate or false-flag rate for its checks.
Built with what exists
Plan sets drawn for the test, or donated with permission; a certified plan examiner as the answer key; vision-language models as checkers.
First step
Draw two small house plans with five planted code failures each, and have one plan examiner mark them.
Done looks like
At least 50 plan sets and 500 individual checks, published with a table of agreement with the examiner for at least two tools.
Open 02 · the brief
Why plans get sent back
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
Sort every reviewer comment in Seattle's open plan-comments data by the code requirement it cites and the kind of fix it asks for, and publish a ranked list of the most common corrections for each type of review.
Why it is still open
The City of Seattle publishes 26,299 comments its reviewers wrote on building plan sets, with the review type, the review round and the text. The most common letter is the first-round zoning correction, with 4,082 comments. This research found no published analysis that ranks the corrections.
Built with what exists
Seattle's dataset; Python; a model that chooses from a fixed list of answers, such as Gemini Decision 1 (see the Note "A thousand questions, one pass"), with a person checking a sample.
First step
Download the dataset and label 200 comments by hand to settle the list of categories.
Done looks like
All 26,299 comments labeled, a second person agreeing with at least 90% of 500 randomly chosen labels, and a published table of the 25 most common corrections for each review type.