Industries / Media, arts and recreation / Professional sports
Stadiums
Stadium work is designing, building, running and keeping safe the grounds and arenas where professional sport is played: the playing surface, the routes crowds use to get in and out, the public money that often pays for them, and the energy and water they use.
6
Milestones achieved, from 1966 to 2023.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1966
A roof, then plastic grass
The Astrodome in Houston opened in April 1965; the Handbook of Texas calls it the first fully air-conditioned, enclosed, domed, multipurpose sports stadium in the world, and SABR calls it the first domed stadium. The roof was painted to cut glare for fielders, and the grass under it died for lack of light. In 1966 synthetic turf replaced it, the infield in time for the 18 April home opener and the outfield by 19 July, and the product was renamed AstroTurf. Most of the money was public: $31.6 million of a cost above $40 million came from two Harris County bond issues.
Lessonhow much light a roof lets through decides whether real grass can grow beneath it.
Credit
Harris County; Roy Hofheinz; Monsanto (the Handbook names its Chemstrand Company)
1990
Seats replace terraces in England
On 15 April 1989 a crush at Hillsborough stadium in Sheffield killed 96 people; a 97th, Andrew Devine, died in 2021, and a coroner ruled that he too was unlawfully killed. Lord Justice Taylor's final report in January 1990 named overcrowding as the cause and backed all-seater grounds, and the government used the Football Spectators Act 1989 to end standing at first and second division grounds by August 1994. The Football Licensing Authority enforced this; it was renamed the Sports Grounds Safety Authority (SGSA) in 2011. In 2022, after a trial evaluated independently by CFE Research, top-two-division clubs were allowed licensed standing areas with a barrier or rail in front of every row and one person per space.
Lessonstanding came back only once each person's space was fixed and railed.
Credit
Lord Justice Taylor; the Home Office; the Football Licensing Authority, now the SGSA
2018
Grass stitched with plastic fibers
A hybrid pitch grows real grass through plastic (polyethylene) fibers, either stitched deep into the soil or woven into a backing mat, so it survives heavy use and poor light. The Dutch maker Desso says it laid the first hybrid pitch at a professional club, FC Den Bosch's De Vliert ground, in 1992. In 2018 FIFA said most major league stadiums and some World Cup stadiums now use such engineered surfaces, and published a scale from "fully natural" to "fully synthetic" to classify them.
inside.fifa.comlink.springer.comsportsfieldmanagementonline.com
Credit
Desso (its GrassMaster system is now sold by Tarkett); FIFA for the classification
2022
Tear gas at Kanjuruhan
On 1 October 2022 Arema FC lost 3–2 to Persebaya Surabaya at Kanjuruhan Stadium in Malang, Indonesia. Police fired tear gas toward the stands, and fans were crushed as they fled to the exits; Al Jazeera put the death toll at 135, and Indonesia's human rights commission, Komnas HAM, found the tear gas was the main cause. The government's independent fact-finding team found that police rules on the use of force allowed tear gas and had not been aligned with FIFA's Stadium Safety and Security Regulations, and that the entrances also served as the emergency exits although larger gates were available. In November 2022 the national police issued Regulation 10 of 2022, which bars officers at football matches from carrying or using firearms or crowd-dispersal weapons.
Lessona safety rule set by a governing body protects no one until the police and the organizers of each match write it into their own rules.
Credit
the Joint Independent Fact-Finding Team (TGIPF); Komnas HAM; the Indonesian National Police
2023
Economists tally the subsidy evidence
Three economists reviewed more than 130 studies from over 30 years on whether teams and stadiums help local economies, and found "very limited economic impacts". Even after counting civic pride and quality of life, the benefits "tend to fall well short of covering public outlays", and they concluded that large stadium subsidies are not justified as public investments.
Credit
John Bradbury, Dennis Coates and Brad Humphreys, Journal of Economic Surveys 37(4), pages 1389–1431
2023
An arena certified zero carbon
In October 2023 the International Living Future Institute (ILFI) certified Seattle's Climate Pledge Arena under its Zero Carbon standard after reviewing twelve consecutive months of performance data, and said it was the first arena in the world to earn the certification. The standard requires all operating energy to come from new renewable sources and all embodied carbon (the emissions from making and building the materials) to be disclosed and offset. The arena replaced planned gas uses with electric ones, including heating and the ice resurfacer, and with Amazon bought and retired more than 100,000 MWh of renewable energy certificates to cover what its own solar panels do not supply.
Credit
Oak View Group, the Seattle Kraken and Amazon; ILFI as certifier
Watch for
AI crowd counts from drones
At Manchester United against Arsenal at Old Trafford on 9 March 2025, AI processed 2.5 hours of live drone footage and gave police real-time crowd counts, helping them spot surges, bottlenecks and obstructions. The trial reports "100 per cent system reliability", and warnings of dangerous density are described as coming "soon".
Achieved whenan independent evaluation compares the system's counts and density estimates with measured counts at the same matches, and a ground's safety team uses it routinely.
Claimed by
Greater Manchester Police and the LSE Centre for Economic Performance (platform supplied by N-AI), May 2025
Solar roof at London Stadium
The stadium says 3,350 solar panels built into its 6,500 m² roof membrane have generated more than 1 million kWh since July 2025 and avoided about 177 tonnes of carbon dioxide, and that they produced over 140,000 kWh in June 2026, 21% of the venue's demand that month.
Achieved whenthe metered generation and total demand are published, or checked by an independent auditor or certifier.
Claimed by
London Stadium (sustainability manager Sacha Giovannoni) and the installer Ameresco UK, October 2026
Open
01
Open exit counts after matches
An open dataset of how fast spectators leave real matches, counted exit by exit (people per minute) and stand by stand at several grounds, plus an open-source crowd simulation of one stand that is calibrated on some matches and tested on others it has not seen.
The briefCredit · unclaimed02
Per-event energy and water table
An open table of electricity, heating fuel and water use per event (or per day) at many professional venues, each row giving the event type, attendance and weather and traced to its source.
The briefCredit · unclaimed
Open 01 · the brief
Open exit counts after matches
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open dataset of how fast spectators leave real matches, counted exit by exit (people per minute) and stand by stand at several grounds, plus an open-source crowd simulation of one stand that is calibrated on some matches and tested on others it has not seen.
Why it is still open
Researchers have compared simulations with real match exits, but with commercial simulators and no open counts: Hubert Klüpfel compared video of spectators leaving a Germany–Scotland match at Dortmund's Westfalenstadion with TraffGo's PedGo simulator (2006), and Danielle Aucoin's 2019 York University thesis checked the MassMotion simulator against exits filmed at two stadiums. Aucoin wrote that "There is a need for a large database of publicly available pedestrian movement profiles." The open stadium data in Forschungszentrum Jülich's pedestrian archive come from volunteers at Düsseldorf's Esprit Arena in April 2009 who left their seats "on command", not from real matches. The SGSA's Green Guide explains how to calculate "entry, holding, exit and emergency exit capacities", and its research list contains no work on validating exit flows.
traffgo-ht.comyorkspace.library.yorku.cadoi.orgsgsa.org.uksgsa.org.uk
Built with what exists
JuPedSim, an open-source pedestrian simulator from Forschungszentrum Jülich; Jülich's Esprit Arena stair and exit-tunnel data for first calibration; Jülich's PeTrack, or hand tally counters, to count people passing exits on video recorded with the ground's permission, keeping counts only and no faces; a public seating plan of the stand.
First step
Reproduce the flows in Jülich's "Stairs in stadium" and "Mouth hole in stadium" datasets in JuPedSim, and write to one club's safety officer, perhaps at a lower-league ground, asking permission to count exits at one stand.
Done looks like
Exit counts from at least 10 matches at 2 or more grounds published under an open license. On at least 5 matches held back from calibration, the model's time to empty the stand is within 10% of the measured time, with the error in each exit's flow reported, and a one-page comparison against a Green Guide capacity calculation.
Open 02 · the brief
Per-event energy and water table
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open table of electricity, heating fuel and water use per event (or per day) at many professional venues, each row giving the event type, attendance and weather and traced to its source.
Why it is still open
New York City's open building-energy data publish only calendar-year totals for Yankee Stadium and Citi Field; Yankee Stadium used 26,260,369.8 kWh of grid electricity and 34,825.6 thousand US gallons (about 132,000 m³) of water in 2024, with no split by event. ENERGY STAR gives stadiums no 1–100 score, so there is no national benchmark. A UK energy consultancy, Trident Utilities, analyzed 24 months of half-hourly meter data at one club's stadium and found "an average 111% uplift in daily energy consumption when an event occurred, but there was no standardised effect", and did not publish the data. Sport Positive Leagues ranks clubs on their sustainability work, not on metered use.
data.cityofnewyork.usenergystar.govtridentutilities.co.uksportpositiveleagues.com
Built with what exists
NYC Open Data's API and other cities' building-energy disclosure data; ENERGY STAR Portfolio Manager's "Stadium (Open)", "Stadium (Closed)" and "Indoor Arena" types as shared definitions; public fixture lists and weather records; Python with pandas; public-records requests to venues owned by public bodies.
First step
Pull the 2022–2024 rows for Yankee Stadium and Citi Field and divide each year's totals by the number of home dates for a rough per-event baseline. Then send records requests for interval meter data to two publicly owned venues.
Done looks like
At least 10 venues, each with at least one full season of per-event or daily rows (kWh, m³ of water, event type, attendance), every row traced to a source, published under an open license with method notes and a summary of kWh and liters per spectator per event.