Industries / Media, arts and recreation / Museums
Exhibitions
Planning, borrowing, installing and lighting shows, and explaining them in the galleries.
5
Milestones achieved, from 1975 to 2025.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1975
The state insures loans
The US Congress created the Arts and Artifacts Indemnity program in 1975 "for the purpose of minimizing the costs of insuring international exhibitions": the government covers loss of or damage to borrowed works, so organizers need not buy commercial insurance for them. The National Endowment for the Arts says the program has indemnified more than 1,200 exhibitions, saving organizers more than $417 million in premiums; domestic exhibitions were added in 2007, and one international exhibition can now be covered for up to $1.8 billion.
Credit
US Congress; National Endowment for the Arts
1976
Tutankhamun tours America
The Treasures of Tutankhamun, 55 objects chosen from more than 5,000 found in the tomb, opened at the National Gallery of Art in Washington on 17 November 1976, and 830,340 people came in its 17 weeks there, by Aramco World's 1977 count. It went on to Chicago, New Orleans, Los Angeles and Seattle and ended at the Metropolitan Museum of Art in New York, which headed the group of six American museums that sponsored the tour.
Credit
Metropolitan Museum of Art and five partner museums
2014
LEDs in the Sistine Chapel
On 29 October 2014 Osram lit the Sistine Chapel with more than 7,000 LEDs, a pilot called LED4Art supported by the European Union. Osram says the system is "designed to protect the artworks while enabling much stronger lighting" and uses up to 90% less electricity than the one it replaced.
Credit
Osram; the LED4Art project
2020
Timed tickets for Leonardo
The Louvre's Leonardo da Vinci exhibition closed on 24 February 2020 after 104 days with 1,071,840 visitors, about 9,783 a day, more than the 540,000 of its 2018 Delacroix show; entry "was by timed reservation only".
LessonSelling entry by time slot is one way to take a crowd larger than the rooms can hold at once.
Credit
Musée du Louvre
2025
Tutankhamun's tomb together again
The Grand Egyptian Museum near Giza, a $1 billion museum, opened on 1 November 2025, and two days later put on show more than 4,500 of Tutankhamun's treasures: "almost the entire collection", "displayed together for the first time since the young pharaoh's tomb was discovered in 1922", by AFP's report.
Credit
Grand Egyptian Museum; the Egyptian government
Watch for
A poster that answers questions
The London Transport Museum has turned a 1927 poster by Frederick Charles Herrick into an AI guide that answers visitors' questions in 60 languages from curator-written documents, "with guardrails for visitors who try to catch it out". Its team says it needs under £10,000 of equipment and costs about £6–8 an hour to run.
Achieved whenan outside evaluation publishes the share of real visitors' questions it answers correctly and the share it rightly declines to answer.
Claimed by
the London Transport Museum project team, at the Museum AI Summit, June 2026, in MuseumNext's write-up
Open
01
A checker for loan forms
Software that reads a borrower's completed facility report (the standard form that describes its building, galleries, security, handling and climate) and the temperature and humidity readings attached to it, compares every answer with the lender's loan conditions, and lists each mismatch with the page and line it came from.
The briefCredit · unclaimed02
A test for gallery guides
A public set of a few thousand questions that real visitors ask about the objects in one gallery, typed and spoken, in several languages, each with an answer checked by curators and a note of what the visitor was really trying to find out; and a scoring program that rates any AI guide on correct facts, on saying so when it does not know, and on keeping to the museum's own sources.
The briefCredit · unclaimed
Open 01 · the brief
A checker for loan forms
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
Software that reads a borrower's completed facility report (the standard form that describes its building, galleries, security, handling and climate) and the temperature and humidity readings attached to it, compares every answer with the lender's loan conditions, and lists each mismatch with the page and line it came from.
Why it is still open
The UK Registrars Group's Standard Facilities Report, re-issued in December 2015, is a form of about ten pages with sections on the building, exhibition area, access, handling and environment, many questions answered YES or NO, and a request to "attach copies of readings for temperature and relative humidity"; security and display cases have their own supplements. In 2014 the IIC and ICOM-CC said "there needs to be transparency about actual environmental conditions achieved in museums to ensure that realistic requirements are made for loan conditions". No tool that checks a completed report against a lender's conditions was found.
Built with what exists
A document-reading AI model that pulls answers out of Word and PDF forms (see the Notes "The jobs agents repeat" and "Seven more flagged"); a model that scores many fixed yes-or-no questions in one pass (see the Note "A thousand questions, one pass"); a short script that measures what share of logged hours fell inside the lender's humidity and temperature bands; the lender's conditions written once as a checklist.
First step
Ask two registrars for five completed facility reports each, with names removed, and the notes they made when they read them.
Done looks like
On 40 past loan files supplied by registrars, with the mismatches the registrars found as the answer key, the tool finds at least 95% of them, raises no more than one false alarm per report, and cites the line for each. The results are published with the registrars' sign-off.
Open 02 · the brief
A test for gallery guides
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public set of a few thousand questions that real visitors ask about the objects in one gallery, typed and spoken, in several languages, each with an answer checked by curators and a note of what the visitor was really trying to find out; and a scoring program that rates any AI guide on correct facts, on saying so when it does not know, and on keeping to the museum's own sources.
Why it is still open
The London Transport Museum's guide, launched in June 2026, answers from curator-written documents, and its team says the curators "validate every response for accuracy, consistency, and tone before any public release"; the write-up reports no measured accuracy. No shared test for museum guides was found.
Built with what exists
Visitor questions collected through a QR code beside each object; speech-to-text for spoken questions (see the Note "Fewer word errors"); curators' checked answers; the method of Ai2's XYBench for questions whose real goal differs from what is asked (see the Note "Answering the question behind the question"); an open scoring script.
First step
Put a card with a QR code beside five objects in one gallery for a month and collect the questions visitors type.
Done looks like
2,000 questions with curator-checked answers in at least five languages, published under an open licence, with scores for at least three guides; on a sample of 200 answers, two curators rating blind agree with the scoring program at least 90% of the time.