BRENNEN

Industries / Media, arts and recreation / Professional sports

Stadiums

Stadium work is designing, building, running and keeping safe the grounds and arenas where professional sport is played: the playing surface, the routes crowds use to get in and out, the public money that often pays for them, and the energy and water they use.

6

Milestones achieved, from 1966 to 2023.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1966

    A roof, then plastic grass

    The Astrodome in Houston opened in April 1965; the Handbook of Texas calls it the first fully air-conditioned, enclosed, domed, multipurpose sports stadium in the world, and SABR calls it the first domed stadium. The roof was painted to cut glare for fielders, and the grass under it died for lack of light. In 1966 synthetic turf replaced it, the infield in time for the 18 April home opener and the outfield by 19 July, and the product was renamed AstroTurf. Most of the money was public: $31.6 million of a cost above $40 million came from two Harris County bond issues.

    Lessonhow much light a roof lets through decides whether real grass can grow beneath it.

    tshaonline.orgsabr.org

    Credit

    Harris County; Roy Hofheinz; Monsanto (the Handbook names its Chemstrand Company)

  2. 1990

    Seats replace terraces in England

    On 15 April 1989 a crush at Hillsborough stadium in Sheffield killed 96 people; a 97th, Andrew Devine, died in 2021, and a coroner ruled that he too was unlawfully killed. Lord Justice Taylor's final report in January 1990 named overcrowding as the cause and backed all-seater grounds, and the government used the Football Spectators Act 1989 to end standing at first and second division grounds by August 1994. The Football Licensing Authority enforced this; it was renamed the Sports Grounds Safety Authority (SGSA) in 2011. In 2022, after a trial evaluated independently by CFE Research, top-two-division clubs were allowed licensed standing areas with a barrier or rail in front of every row and one person per space.

    Lessonstanding came back only once each person's space was fixed and railed.

    api.parliament.ukexpressandstar.comlegislation.gov.ukgov.uk

    Credit

    Lord Justice Taylor; the Home Office; the Football Licensing Authority, now the SGSA

  3. 2018

    Grass stitched with plastic fibers

    A hybrid pitch grows real grass through plastic (polyethylene) fibers, either stitched deep into the soil or woven into a backing mat, so it survives heavy use and poor light. The Dutch maker Desso says it laid the first hybrid pitch at a professional club, FC Den Bosch's De Vliert ground, in 1992. In 2018 FIFA said most major league stadiums and some World Cup stadiums now use such engineered surfaces, and published a scale from "fully natural" to "fully synthetic" to classify them.

    inside.fifa.comlink.springer.comsportsfieldmanagementonline.com

    Credit

    Desso (its GrassMaster system is now sold by Tarkett); FIFA for the classification

  4. 2022

    Tear gas at Kanjuruhan

    On 1 October 2022 Arema FC lost 3–2 to Persebaya Surabaya at Kanjuruhan Stadium in Malang, Indonesia. Police fired tear gas toward the stands, and fans were crushed as they fled to the exits; Al Jazeera put the death toll at 135, and Indonesia's human rights commission, Komnas HAM, found the tear gas was the main cause. The government's independent fact-finding team found that police rules on the use of force allowed tear gas and had not been aligned with FIFA's Stadium Safety and Security Regulations, and that the entrances also served as the emergency exits although larger gates were available. In November 2022 the national police issued Regulation 10 of 2022, which bars officers at football matches from carrying or using firearms or crowd-dispersal weapons.

    Lessona safety rule set by a governing body protects no one until the police and the organizers of each match write it into their own rules.

    aljazeera.comid.wikisource.orgnews.republika.co.id

    Credit

    the Joint Independent Fact-Finding Team (TGIPF); Komnas HAM; the Indonesian National Police

  5. 2023

    Economists tally the subsidy evidence

    Three economists reviewed more than 130 studies from over 30 years on whether teams and stadiums help local economies, and found "very limited economic impacts". Even after counting civic pride and quality of life, the benefits "tend to fall well short of covering public outlays", and they concluded that large stadium subsidies are not justified as public investments.

    econpapers.repec.org

    Credit

    John Bradbury, Dennis Coates and Brad Humphreys, Journal of Economic Surveys 37(4), pages 1389–1431

  6. 2023

    An arena certified zero carbon

    In October 2023 the International Living Future Institute (ILFI) certified Seattle's Climate Pledge Arena under its Zero Carbon standard after reviewing twelve consecutive months of performance data, and said it was the first arena in the world to earn the certification. The standard requires all operating energy to come from new renewable sources and all embodied carbon (the emissions from making and building the materials) to be disclosed and offset. The arena replaced planned gas uses with electric ones, including heating and the ice resurfacer, and with Amazon bought and retired more than 100,000 MWh of renewable energy certificates to cover what its own solar panels do not supply.

    living-future.org

    Credit

    Oak View Group, the Seattle Kraken and Amazon; ILFI as certifier

Watch for

  1. AI crowd counts from drones

    At Manchester United against Arsenal at Old Trafford on 9 March 2025, AI processed 2.5 hours of live drone footage and gave police real-time crowd counts, helping them spot surges, bottlenecks and obstructions. The trial reports "100 per cent system reliability", and warnings of dangerous density are described as coming "soon".

    Achieved whenan independent evaluation compares the system's counts and density estimates with measured counts at the same matches, and a ground's safety team uses it routinely.

    lse.ac.uk

    Claimed by

    Greater Manchester Police and the LSE Centre for Economic Performance (platform supplied by N-AI), May 2025

  2. Solar roof at London Stadium

    The stadium says 3,350 solar panels built into its 6,500 m² roof membrane have generated more than 1 million kWh since July 2025 and avoided about 177 tonnes of carbon dioxide, and that they produced over 140,000 kWh in June 2026, 21% of the venue's demand that month.

    Achieved whenthe metered generation and total demand are published, or checked by an independent auditor or certifier.

    renewableenergymagazine.com

    Claimed by

    London Stadium (sustainability manager Sacha Giovannoni) and the installer Ameresco UK, October 2026

Open

  1. 01

    Open exit counts after matches

    An open dataset of how fast spectators leave real matches, counted exit by exit (people per minute) and stand by stand at several grounds, plus an open-source crowd simulation of one stand that is calibrated on some matches and tested on others it has not seen.

    The brief
    Credit · unclaimed
  2. 02

    Per-event energy and water table

    An open table of electricity, heating fuel and water use per event (or per day) at many professional venues, each row giving the event type, attendance and weather and traced to its source.

    The brief
    Credit · unclaimed

Open 01 · the brief

Open exit counts after matches

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open dataset of how fast spectators leave real matches, counted exit by exit (people per minute) and stand by stand at several grounds, plus an open-source crowd simulation of one stand that is calibrated on some matches and tested on others it has not seen.

Why it is still open

Researchers have compared simulations with real match exits, but with commercial simulators and no open counts: Hubert Klüpfel compared video of spectators leaving a Germany–Scotland match at Dortmund's Westfalenstadion with TraffGo's PedGo simulator (2006), and Danielle Aucoin's 2019 York University thesis checked the MassMotion simulator against exits filmed at two stadiums. Aucoin wrote that "There is a need for a large database of publicly available pedestrian movement profiles." The open stadium data in Forschungszentrum Jülich's pedestrian archive come from volunteers at Düsseldorf's Esprit Arena in April 2009 who left their seats "on command", not from real matches. The SGSA's Green Guide explains how to calculate "entry, holding, exit and emergency exit capacities", and its research list contains no work on validating exit flows.

traffgo-ht.comyorkspace.library.yorku.cadoi.orgsgsa.org.uksgsa.org.uk

Built with what exists

JuPedSim, an open-source pedestrian simulator from Forschungszentrum Jülich; Jülich's Esprit Arena stair and exit-tunnel data for first calibration; Jülich's PeTrack, or hand tally counters, to count people passing exits on video recorded with the ground's permission, keeping counts only and no faces; a public seating plan of the stand.

  1. First step

    Reproduce the flows in Jülich's "Stairs in stadium" and "Mouth hole in stadium" datasets in JuPedSim, and write to one club's safety officer, perhaps at a lower-league ground, asking permission to count exits at one stand.

  2. Done looks like

    Exit counts from at least 10 matches at 2 or more grounds published under an open license. On at least 5 matches held back from calibration, the model's time to empty the stand is within 10% of the measured time, with the error in each exit's flow reported, and a one-page comparison against a Green Guide capacity calculation.

Open 02 · the brief

Per-event energy and water table

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table of electricity, heating fuel and water use per event (or per day) at many professional venues, each row giving the event type, attendance and weather and traced to its source.

Why it is still open

New York City's open building-energy data publish only calendar-year totals for Yankee Stadium and Citi Field; Yankee Stadium used 26,260,369.8 kWh of grid electricity and 34,825.6 thousand US gallons (about 132,000 m³) of water in 2024, with no split by event. ENERGY STAR gives stadiums no 1–100 score, so there is no national benchmark. A UK energy consultancy, Trident Utilities, analyzed 24 months of half-hourly meter data at one club's stadium and found "an average 111% uplift in daily energy consumption when an event occurred, but there was no standardised effect", and did not publish the data. Sport Positive Leagues ranks clubs on their sustainability work, not on metered use.

data.cityofnewyork.usenergystar.govtridentutilities.co.uksportpositiveleagues.com

Built with what exists

NYC Open Data's API and other cities' building-energy disclosure data; ENERGY STAR Portfolio Manager's "Stadium (Open)", "Stadium (Closed)" and "Indoor Arena" types as shared definitions; public fixture lists and weather records; Python with pandas; public-records requests to venues owned by public bodies.

  1. First step

    Pull the 2022–2024 rows for Yankee Stadium and Citi Field and divide each year's totals by the number of home dates for a rough per-event baseline. Then send records requests for interval meter data to two publicly owned venues.

  2. Done looks like

    At least 10 venues, each with at least one full season of per-event or daily rows (kWh, m³ of water, event type, attendance), every row traced to a source, published under an open license with method notes and a summary of kWh and liters per spectator per event.