BRENNEN

Industries / Technology / Mapping and geospatial

Coordinates and positioning

This work gives every point on a map an agreed address: the projection that flattens the curved Earth onto a sheet or screen, the datum or reference frame from which coordinates are counted, and the correction services that let a receiver place itself to within centimeters or decimeters of that frame.

6

Milestones achieved, from 1569 to 2023.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1569

    A map for sailors

    Gerardus Mercator's world map of 1569, titled in Latin as a description of the world "improved and modified for use by seafarers", was the first map of the whole world on which he used his projection. Its legend explains that charts with equally spaced parallels cannot show three places with correct directions and distances between all of them, and that he had therefore "progressively increased the degrees of latitude towards each pole in proportion to the lengthening of the parallels". The International Hydrographic Bureau called the map "the prototype of the modern marine chart". The Maritime Museum Rotterdam says three originals survive, its own bound by Mercator as an atlas.

    journals.lib.unb.caartsandculture.google.com

    Credit

    Gerardus Mercator

  2. 1984

    One frame for the Earth

    The World Geodetic System 1984 (WGS 84) is the reference frame in which GPS gives positions. It was first defined through the coordinates of five GPS tracking stations, aligned to the international terrestrial frame of the day at the start of 1984. It has been redefined seven times since, as stations moved and measurements improved, most recently as WGS 84 (G2296) in January 2024, aligned to ITRF2020, the International Terrestrial Reference Frame. EPSG, the registry of coordinate systems, says WGS 84 has stayed within 10 cm of the current ITRF since 1997.

    LessonEPSG notes that its plain "WGS 84" entry makes "no distinction" between the original frame and the later ones, so data labeled only "WGS 84" does not say which frame it was measured in.

    epsg.orgepsg.orgepsg.org

    Credit

    the US Defense Mapping Agency and its successors, NIMA and the National Geospatial-Intelligence Agency (NGA)

  3. 2009

    Web maps get a code

    Web map services drew the world on a Mercator projection worked out as if the Earth were a sphere rather than its true, slightly flattened shape. In 2007 EPSG, the registry now kept by IOGP, the oil and gas producers' association (then called OGP), turned down a request from Jeffrey Orrey of Microsoft to add this "spherical Mercator", saying it saw "no technical justification". It added the projection in March 2008, and in February 2009 replaced that entry with EPSG:3857, "WGS 84 / Pseudo-Mercator", marked "Not a recognised geodetic system": compared with a true Mercator it gives errors of 0.7% in scale and differences in northing of up to 43 km on the map (21 km on the ground).

    LessonA registry cannot keep out a definition that software already uses; EPSG ended up listing it, with its errors stated beside it.

    epsg.orgapps.epsg.orgapps.epsg.org

    Credit

    IOGP's EPSG registry; Microsoft, the information source for the entry

  4. 2017

    A continent outruns its map

    Australia's datum GDA94 fixed coordinates as they stood on 1 January 1994, but the continent moves about 7 cm a year on its tectonic plate, so by 2020 GDA94 coordinates differed from global ones by about 1.8 m, by Geoscience Australia's figures. Geoscience Australia published GDA2020 in May 2017, based on ITRF2014 at 1 January 2020; the change also lowered heights above the ellipsoid, the smooth model of the Earth's shape, by about 9 cm.

    LessonA datum fixed to one date drifts away from satellite positions on a moving plate, so a fixed national datum has to be replaced again in time.

    ga.gov.auepsg.org

    Credit

    Geoscience Australia

  5. 2019

    A counter downs a network

    GPS satellites broadcast the week number in a counter that returns to zero every 1,024 weeks, about every 20 years; it did so on 6 April 2019. That day the New York City Wireless Network (NYCWiN), which about 10 city agencies used, including those for public safety, stopped working across the whole network, and it was not fully restored until 17 April. Gartner, which the city hired to assess the outage, found that a timely update of the GPS component's firmware at each of the network's radio sites would have prevented it, although the US Department of Homeland Security had warned of the date in April 2018.

    LessonA date known 20 years ahead still caught equipment nobody had updated; Gartner's first finding was that the city had not replaced the network when its technology reached the end of its life.

    nyc.gov

    Credit

    Gartner's assessment for the City of New York

  6. 2023

    Free corrections from Galileo

    Precise point positioning (PPP) lets a single receiver reach decimeter accuracy, without a nearby base station, by applying exact data on the satellites' orbits and clocks. On 24 January 2023 the initial service of Galileo's High Accuracy Service (HAS) was declared; it sends such corrections free of charge on Galileo's E6-B signal and over the internet. Testing the HAS signals in summer 2022, Nacer Naciri, Ding Yi and Sunil Bisnath of York University in Toronto, with two co-authors, measured 95% errors of 13.1 cm horizontally and 18.6 cm vertically for a moving receiver, reached after 7.5 minutes.

    gsc-europa.eulink.springer.com

    Credit

    the EU Agency for the Space Programme (EUSPA) and the Galileo programme

Watch for

  1. Galileo's full accuracy service

    EUSPA says Galileo will add phase biases and corrections for the ionosphere, the charged upper layer of the atmosphere that slows satellite signals, to the HAS broadcast, aiming to declare the HAS Full Service during 2027, with targets that include 20 cm horizontal accuracy; the published goal is better than 20 cm horizontally and 40 cm vertically, 95% of the time, after 5 minutes.

    Achieved whenEUSPA declares the Full Service and an outside group measures 95% horizontal errors under 20 cm after no more than 5 minutes.

    gsc-europa.eugsc-europa.eulink.springer.com

    Claimed by

    EUSPA, December 2025

Open

  1. 01

    Score the coordinate engines

    A run of GIGS, the free test series that IOGP publishes for how software handles coordinates, against the main coordinate engines: PROJ, which sits under QGIS, GDAL, PostGIS and pyproj; Apache SIS; and Esri's projection engine in ArcGIS Pro. Publish each engine's scores and file every failure as a bug report.

    The brief
    Credit · unclaimed
  2. 02

    Dates tested before 2038

    A test kit of recorded and synthetic receiver output, such as NMEA sentences, u-blox binary messages, RINEX observation files and RTCM correction streams, dated across the next GPS week rollover, plus a runner that feeds it to open-source GNSS and time software and checks the date each one reports.

    The brief
    Credit · unclaimed

Open 01 · the brief

Score the coordinate engines

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A run of GIGS, the free test series that IOGP publishes for how software handles coordinates, against the main coordinate engines: PROJ, which sits under QGIS, GDAL, PostGIS and pyproj; Apache SIS; and Esri's projection engine in ArcGIS Pro. Publish each engine's scores and file every failure as a bug report.

Why it is still open

IOGP says GIGS gives a score for each test series, "allowing for benchmarking and software comparison". In December 2021 a user asked the PROJ mailing list for any systematic comparison of PROJ's results with Esri's, and the reply pointed to GIGS test points rather than to a comparison. In February 2022 Even Rouault wrote on the same list that PROJ runs a subset of GIGS tests, of a version he was unsure of, in its own regression testing, and that these run only on PROJ. A search found no published GIGS scores for PROJ, QGIS or ArcGIS.

gigs.iogp.orglists.osgeo.orglists.osgeo.org

Built with what exists

The GIGS test series and test dataset (version 2.1, free after registering with EPSG); GeoAPI's GIGS runner for engines written in Java, such as Apache SIS; pyproj for PROJ; arcpy in ArcGIS Pro; a Python harness that compares each output with GIGS's expected values.

geoapi.org

  1. First step

    Register with EPSG, download the GIGS 2.1 dataset, and run its 5101 transverse Mercator conversion files through pyproj.

  2. Done looks like

    GIGS scores for at least three engines across every GIGS test series, each failure listed with its test case, and a bug report filed for each.

Open 02 · the brief

Dates tested before 2038

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A test kit of recorded and synthetic receiver output, such as NMEA sentences, u-blox binary messages, RINEX observation files and RTCM correction streams, dated across the next GPS week rollover, plus a runner that feeds it to open-source GNSS and time software and checks the date each one reports.

Why it is still open

The 2019 rollover took down NYCWiN (see Achieved). In 2021 a sanity check in gpsd, the open-source program many Linux systems use to read GPS receivers, subtracted 1,024 weeks from the week number on 24 October 2021, which could send time servers running versions 3.20 to 3.22 back to March 2002; CISA warned users three days before. GPS.gov says receivers that read only the old civil message can expect the next rollover on 20 November 2038; the newer civil message counts weeks in 13 bits and will not roll over until 2137. A search found no published test of how open GNSS software handles the dates around it.

lwn.netcisa.govgps.gov

Built with what exists

gpsd's own regression logs; RTKLIB; GPS-SDR-SIM to write simulated signal files for software receivers such as GNSS-SDR, kept as files and never broadcast; libfaketime to shift system clocks; Python.

  1. First step

    Take one gpsd regression log, shift its dates past 20 November 2038 with a script, and run it through gpsd and RTKLIB.

  2. Done looks like

    At least eight programs tested at ten dates from 2037 to 2039, a public results table, and every failure reported to its maintainers.