Industries / Energy, water and waste / Environmental services / Recycling
Sorting plants
A sorting plant, or materials recovery facility (MRF), splits mixed recyclables into bales of single materials and sells them to mills, smelters and reprocessors.
5
Milestones achieved, from 1970s to 2016.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1970s
Machines sort a city's trash
By the early 1970s the US Bureau of Mines had run a pilot plant for more than two years that took ash from city incinerators at 1,000 pounds an hour and recovered metals, glass and minerals it valued at about $15 a ton, at a cost of about $4 a ton. It was then starting a similar plant to take raw household waste from collection trucks and separate tin cans and iron, other metals, clear and colored glass, paper and plastics. At Franklin, Ohio, a demonstration plant built under a US Environmental Protection Agency grant was designed to take up to 150 tons a day of unsorted city waste straight from the trucks and separate fiber, metal, glass and plastic.
Credit
US Bureau of Mines; the EPA's Solid Waste Management Office and the Hydrasposal-Fibreclaim project at Franklin
2014
Sorting plants must sample
From 1 October 2014, permitted plants in England and Wales that receive at least 1,000 metric tons a year of mixed household-type recycling must weigh what each supplier delivers, take samples of it and sort each sample by weight into target material, non-target material and non-recyclable material. Since 1 October 2016 the rule has been one sample for every 125 metric tons from each supplier, each sample at least 55 kg and averaging 60 kg or more. Bales leaving the plant are sampled too, and the Environment Agency publishes the returns; its 2025 file covers 171 facilities.
Credit
UK and Welsh governments (Environmental Permitting (England and Wales) (Amendment) Regulations 2014, Schedule 9A); Environment Agency
2015
One bin for all fails
Montgomery, Alabama, sent all its household waste, recyclables and trash together, to the Infinitus Renewable Energy Park, a mixed-waste sorting plant that opened in 2014 under a 20-year contract and whose owner said it could divert "north of 60 percent" from landfill. The city removed its drop-off recycling bins in 2015. In October 2015 the plant closed, the owner blamed falling commodity prices, and the city's waste went straight to landfill. The city's finance director later said the plant needed about 150,000 tons a year but received about 78,000 tons from the city and 24,000 from elsewhere in its last year.
LessonA plant that takes a city's whole waste stream leaves the city with no recycling at all when it stops; Montgomery residents still had none nearly a year and a half later.
Credit
Infinitus Energy; City of Montgomery
2016
Fire rules cap pile sizes
England's Environment Agency published fire prevention plan guidance on 29 July 2016, which permitted sites storing combustible waste must follow. A plan must aim to put out any fire within 4 hours, keep permanent ignition sources at least 6 m from combustible waste and limit pile sizes: in the current version, 750 cubic meters for loose plastics, 450 for baled plastics or pieces 30 to 150 mm long, and 300 for pieces under 30 mm. Sites also need a written procedure and a quarantine area for loads that arrive hot.
Credit
Environment Agency
2016
A robot learns to pick
AMP Robotics' first sorting robot, nicknamed Clarke, went to work at Alpine Waste & Recycling's plant in Denver in late 2016, using AI vision to pick food and drink cartons off the belt, ColoradoBiz reported in June 2017. In 2020 the US hauler Waste Connections agreed to deploy 24 AMP systems in its plants, and by August 2025 the partners counted more than 50.
LessonLearning on a real belt was slow; Fortune reported in 2025 that the first robot took "a year or two" to sort reliably.
Credit
AMP Robotics (now AMP), founded by Matanya Horowitz; Alpine Waste & Recycling; Waste Connections
Watch for
An AI-run plant in Colorado
AMP and Waste Connections broke ground in August 2025 on a sorting plant in Commerce City, Colorado, that they say will process up to 62,000 tons of single-stream recycling a year "with minimal human intervention," using AMP's AI sorting system. AMP will run it under a pay-per-ton agreement "with guaranteed performance." The plant was due to open in 2026, and no report of its opening was found by November 2026.
Achieved whenthe plant has run for a year and Waste Connections or an outside auditor publishes its tonnage, recovery rate and bale purity.
Claimed by
AMP and Waste Connections, August 2025
Cameras as compliance proof
Greyparrot sells AI cameras that log what passes on sorting lines. In a February 2026 account on Greyparrot's site, Alan Smith, chief technology officer of the recycler GreenTech, said regulators had accepted the systems' data as proof that food-grade plastic streams hold less than 5% non-food-grade material.
Achieved whena named regulator publishes that it accepts camera measurements for a stated purpose, or an independent study compares the camera readings with hand-sorted samples from the same stream.
Claimed by
GreenTech and Greyparrot, February 2026
Open
01
Self-reported samples, checked
An open set of checks run on the Environment Agency's Materials Facilities files from 2020 to 2025 that flags patterns unlikely in real sampling, such as sample compositions repeated exactly, sample weights bunched at the legal minimum, long runs of perfectly pure bales, and outputs that do not balance with inputs, with a report for each site.
The briefCredit · unclaimed02
Hot-load images for detectors
An openly licensed set of thermal-camera images and short videos of loads of mixed recyclables with warm objects hidden at known depths and temperatures, plus labeled tipping-floor footage from a cooperating plant, and a detector scored on it.
The briefCredit · unclaimed
Open 01 · the brief
Self-reported samples, checked
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open set of checks run on the Environment Agency's Materials Facilities files from 2020 to 2025 that flags patterns unlikely in real sampling, such as sample compositions repeated exactly, sample weights bunched at the legal minimum, long runs of perfectly pure bales, and outputs that do not balance with inputs, with a report for each site.
Why it is still open
Operators take, sort and weigh their own samples, and the agency publishes them as received. In May 2026 the Office for Environmental Protection found that, given its recording practices, the Environment Agency can only be confident that about 64% of the waste sites it regulates comply with their permits, against a reported 97%. The government's 2020 review of the rules found errors in the published figures, said that each operator sets its own definitions of target material so plants cannot be compared with confidence, and noted that little had been published about the agency's compliance audits. No public check of the sample data's plausibility was found.
Built with what exists
The yearly files on data.gov.uk; Python with pandas; simple statistical tests (last-digit counts, duplicate detection, input-output mass balance); an agent that writes each flag with the rows behind it (see the Note "Findings that cite notes").
First step
Download the 2025 file and publish, for each site, the share of output samples reported as 100% target material and the spread of its sample weights.
Done looks like
Every site-year from 2020 to 2025 scored on at least six named checks, each flag published with the rows behind it, 50 flagged sites reviewed by hand, and a published response from the Environment Agency or at least three operators.
Open 02 · the brief
Hot-load images for detectors
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An openly licensed set of thermal-camera images and short videos of loads of mixed recyclables with warm objects hidden at known depths and temperatures, plus labeled tipping-floor footage from a cooperating plant, and a detector scored on it.
Why it is still open
England's fire guidance requires every permitted site storing combustible waste to have a written procedure for finding, isolating, monitoring and cooling hot loads. The open thermal fire datasets found are of wildfires and room fires; a 2024 study of "pile fire" detection, for example, used a wildfire image set, and a search of Zenodo found no thermal set of waste loads.
Built with what exists
A low-cost radiometric thermal camera such as a Teledyne FLIR Lepton 3.5 on a PureThermal board; a phone camera for paired visible images; air-activated hand warmers and warm-water bottles as safe heat sources; Label Studio; Ultralytics YOLO; or Liquid AI's LFM3 vision model, fine-tuned on one graphics card (see the Note "One GPU to fine-tune"). No fire, no batteries.
First step
Fill a crate with clean, dry cardboard and plastic, bury a hand warmer at three depths, and film 100 passes with a thermal camera.
Done looks like
At least 2,000 labeled thermal frames, at least 500 of them with a warm object buried 5 to 30 cm deep, each with the object's measured surface temperature and depth; detection rate and false alarms per hour published for a held-out set; data released under an open license.