Environmental limits

This work sets and polices the rules that keep dredging from harming the water around it: where dredged material may be dumped, how much mud may drift away, when work must stop for wildlife, and what happens when a forecast of harm turns out wrong.

5

Milestones achieved, from 1972 to 2015.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1972

    Sea dumping needs a permit

    The London Convention, adopted on 13 November 1972 and in force from 30 August 1975, listed wastes that may not be dumped at sea and required a permit for others. Its 1996 Protocol, in force from 24 March 2006, turned this around: all dumping is banned except for a short "reverse list" of materials, each still needing a permit. Dredged material is first on that list. The International Maritime Organization (IMO), which has run the Convention since 1977, counts 56 parties to the Protocol.

    imo.orgimo.org

    Credit

    the Intergovernmental Conference on the Dumping of Wastes at Sea, London, 1972; IMO

  2. 1992

    Hopper dredges guard turtles

    A hopper dredge sucks sediment up through dragheads trailed along the bottom, and these can draw in sea turtles. USACE's research center (ERDC) counted 693 turtles taken by dredges in the southeastern United States from 1980 to 2011: 471 loggerheads, 87 greens, 74 Kemp's ridleys and 61 not identified, at 44 of more than 77 monitored sites. From 1992 USACE used a set of protections: other dredge types where possible, work windows set by water temperature and nesting season, rigid deflectors on the draghead, less pumping while the draghead is off the bottom, and trawlers that catch turtles and move them away. The deflector pushes a ridge of sediment ahead of the draghead that cushions any turtle it meets. In fiscal 2004 the Jacksonville District required its hopper dredges to carry rigid deflectors and to screen all inflow or overflow through openings from 4 by 4 inches, with inspectors approved by NOAA's National Marine Fisheries Service (NMFS) checking the screens around the clock so that every take is recorded.

    dots.el.erdc.dren.milseaturtles.el.erdc.dren.mil

    Credit

    USACE (ERDC; Jacksonville District); NMFS

  3. 1995

    A spill cap at Øresund

    For the bridge and tunnel between Copenhagen and Malmö, the rules said that sediment spilled from dredging and land building must not exceed 5% on average, and that the finished link must not block the flow of water into the Baltic Sea, which was achieved by dredging extra areas to compensate. The contractor reported daily spill and dredged quantities to the control authorities, and a "feedback monitoring" program of eelgrass, mussels and other sensitive life was set up to allow early intervention. From 1995 to 1998 about 14 million t of seabed was dredged and about 0.6 million t, 4.2%, was spilled, by the figures of a study published by the Geological Survey of Denmark and Greenland (GEUS).

    iadc-dredging.compub.geus.dkecoshape.org

    Credit

    Øresund Marine Joint Venture (Per Aarsleff, Great Lakes Dredge & Dock, Ballast Nedam Dredging); the Danish and Swedish governments

  4. 2013

    PortMiami reef damage underestimated

    USACE's environmental impact statement for deepening the PortMiami entrance channel forecast 3.3 acres of reef removed outright, and did not put a number on harm from settling sediment. Dredging ran from November 2013 to April 2015 and removed a reported 4.4 million m³. Instead of the blasting the statement described, the cutterhead was used to grind rock with its suction off, which leaves fine "rock flour" in the water, and there were no limits on overflow from hoppers. Surveys by NMFS in December 2015 and April 2016 found sediment over hard bottom in 42% of observations near the channel against 7% at reference sites, and NMFS estimated severe harm over about 278 acres of reef. A lethal coral disease broke out in the area during the dredging.

    LessonNMFS says the gap between forecast and monitoring calls for re-examining how harm is forecast and watched, and USACE has committed to ban rock grinding and overflow near reefs for a later project at Port Everglades.

    miamiwaterkeeper.org

    Credit

    USACE (project); NMFS (assessment, published August 2023)

  5. 2015

    Reef park bans spoil dumping

    From 2 June 2015, the Great Barrier Reef Marine Park Authority in Australia may not permit dumping of more than 15,000 m³ of capital dredge material, spoil from digging new or deeper channels, in the Marine Park. The same regulation revoked a January 2014 permit to dump 3 million m³ from the expansion of the Abbot Point coal port.

    LessonWWF-Australia said the ban leaves out dumping elsewhere in the World Heritage Area, "where plumes can easily drift onto coral and seagrass," and spoil from maintenance dredging is not covered.

    legislation.gov.auwwf.org.au

    Credit

    Australian Government; Great Barrier Reef Marine Park Authority

Watch for

  1. Port Everglades plan reconsidered

    USACE plans to deepen the channel at Port Everglades, Florida, by 10 ft, at a cost of at least $1.35 billion over six years. In October 2025, scientists from Chicago's Shedd Aquarium and NMFS reported more than 10 million corals within 1.2 km of the channel, including what may be the largest remaining wild stand of staghorn coral. In April 2026 USACE withdrew its state water-quality permit application, saying that parts of the project, including the order of construction, "are being reconsidered"; it says the project remains authorized.

    Achieved whenUSACE publishes a revised plan with a forecast of the reef area affected, and surveys after the work by NMFS or another outside party find harm within that forecast.

    wlrn.orgwusf.org

    Claimed by

    USACE, April 2026; Ross Cunning (Shedd Aquarium) with NMFS scientists, October 2025

  2. Satellites outline dredge plumes

    VITO, a Belgian research institute, is building prototype methods, under a project funded by the European Space Agency (ESA), that use Sentinel-2 satellite images and AI to outline dredge plumes, tell them apart from natural cloudiness in the water, and assess the impact of dredging. In a preprint of February 2026, its team and French colleagues reported that dredge plumes reflect more short-wavelength light than natural muddy water, a signature that makes plumes possible to map from Sentinel-2 images.

    Achieved whenon a working project, satellite plume outlines match in-water turbidity stations within a stated error, checked by a party outside VITO, and a permitting authority accepts them as evidence.

    eo4society.esa.intapi.crossref.org

    Claimed by

    VITO, with ESA funding, February 2026

Open

  1. 01

    Hindcast Miami, forecast Everglades

    An open computer model of how sediment from the 2013 to 2015 PortMiami dredging drifted and settled, checked against the NMFS map of damaged reef and against satellite maps of the plumes, then run for the planned Port Everglades deepening under different working methods, with and without hopper overflow and rock grinding.

    The brief
    Credit · unclaimed
  2. 02

    Score past plume forecasts

    A public scorecard of finished channel-deepening projects near reefs or seagrass. For each, it lists the area of harm forecast in the environmental impact statement, the plume footprint seen in satellite images during the work, and the harm measured in surveys afterwards.

    The brief
    Credit · unclaimed

Open 01 · the brief

Hindcast Miami, forecast Everglades

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open computer model of how sediment from the 2013 to 2015 PortMiami dredging drifted and settled, checked against the NMFS map of damaged reef and against satellite maps of the plumes, then run for the planned Port Everglades deepening under different working methods, with and without hopper overflow and rock grinding.

Why it is still open

The PortMiami forecast was 3.3 acres and NMFS measured about 278. The plumes have been mapped after the fact: Brian Barnes and colleagues at the University of South Florida traced them in Landsat and MODIS images (2015), and Ross Cunning and colleagues found in 2019 that plumes seen by satellite tracked the coral burial and deaths found on the seafloor. Neither ran a model that forecasts plumes from the dredging plan. More than 10 million corals lie within 1.2 km of the Port Everglades channel, and USACE withdrew its state permit application in April 2026 to reconsider the plan. No public forecast model checked against PortMiami was found.

miamiwaterkeeper.orgdigitalcommons.usf.eduusf.eduwlrn.org

Built with what exists

Delft3D Flexible Mesh, open-source flow and sediment software from Deltares, or openTELEMAC; NOAA depth surveys; Landsat 8 images from 2013 to 2015 and Sentinel-2 images from mid-2015, with the Barnes plume maps as a check; NASA DEVELOP's 2021 satellite water-quality baseline for southern Florida seaports; Google Earth Engine; an AI coding agent to set up and rerun the model runs.

ntrs.nasa.gov

  1. First step

    Digitize the NMFS survey sites and damaged area from its 2023 report, and gather every cloud-free Landsat 8 scene of the PortMiami channel from November 2013 to September 2015.

  2. Done looks like

    A hindcast that places at least 70% of the reef NMFS found damaged inside its modeled sediment footprint while leaving the reference sites clean; public code and inputs; forecasts of affected reef area at Port Everglades for three working methods.

Open 02 · the brief

Score past plume forecasts

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public scorecard of finished channel-deepening projects near reefs or seagrass. For each, it lists the area of harm forecast in the environmental impact statement, the plume footprint seen in satellite images during the work, and the harm measured in surveys afterwards.

Why it is still open

NMFS wrote that the PortMiami gap "illustrates the need to carefully evaluate existing practices" for forecasting and detecting harm. In Australia, CSIRO's guideline on dredge plume modeling for environmental impact assessment, drawn from the Western Australian Marine Science Institution's dredging research, calls for a public database of assessment data to improve future modeling, so none exists yet. The ESA-funded PLUMES project is building tools to outline plumes in Sentinel-2 images, not to score forecasts, and no scorecard across projects was found.

miamiwaterkeeper.orgcsiro.aueo4society.esa.int

Built with what exists

Environmental impact statements and post-dredging survey reports; Landsat and Sentinel-2 images in Google Earth Engine or the Copernicus Data Space Ecosystem; a turbidity index computed from the images; QGIS; a web agent to gather the documents for a person to check (see the Note "Deleting 80% to start over").

  1. First step

    List the projects near reefs or seagrass that published both a forecast of harm and an after-the-work survey, starting with the large Western Australian projects behind the CSIRO guideline, and fill in the first row.

  2. Done looks like

    At least 8 projects on two or more continents, each with forecast area, satellite plume area on at least 10 dates, and measured harm, with the ratios and sources in a public CSV.