BRENNEN

Industries / Mining and materials / Cement and concrete

Quarrying and raw mix

Quarrying and raw mix is the work of digging limestone, clay, shale or marl near a cement plant and proportioning, grinding and blending them into raw meal, a fine powder with the right chemistry to burn into clinker.

6

Milestones achieved, from 1817 to 2021.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1817

    Clay makes lime set underwater

    Louis Vicat, a French government engineer sent to build a bridge over the Dordogne at Souillac, published his work on what makes a lime "hydraulic", able to set under water, in the journal Annales de chimie in 1817. By the account of the Vicat cement group, the finding rested on burning the right proportion of limestone and clay, and the Académie des sciences recognized it the following year. Vicat took out no patent and advised builders freely.

    vicat.com

    Credit

    Louis Vicat

  2. 1824

    Road dust and clay

    Joseph Aspdin, a bricklayer of Leeds, patented "an improvement in the modes of producing an artificial stone", which he called Portland cement. His recipe took limestone swept up from roads after traffic had ground it to powder, or quarried limestone, and burned it. He then mixed it with clay and water until the mixture was extremely fine, dried it, broke it into lumps and burned it again "till the carbonic acid is entirely expelled". The patent gives no proportions, only "a specific quantity" of each material.

    cementkilns.co.uk

    Credit

    Joseph Aspdin (British patent 5022, granted 21 October 1824)

  3. 1929

    Minerals from four oxides

    Clinker is mostly four minerals: alite and belite, two calcium silicates that give cement most of its strength, plus aluminate and ferrite. In 1929 R. H. Bogue published equations that estimate how much of each mineral a clinker holds from a chemical analysis of four oxides: lime, silica, alumina and iron oxide. Plants still steer raw mixes by such targets: Thermo Fisher Scientific's analyzer software controls the four minerals as well as three ratios, the lime saturation factor (how close the lime is to the most the other oxides can combine with), the silica modulus and the alumina modulus.

    LessonIn 2014 Paul Stutzman and colleagues at the US National Institute of Standards and Technology (NIST) put the uncertainty of Bogue estimates at about 9.6 % for alite and belite (one standard deviation) and wrote that the size of the method's built-in biases is not known.

    doi.orgnist.govthermofisher.cn

    Credit

    R. H. Bogue

  4. 1971

    Four rollers on a table

    A vertical roller mill grinds raw materials between heavy rollers and a turning table, and dries them at the same time with hot exhaust gas from the kiln's preheater. Loesche patented its first mill of this type in 1927, and in 1971 its first four-roller mill went into operation at a plant near Naples, Italy, grinding 214 t of raw meal an hour, by the company's account. A 2022 study of China's cement industry lists vertical roller mills among the grinding methods that use 50–70% less electricity than the ball mills (rotating drums filled with steel balls) still in wide use.

    loesche.comnature.com

    Credit

    Loesche

  5. 2005

    Mercury in the limestone

    The US Toxics Release Inventory listed 631 pounds of mercury from Ash Grove Cement's plant at Durkee, Oregon, for 2005. Patty Jacobs, a permit writer at the Oregon Department of Environmental Quality, checked that figure against the plant's air permit and estimated nearer 1,400 pounds, and the company's own tests then found about 2,500 pounds a year, by High Country News' account. The mercury came mainly from the plant's own limestone, which in eastern Oregon carries mercury from the region's volcanic past. Ash Grove spent about $20 million on a system that captures mercury on powdered carbon, and the US Environmental Protection Agency's proposed national rules would require a cut of about 98% by 2013.

    LessonTrace elements in a quarry's rock leave through the stack, so raw materials have to be analyzed for more than the main oxides.

    hcn.org

    Credit

    Patty Jacobs, Oregon Department of Environmental Quality

  6. 2021

    A quarry permit refused

    In July 2021 Sweden's highest land and environment court refused to renew the permit for Cementa's limestone quarry at Slite on Gotland, citing concerns over the study of its effect on groundwater. The Slite plant makes about three quarters of the cement used in Sweden. The government granted a stopgap permit to the end of 2022, a court then allowed four more years, and on 7 May 2025 the Land and Environment Court granted Heidelberg Materials, Cementa's owner, a 30-year permit. The permit became final in September 2026, when Sweden's Supreme Court declined to hear an appeal, by the account of the trade body Svensk Betong.

    LessonA cement plant depends on one quarry, so the evidence on water and nature has to be ready before the permit runs out.

    dezeen.comaggbusiness.comnaturvardsverket.sevia.tt.se

    Credit

    Cementa (now Heidelberg Materials Cement Sweden) and the Swedish courts

Watch for

  1. Old concrete as raw meal

    Heidelberg Materials says the finest fraction of crushed demolition concrete, which it calls recycled concrete paste, can replace limestone as a raw material for clinker. It repeated the claim in July 2026 while describing a pilot at its Górażdże cement plant in Poland. The paste comes from a recycling plant near Katowice, opened in 2024, that separates up to 100 t of concrete an hour. The company has not published what share of any plant's raw meal is made this way.

    Achieved whena cement plant reports the share of its raw meal that came from recycled concrete paste over at least a year, with clinker chemistry, and an outside party checks the figures.

    heidelbergmaterials.usheidelbergmaterials.com

    Claimed by

    Heidelberg Materials, July 2026

Open

  1. 01

    A better mineral estimate

    A public table that pairs the oxide analysis of clinkers from many plants with their measured mineral content, gathered from published papers and from plants willing to share, and a test of whether a model trained on some plants predicts the minerals at plants it has never seen better than the Bogue equations. The measured content comes from X-ray diffraction with Rietveld analysis, a method that fits the whole diffraction pattern to count each mineral, or from counting crystals under a microscope.

    The brief
    Credit · unclaimed
  2. 02

    Match plants to quarries

    For the integrated cement plants (plants that make their own clinker) in three countries, a checked link from each plant to the limestone quarry that feeds it, confirmed from company reports and quarry permits, with the quarry's outline for each year from 2017 drawn from Sentinel-2 satellite images. Then score how often the plant-to-supplier links proposed in the largest open cement database are right, and flag each quarry that lies near a drinking-water source or a protected nature area.

    The brief
    Credit · unclaimed

Open 01 · the brief

A better mineral estimate

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table that pairs the oxide analysis of clinkers from many plants with their measured mineral content, gathered from published papers and from plants willing to share, and a test of whether a model trained on some plants predicts the minerals at plants it has never seen better than the Bogue equations. The measured content comes from X-ray diffraction with Rietveld analysis, a method that fits the whole diffraction pattern to count each mineral, or from counting crystals under a microscope.

Why it is still open

NIST's 2014 study puts the uncertainty of Bogue estimates at about 9.6 % for alite and belite and says their biases are not known. In 2025 S. J. Fayaz, N. M. A. Krishnan and four co-authors (Communications Engineering) trained machine-learning models on 8,654 clinker samples from two years at one plant and cut the error for alite from 7.79% with the plant's own Bogue equations to 1.24% (mean absolute percentage error). Their data came from an unnamed plant under a confidentiality agreement and are not public, and they call their fitted equations plant-specific. A Crossref search for this brief found other comparisons only for a few clinkers, such as a 2006 paper titled "Where is the iron?", and no public table across plants.

nist.govarxiv.orgdoi.org

Built with what exists

Python with pandas and scikit-learn; the code Fayaz and colleagues released with their paper; free Rietveld software such as Profex or GSAS-II to check any raw diffraction data that authors share; a language model to pull tables out of PDF papers, with a person checking every value (see the Note "Seven more flagged").

  1. First step

    List every paper and NIST publication that reports both an oxide analysis and Rietveld results for the same clinker, starting from the references of the 2006, 2014 and 2025 papers.

  2. Done looks like

    At least 150 clinkers from at least 10 plants or independent sources, each with its oxides and measured minerals, and the model's mean error for alite, in mass percent, on plants held out of training, reported next to Bogue's error on the same clinkers.

Open 02 · the brief

Match plants to quarries

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

For the integrated cement plants (plants that make their own clinker) in three countries, a checked link from each plant to the limestone quarry that feeds it, confirmed from company reports and quarry permits, with the quarry's outline for each year from 2017 drawn from Sentinel-2 satellite images. Then score how often the plant-to-supplier links proposed in the largest open cement database are right, and flag each quarry that lies near a drinking-water source or a protected nature area.

Why it is still open

Nataliya Tkachenko and colleagues at Oxford's Spatial Finance Initiative (2023) list 3,117 cement plants, located to within 10 km, and propose links to their likely suppliers from a published map of mine outlines. Their technical check compares plants with reported capacity figures and does not report testing the supplier links. Global Energy Monitor's Global Cement and Concrete Tracker gives each plant's location, capacity and kilns, but not its quarry. A hand-drawn map of 74,548 mine outlines by Liang Tang and Tim Werner (2023) notes that small aggregate quarries are probably underrepresented. The Slite case showed that one quarry permit can decide a country's cement supply.

pmc.ncbi.nlm.nih.govglobalenergymonitor.orgnature.com

Built with what exists

The Tkachenko database (on Dryad) and the tracker's plant list; Tang and Werner's polygons; Sentinel-2 images through Google Earth Engine or Microsoft Planetary Computer; an image segmentation model such as Meta's Segment Anything; QGIS.

  1. First step

    Download the Tkachenko database and the tracker, pick the integrated plants in one country, and confirm the quarry for 20 of them from company and permit records.

  2. Done looks like

    At least 80% of the integrated plants in three countries linked to a quarry with a source for each link, yearly outlines from 2017 to 2026 checked against 100 drawn by hand with the overlap score published, and the share of the database's proposed links that match.