Grid storage systems are the large batteries, from a single shipping container to buildings full of battery racks, that utilities and companies connect to the grid, together with the inverters, cooling and controls that let them charge and discharge on command.

7

Milestones achieved, from 1986 to 2019.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1986

    A battery steadies Berlin

    Before the fall of the Wall, West Berlin ran an island grid that had to balance itself. In 1986 the city utility BEWAG put into operation a lead-acid battery at Steglitz with a peak power of 17 MW, which at rated power could be emptied in 20 minutes, to support that grid. BEWAG engineers argued in IEEE Transactions on Energy Conversion in 1986 that batteries suited frequency control (frequency drops when demand outruns supply) and instant reserve, even though storing cheap power for later use did not pay in Europe. The battery was shut down in 1994 as uneconomical.

    bayern-innovativ.deapi.crossref.org

    Credit

    BEWAG; Künisch, Krämer and Dominik

  2. 1986

    Vanadium in both tanks

    A flow battery keeps its energy in liquids pumped from tanks through a cell stack, so more tanks add hours without adding power. Maria Skyllas-Kazacos's team at the University of New South Wales (UNSW) ran the first cells with vanadium in both liquids in 1984 and filed the first all-vanadium patent in 1986. Using one element on both sides avoids the cross-contamination, the two liquids slowly mixing across the cell, that troubled NASA's earlier iron-chromium flow battery. By 1997 Kashima-Kita Electric Power had installed a 200 kW, 800 kWh vanadium battery for a load-leveling field trial at its power station in Japan. By the inventors' account, China connected more than 440 MW and 1.74 GWh of vanadium flow batteries in 2024 alone, including a 1,000 MWh system in Xinjiang.

    royalsoc.org.au

    Credit

    Maria Skyllas-Kazacos, M. Rychcik and R. Robins, UNSW

  3. 2003

    Alaska's battery bridges outages

    Golden Valley Electric Association, a cooperative serving about 90,000 people around Fairbanks, Alaska, commissioned a nickel-cadmium battery built with ABB's converter and Saft's cells in 2003. ABB says it can carry 26 MW of load for 15 minutes, or 40 MW for 7 minutes, while backup generators start, and that it set a Guinness World Record by discharging 46 MW for five minutes in a test. Bloomberg News reported in 2019 that it had prevented 59 blackouts in 2018, that half its cells had been replaced, and that its control system needed upgrading because its chips were no longer made.

    LessonThe cells are not the only part that wears out; electronics that are no longer made can retire a working battery.

    library.e.abb.comheraldnet.com

    Credit

    Golden Valley Electric Association; ABB; Saft

  4. 2009

    Lithium-ion holds grid reserve

    In November 2009 AES Energy Storage commissioned a 12 MW lithium-ion battery from A123 Systems at AES Gener's Los Andes substation in Chile's Atacama Desert, to provide reserve power for the northern Chile grid, a job usually done by power plants held below full output. In 2011 the grid operator, CDEC-SING, rated it one of the best-performing reserve units in northern Chile, as AES reported.

    nsenergybusiness.comblog.fluenceenergy.com

    Credit

    AES Energy Storage; A123 Systems; AES Gener

  5. 2011

    A sodium-sulfur battery burns

    Sodium-sulfur batteries run hot, with molten material inside, and in 2011 they made up about 400 MW of the world's grid batteries, against 45 MW of lithium-ion, by EDF figures cited by INERIS, France's industrial safety institute. On 21 September 2011 a 2 MW sodium-sulfur battery made by NGK Insulators caught fire at a Mitsubishi Materials plant in Joso, Japan; it burned for days and was declared out on 5 October. NGK traced the fire to one failed cell in one of 40 modules, whose hot leak shorted its neighbors and spread the fire to the modules above and below. NGK halted production, asked customers to stop their batteries, and added fuses, insulation boards and fire barriers between modules.

    LessonOne failed cell can take down a whole battery unless the design stops heat and fire moving between cells and modules.

    aidic.it

    Credit

    NGK Insulators (investigation); INERIS (review)

  6. 2019

    A battery container explodes

    On 19 April 2019 a 2 MW, 2 MWh lithium-ion battery in a container at Arizona Public Service's McMicken site in Surprise, Arizona, began to fail. One cell went into thermal runaway, a self-heating failure that releases flammable gas, because of an internal defect, and the failure spread cell to cell through a whole rack. The clean-agent gas system put out flames as designed but could not stop the runaway, and gas built up inside. About three hours later firefighters opened the door and the gas exploded; UL's Firefighter Safety Research Institute reported that four firefighters were seriously injured. DNV GL's report for APS named five causes, including no thermal barriers between cells, no way to vent the gas, and an emergency plan with no procedure for entry. LG Chem, which made the cells, and its expert Exponent presented a different cause, which APS's experts disputed.

    LessonPutting out flames is not enough; a battery room must stop failures spreading and vent flammable gas before anyone opens the door.

    aps.comaps.comdoi.org

    Credit

    DNV GL (report for APS); UL Firefighter Safety Research Institute

  7. 2019

    A battery runs an island

    Most battery inverters follow the grid's voltage; a grid-forming inverter sets its own voltage and frequency, as a power station's spinning generator does. The 30 MW, 8 MWh ESCRI-SA battery at Dalrymple, South Australia, owned by the transmission company ElectraNet and operated by AGL, was completed in January 2019 with grid-forming inverters. On 20 December 2019 lightning tripped the line to the area, and the battery kept the local network running on its own, with the nearby Wattle Point wind farm, until the line was reconnected three minutes later. Its fast response is counted in the market operator AEMO's limits on power flows into South Australia as the equivalent of 200 MWs of inertia, the stored spinning energy that slows a fall in frequency, and AEMO's Barry O'Connell called it the largest grid-forming battery in the world. By December 2025, ten grid-forming batteries of about 1,070 MW in total were running in Australia's main grid, pv magazine Australia reported.

    arena.gov.auarena.gov.aupv-magazine-australia.com

    Credit

    ElectraNet; AGL; ARENA (funding); AEMO

Watch for

  1. Sodium-ion containers for the grid

    CATL says its TENER Sodium system, launched in Munich, is the world's first sodium-ion grid storage system validated in real use. CATL says 34 of its units, each weighing about 42 tonnes, make up a 1 GWh site, and that the system cuts the power the system uses for its own cooling and controls from an industry average of 2% to 1%, and runs at 65 decibels; deliveries in China were to start in September 2026, reaching 1 GWh by the end of 2026, with deliveries abroad from June 2027.

    Achieved whenan operator or an independent engineer publishes a year of measured output, efficiency and own-use power from a delivered system.

    cleantechnica.com

    Claimed by

    CATL, June 2026

  2. Batteries replace spinning machines

    System strength is the grid's ability to hold its voltage steady through a fault, which has come from coal and gas generators and from synchronous condensers, spinning machines that burn no fuel. ARENA and Tesla say grid-forming batteries can supply it at lower cost. AEMO wrote in November 2025 that the ability of inverters to supply protection-quality fault current, the surge of current during a short circuit that protection relays need in order to find and clear it, "has not yet been demonstrated and tested with in-field testing", and that it is contracting some sites for tests.

    Achieved whenAEMO or a transmission company publishes field tests showing grid-forming batteries supplying fault current that protection relays act on correctly.

    reneweconomy.com.au

    Claimed by

    ARENA and Tesla, November 2025

Open

  1. 01

    Noise at battery sites

    A public set of sound measurements taken from public roads and footpaths beside at least 20 operating grid battery sites, by day and by night and in hot and mild weather, each compared with the level the site's permit noise study predicted at the same distance.

    The brief
    Credit · unclaimed
  2. 02

    How long grid batteries last

    An open table of every US grid battery that has been retired, with its years in service, power and energy, chemistry, the reason it was retired and what happened to its cells (recycled, reused or stored), each fact linked to a public record, and the median service life with its spread.

    The brief
    Credit · unclaimed

Open 01 · the brief

Noise at battery sites

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public set of sound measurements taken from public roads and footpaths beside at least 20 operating grid battery sites, by day and by night and in hot and mild weather, each compared with the level the site's permit noise study predicted at the same distance.

Why it is still open

A consultant's report for Fairfax County, Virginia (April 2025), found that battery containers with their cooling fans and condensing units can exceed 90 dBA at the source, and that fans run more and longer in hot weather. Its recommended rules rely on measurements of background noise and computer models made before construction; measurements after construction appear only as an option. Makers' figures, such as CATL's 65 decibels, are their own. Published measurements cover one site at a time: Bowers, Hankard, Cerio and Thomas measured one battery facility over two days, from 3 to 360 feet, and compared the levels with the maker's data and a standard outdoor-sound model (ISO 9613-2) at the Noise-Con 2025 conference, and a 2026 Noise-Con paper by Storm deals with telling battery noise apart from summer birds and insects. A search found no public set of measured levels across many operating sites.

fairfaxcounty.govapi.crossref.orgapi.crossref.org

Built with what exists

A logging Class 1 sound level meter, such as the NTi Audio XL2, checked with a calibrator before each session; OpenStreetMap's Overpass API to find battery sites (tagged plant:source=battery); permit noise studies from county planning portals, read with a document model such as Muse Ember (see the Note "The jobs agents repeat"); NOAA weather records for temperature; Python to compute equivalent levels (Leq), background levels (L90) and one-third-octave spectra, which show the fan tones. Stay on public land throughout.

  1. First step

    Find five operating battery sites within driving distance on OpenStreetMap, download each one's permit noise study, and take a 15-minute night measurement from the nearest public road at each.

  2. Done looks like

    At least 20 sites, each measured on at least three nights, one of them above 30 °C; levels and spectra published with distances, times and weather, next to each permit's prediction; a second person repeats five sites and agrees within 2 dB; data and short audio clips released under an open license.

Open 02 · the brief

How long grid batteries last

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table of every US grid battery that has been retired, with its years in service, power and energy, chemistry, the reason it was retired and what happened to its cells (recycled, reused or stored), each fact linked to a public record, and the median service life with its spread.

Why it is still open

The US Energy Information Administration's monthly generator inventory lists retired units since 2002. A count made for this entry from its September 2026 file found 50 retired battery units, retired between 2013 and 2026, with no reason or cell fate given. The few known cases end differently: Berlin's 1986 battery was shut as uneconomical, Golden Valley replaced half its cells, and Redwood Materials recycled the Kauai Island Utility Cooperative's 4.6 MWh Anahola battery in 2023. Argonne National Laboratory's EverBESS project, which estimates end-of-life costs for grid batteries, describes current practice in July 2026 as "not many examples; one-off projects". A Crossref search found no study pooling grid battery retirements.

eia.govredwoodmaterials.comdoepeerreview.sandia.gov

Built with what exists

EIA-860M's Retired tab and the annual EIA-860 energy storage schedule, which gives chemistry; state utility commission dockets and utility filings; a document model such as Muse Ember (see the Note "The jobs agents repeat"); Python with pandas; Argonne's free EverBESS web tool to put a cost on each retirement.

  1. First step

    Download the latest EIA-860M file, filter its Retired tab to "Batteries", compute years in service, and look up why the five largest units were retired.

  2. Done looks like

    All retired US battery units in the latest EIA file, with service years and size for every one, chemistry for at least 80%, a documented reason for at least 30 units and cell fate for at least 15, each linked to its record; the median service life published with its range.