BRENNEN

Industries / Energy, water and waste / Environmental services / Asbestos and lead abatement

Removal

Removal is the work of taking asbestos or lead paint out of a building, or sealing or replacing it, by methods that keep the dust down.

7

Milestones achieved, from 1973 to 2014.

2

To watch for: announced, not yet confirmed outside.

3

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1973

    Remove asbestos before demolition

    On 6 April 1973 EPA issued national emission standards for the three pollutants on its initial list of hazardous air pollutants: asbestos, beryllium and mercury. Anyone demolishing an institutional, commercial or industrial building, or an apartment building with more than four units, where boilers, pipes or load-bearing members were insulated or fireproofed with friable (crumbly) asbestos, had to notify EPA at least 20 days ahead, wet that asbestos and remove it before wrecking the load-bearing members, and lower it to the ground rather than drop it, using dust-tight chutes or containers from buildings 50 feet or taller. Spray-on insulation and fireproofing for buildings had to contain less than 1% asbestos. EPA had proposed banning all visible emissions from demolition, but comments said demolition without them was impracticable, if not impossible, so it wrote required work steps instead.

    LessonWhen there is no practical way to measure a pollutant at its source, a rule can require the steps that keep it in.

    govinfo.gov

    Credit

    EPA

  2. 1984

    Licenses for removal firms

    The UK's Asbestos (Licensing) Regulations 1983 came into force on 1 August 1984. From then, no employer or self-employed person in Great Britain could remove, repair or disturb asbestos insulation or coatings without a license from the Health and Safety Executive, which could attach conditions and revoke it. Short jobs were exempt: no worker more than one hour in seven days and no more than two hours in total. The Control of Asbestos Regulations 2012, in force on 6 April 2012, added a middle tier, "notifiable non-licensed work", which must be reported to the regulator and needs medical checks and records.

    legislation.gov.uklegislation.gov.ukhse.gov.uk

    Credit

    UK Secretary of State, on proposals from the Health and Safety Commission; HSE

  3. 1990

    Manage asbestos in place

    EPA's July 1990 guide "Managing Asbestos in Place", known as the Green Book, told building owners that "removal is often not a building owner's best course of action to reduce asbestos exposure" and that "an improper removal can create a dangerous situation where none previously existed", because removals tend to raise the fiber count in the air. EPA said it required removal only before demolition or renovation, and recommended a program of inspection, repair and careful maintenance whenever asbestos is found. It wrote the guide in part to discourage owners from removing all asbestos regardless of its condition.

    LessonTaking a hazard out can release more of it than leaving it in place under watch.

    dshs.texas.gov

    Credit

    EPA

  4. 1990

    Deleading raised children's lead

    Amitai and colleagues reported in 1987 on four lead-poisoned children whose blood lead rose to 90 to 130 micrograms per deciliter after their homes were "deleaded" by scraping, sanding and burning the paint. Farfel and Chisolm found in 1990 that the usual abatement raised lead in house dust 3 to 6 times, and 10 to 100 times where the work was done, and raised blood lead in nearly half the children living there; after six months neither the usual nor the modified methods had lowered children's blood lead. In 1999 the US Department of Housing and Urban Development (HUD) banned, in federally assisted housing and in federally owned housing being sold, open-flame burning, machine sanding, grinding or blasting without a HEPA exhaust, heat guns above 1,100 °F and most dry sanding and scraping.

    LessonThe usual way of removing lead paint poisoned the children it was meant to protect.

    ebi.ac.ukebi.ac.ukfederalregister.gov

    Credit

    Y. Amitai and colleagues (1987); M. R. Farfel and J. J. Chisolm (American Journal of Public Health, 1990); HUD

  5. 2000

    Pipe robot fails at Pentagon

    Carnegie Mellon University built BOA, a robot paid for by the US Department of Energy that crawls along a pipe, cuts away the insulation under its own vacuum and bags it. On stand-in calcium silicate insulation at Oak Ridge in the summer of 1997 it stripped about 25 feet of pipe an hour. In its first trial on real asbestos insulation, at the Pentagon's renovation, the pipes turned out to be wrapped in heavy canvas that its cutters could not cut. It kept jamming, water and sealant leaked into its motors and electronics, and it was taken off the pipe unrepaired.

    LessonA robot tested on stand-in material can fail on the first real job when the real wrapping differs from the samples.

    osti.gov

    Credit

    H. Schempf and team, Carnegie Mellon University; US Department of Energy (final report, September 2000)

  6. 2013

    Robots blast a bridge

    Two 25 kg grit-blasting robots, built by the University of Technology Sydney (UTS) with the state road agency, Roads and Maritime Services, began stripping old paint from the Sydney Harbour Bridge in 2013, so its southern spans could be repainted. The national news agency AAP reported the robots at work in July 2013 and noted that workers had faced lead and asbestos in the old paint. By UTS's count the robots blasted about 3,500 square meters in 150 days, one worker supervises up to two robots, and workers no longer stand in the blast area except to hand-blast spots the robots cannot reach.

    sbs.com.audataportal.arc.gov.au

    Credit

    D. K. Liu and colleagues, UTS; NSW Roads and Maritime Services; SABRE Autonomous Solutions, the UTS spin-out formed in 2013

  7. 2014

    Canberra demolishes the houses

    From 1968 to 1979 a private company blew loose asbestos insulation, mostly amosite, into the roofs of over 1,000 homes in the Australian Capital Territory, the homes later called "Mr Fluffy" houses. A clean-up in 1989 to 1993 removed visible and reachable asbestos, but fibers were found in the living spaces of many homes more than 20 years later. In August 2014 the territory government decided to buy back and demolish every affected home, and demolitions began in 2015. By 30 June 2021, 1,002 properties had been demolished; buying 983 of them cost A$706 million and the asbestos removal and demolition contracts for 973 cost A$88 million. A 2017 study of all territory residents found that men who had lived in an affected house had 2.5 times the rate of mesothelioma, an asbestos cancer, of other men.

    LessonRemoving the visible insulation did not remove the hazard; only demolition did.

    pmc.ncbi.nlm.nih.govparliament.act.gov.auebi.ac.uk

    Credit

    ACT Government's Asbestos Response Taskforce; R. J. Korda and colleagues (The Lancet Public Health, 2017)

Watch for

  1. Laser and heat strip bridges

    The Virginia Transportation Research Council reports that heating the coating off by electrical induction and then cleaning the last layer with a laser removed hazardous bridge coatings about 10 times faster than a laser alone, made less hazardous waste than grit blasting, and left steel that new coatings stuck to. It also found that laser units without an effective built-in fume extractor exposed workers to unacceptable levels of airborne contaminants. It recommends that the Virginia Department of Transportation write specifications for the method.

    Achieved whenthe Virginia Department of Transportation issues a specification and a contractor uses the method on a bridge contract, with workers' exposure results published.

    vtrc.virginia.gov

    Claimed by

    Virginia Transportation Research Council, report 26-R10, 2025 (page last updated September 2025)

  2. AI drafts abatement plans

    CaseMark publishes an open AI "skill" that, it says, "produces a federally compliant abatement plan" for US asbestos removal from a survey report and project details, covering containment, removal method, worker protection, air monitoring, waste and final clearance.

    Achieved whenan outside reviewer, such as a state asbestos program or an accredited project designer, checks a set of its plans against the rules and publishes the error rate.

    casemark.com

    Claimed by

    CaseMark, August 2026 (version 5)

Open

  1. 01

    Demolitions with no asbestos notice

    For one city, match every demolition permit to the asbestos and demolition notices filed with the city, and list the demolitions with no notice on file, as a public map with the code behind it.

    The brief
    Credit · unclaimed
  2. 02

    Robot strips a clean mock-up

    A shared test for removal robots: build-it-yourself mock-ups of three surfaces removal crews meet (sprayed fireproofing on a steel beam, a textured ceiling coating, and wrapped pipe insulation), made only from current products whose safety data sheets list no asbestos or lead, plus a score sheet for area stripped per hour and residue left. Then run a first robot on it.

    The brief
    Credit · unclaimed
  3. 03

    Check plans of work automatically

    A checker that reads a licensed contractor's written plan of work for an asbestos removal in the UK and lists what is missing or inconsistent with HSE's guidance, for example an enclosure too large for the planned fans to change about 8 times an hour, no arrangement for smoke tests, or no route for waste, citing the paragraph of guidance behind each finding.

    The brief
    Credit · unclaimed

Open 01 · the brief

Demolitions with no asbestos notice

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

For one city, match every demolition permit to the asbestos and demolition notices filed with the city, and list the demolitions with no notice on file, as a public map with the code behind it.

Why it is still open

US rules require notice before most demolitions, and Chicago publishes both its building permits and its asbestos and demolition notices as open data. The nearest prior work uses notices only to count demolitions: a Detroit-area dataset of notices from 2009 to 2015 calls them "an excellent proxy for identifying structures that have been demolished", a 2026 table on Hugging Face lists the notice rules of seven states, and a GitHub project has logged new Chicago demolition permits each day since August 2026 without checking them against notices. A search found no published match of permits against notices.

catalog.data.govhuggingface.codata.cityofchicago.orggithub.com

Built with what exists

Chicago's building permits (dataset ydr8-5enu) and its asbestos and demolition notices (dataset qhb4-qx8k) through the city's Socrata API, an address parser such as libpostal, Python and a web map.

  1. First step

    Pull 2024. The city's data list 635 wrecking and demolition permits issued that year (count made through the city's API in November 2026); match them to the notices for work that started that year and read the first 20 that do not match.

  2. Done looks like

    Every Chicago wrecking or demolition permit from 2020 to 2025 marked as matched or unmatched, 50 unmatched cases checked by hand for exemptions and address errors, and the unmatched rate published with its margin of error.

Open 02 · the brief

Robot strips a clean mock-up

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A shared test for removal robots: build-it-yourself mock-ups of three surfaces removal crews meet (sprayed fireproofing on a steel beam, a textured ceiling coating, and wrapped pipe insulation), made only from current products whose safety data sheets list no asbestos or lead, plus a score sheet for area stripped per hour and residue left. Then run a first robot on it.

Why it is still open

Removal robots have each been tested only on their own rigs. Carnegie Mellon's BOA stripped stand-in insulation at about 25 feet an hour and then failed on its first real job; the EU's Bots2ReC robots, which ended in 2019, could not be tested in operational conditions to the extent planned; and Inria's TELEMOVTOP project helped the French waterproofing firm Iso-Top Étanchéité build a remote-controlled robot for removing asbestos roof tiles. No shared mock-up or score lets anyone compare them.

osti.govcordis.europa.eumembers.loria.fr

Built with what exists

A collaborative robot arm such as a Universal Robots UR10e on a mobile lift, a scraper or wet-stripping head with a HEPA vacuum shroud, a camera, NVIDIA's GR00T robot model trained from a few demonstrations (see the Note "Five demonstrations per task"), and Hugging Face's LeRobot to record the runs (see the Note "No download"). Never use material taken from an existing building. New products still make dust, so work wet, with a dust mask, eye protection, the arm's speed limits and an emergency stop.

  1. First step

    Build a 1 m by 1 m ceiling panel with a current asbestos-free texture product, let it cure, and time a person stripping it wet so the robot has a target.

  2. Done looks like

    The mock-up recipes and score sheet published, and 20 filmed runs per surface reporting square meters per hour and percent of area left, set beside a person with hand tools on the same mock-up.

Open 03 · the brief

Check plans of work automatically

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A checker that reads a licensed contractor's written plan of work for an asbestos removal in the UK and lists what is missing or inconsistent with HSE's guidance, for example an enclosure too large for the planned fans to change about 8 times an hour, no arrangement for smoke tests, or no route for waste, citing the paragraph of guidance behind each finding.

Why it is still open

Regulators check plans by hand: in January 2026 Northern Ireland's regulator, HSENI, announced a campaign to review licensed contractors' plans of work. CaseMark's AI skill drafts US abatement plans but does not check plans against a regulator's guidance, and no accuracy test of it was found.

hseni.gov.ukcasemark.comhse.gov.uk

Built with what exists

HSE's guide HSG247, HSENI's notification requirements (form ASB5-NI and a site-specific plan of work), an AI model that reads long documents and cites the source of each finding (see the Note "Findings that cite notes"), and a test set of plans.

  1. First step

    Write five sample plans for one common job, such as removing asbestos insulating board from a school corridor, seed each with known faults, and run a first version of the checker on them.

  2. Done looks like

    On 50 plans holding 200 faults seeded by an experienced reviewer, the checker finds at least 90% of them with no more than one false alarm per plan, compared with two human reviewers on the same set.