Industries / Construction and property / Heavy civil / Asphalt production
Stone and binder
Asphalt mix is mostly crushed stone, sand and fine dust, together called aggregate, glued by a small share of bitumen, the heavy black residue of crude oil that Americans call asphalt binder; this work chooses, grades and blends both.
5
Milestones achieved, from 1903 to 2003.
3
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1903
Graded stone, fewer voids
Before this, paving mixes used fine sand or gravel, and the best of them still held about 21% voids, the empty space between grains. Frederick J. Warren of Newton, Massachusetts, patented a mix of stone graded from fine powder up to about 3 in (76 mm), with 50 to 80% of it coarser than 1/4 in (6 mm), so that smaller grains filled the gaps between larger ones. His patent says this left under 20% voids and needed less binder, because large stones have less surface to coat.
Credit
Frederick J. Warren (US patent 727,505, filed 1901, granted 5 May 1903)
1991
A stone skeleton crosses over
Stone matrix asphalt (SMA) is about 70% coarse stone, so that the strength comes from stone pressing on stone, with the gaps filled by a rich mortar of binder and fine dust and a fiber or polymer to stop the binder draining off. It was developed in Europe to resist wear from studded tyres. When Germany banned studded tyres in the 1970s its use fell, and it returned in the 1980s, when heavier wheel loads and tyre pressures made rutting, the grooves pressed into wheel paths, the bigger problem. A US group of contractors, agencies and the National Asphalt Pavement Association (NAPA) saw it in Europe in the fall of 1990, and Georgia, Indiana, Michigan, Missouri and Wisconsin built major SMA projects in 1991; Wisconsin's went down on I-94 on 10 July 1991.
LessonA mix that was dropped when its first purpose vanished came back to solve a different problem.
Credit
European road builders, chiefly in Germany; in the US, FHWA, NAPA, the Asphalt Institute and the five states, as recorded by E. R. Brown of the National Center for Asphalt Technology (NCAT)
1993
Binder graded by climate
The Strategic Highway Research Program (SHRP), a US research program funded by Congress on 2 April 1987, ran its asphalt research from 1987 to 1993; its work on binder properties alone was budgeted at $22 million. It produced the performance-graded (PG) specification, which gives a binder temperature grades for three seasonal conditions, each tied to a different kind of damage. The specification is now AASHTO M 320.
Credit
SHRP and its contractors, under the US National Academy of Sciences
1995
A rubber quota is repealed
Section 1038 of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) required US states to put crumb rubber, ground from scrap tyres, into asphalt paved with federal money. A coalition statement that Representative Sam Coppersmith of Arizona read into the Congressional Record in March 1994 put the share at 5% of each state's federally funded asphalt projects from January 1994, rising to 20% in 1997, and said the 1994 appropriations bill had already barred FHWA from enforcing it. The National Highway System Designation Act of 1995 struck the mandate and its penalties, and the same act told the Secretary of Transportation to develop performance grades for rubber-modified binders. Use is now voluntary.
LessonA quota was set before there was an agreed way to grade the material, and Congress asked for the grading only when it dropped the quota.
Credit
US Congress; FHWA
2003
A gradation rule fails tests
SHRP left aggregate out of its experiments, but its expert group still drew a "restricted zone", a band of particle-size blends that Superpave mixes had to avoid, to keep out sandy mixes that rut. Tests at NCAT found that mixes passing through the zone performed as well as or better than mixes that avoided it in three laboratory rutting tests, agreeing with the national research project NCHRP 9-14. AASHTO later replaced the zone with a check on one control sieve.
LessonA rule set without test data can shape mix design for years before anyone tests it.
Credit
Jingna Zhang, L. Allen Cooley Jr. and Graham Hurley (NCAT); NCHRP project 9-14
Watch for
Lignin in a Latvian highway
Lignin is the natural glue in wood, left over in large amounts by paper mills. A team from Riga Technical University, the road builder Vianova and the Latvian State Institute of Wood Chemistry says a test section on the Riga to Sigulda highway replaced about 48% of the new bitumen, 20% with lignin and 28% with old binder recovered from reclaimed asphalt. It reports no defects after about a year and a half, and a life cycle assessment that puts the cut in global warming potential at 24 to 55%. The testing was the team's own.
Achieved whenthe road authority or a laboratory outside the team publishes condition data for the section after several winters.
Claimed by
Riga Technical University, February 2026
A bio-binder in Spain
A test section on Spain's N-623 road, built in the EU-funded LIAISON project, uses a binder with 40% bio-based content that, its developers say, fully replaces conventional bitumen and matched it in laboratory tests for water damage, rutting, stiffness and fatigue. Irune Indacoechea of the Universidad de Cantabria estimates a saving of about 1,200 kg of CO2-equivalent per tonne of binder; no published study is cited for the figure. In the same report Martin Junginger of Utrecht University says lignin can replace bitumen "up to roughly 50%, not 100%".
Achieved whenfield data from the section, measured by someone outside the project, are published.
Claimed by
Universidad de Cantabria researchers, March 2026
Screening modified binders by model
Modified binders have polymers or softening oils added to change how they behave. The Illinois Center for Transportation (ICT), with the Illinois Department of Transportation (IDOT), says it built a model that estimates how prone a modified binder is to cracking from its measured properties and recycled content, and a framework that sorts binders into good, borderline and needing more testing. The announcement gives no accuracy figures and does not say IDOT has adopted it.
Achieved whenIDOT writes the model into a specification, or a laboratory outside ICT checks its predictions on binders the model has not seen.
Claimed by
Imad Al-Qadi, ICT, October 2025
Open
01
Stone shape from a phone
An open phone app that measures the shape of coarse aggregate from photographs of a whole test sample: the share of flat and elongated particles (pieces much thinner or longer than they are wide), which many specifications limit, and the share with crushed faces.
The briefCredit · unclaimed02
Bio-binder roads in one table
A public register of every road section built with a bio-based binder, such as lignin replacing part of the bitumen, giving location, build date, share of binder replaced, material, who measures the section, and its latest condition report, updated every three months.
The briefCredit · unclaimed
Open 01 · the brief
Stone shape from a phone
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open phone app that measures the shape of coarse aggregate from photographs of a whole test sample: the share of flat and elongated particles (pieces much thinner or longer than they are wide), which many specifications limit, and the share with crushed faces.
Why it is still open
The standard test, ASTM D4791, compares each particle's longest and shortest dimension. When M. S. Hossain, F. Parker and Prithvi Kandhal compared shape tests in 2000, they called the crushed-face and flat-and-elongated tests "somewhat subjective". Phone photos have been shown to work in research: in 2019 Khalid Ghuzlan, M. T. Obaidat and Mai Alawneh photographed 50 particles from above and from the side on a purpose-built grid, measured them with the ImageJ program and compared the results with caliper measurements. That was 50 particles on one rig, not whole samples from many quarries, and a GitHub search for this file found no public phone tool for aggregate shape. Image analysis of aggregate also works on laboratory rigs, for example Tongan Pan and Erol Tutumluer's 2007 surface texture index.
store.astm.orgapi.crossref.orgapi.semanticscholar.orgapi.crossref.org
Built with what exists
A phone camera; a printed board with ArUco markers for scale, read with OpenCV; Meta's open Segment Anything model to outline each particle; the phone's depth sensor, or a second photo from the side, for thickness; Python.
First step
Collect stone from three local suppliers, have two people count flat and elongated particles in each sample by hand, and photograph the same particles.
Done looks like
On 40 coarse aggregate samples from at least 10 quarries, the app's flat-and-elongated percentage is within 3 percentage points of the average of two technicians' hand counts on at least 36 samples, with every photo, count and line of code published.
Open 02 · the brief
Bio-binder roads in one table
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public register of every road section built with a bio-based binder, such as lignin replacing part of the bitumen, giving location, build date, share of binder replaced, material, who measures the section, and its latest condition report, updated every three months.
Why it is still open
Each trial reports on its own and in its own terms: Latvia's as 48% of new binder replaced, Spain's as 40% bio-based content, and neither report names an outside tester. Reviews exist, such as Ashish Bhardwaj's 2025 chapter on lignin-modified asphalt in the Handbook of Lignin, but this research found no maintained register of field sections with follow-up data.
Built with what exists
Searches of papers, theses and road agency reports; an AI document reader such as Claude to pull section details out of PDFs in several languages; a spreadsheet or Git repository with a Leaflet map.
First step
Enter the Latvian and Spanish sections and write to both teams for their monitoring plans.
Done looks like
At least 25 sections in at least 6 countries, each with a source link, at least 5 of them with condition data from more than two years after construction, and four quarterly updates published.