BRENNEN

Industries / Industrial equipment and services / Industrial machinery / Industrial filtration

Disposal and recovery

This work deals with spent filters and with the dust, ash and cake they catch: sending it back into the process, recovering metals from it, or storing it safely.

4

Milestones achieved, from 1991 to 2025.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1991

    Japan treats its filter ash

    Fly ash is the fine ash that a waste incinerator's dust collector takes out of its flue gas; at the plant Sang-Yul Kim and colleagues of Hokkaido University sampled, electrostatic precipitators did the work. Under Japan's Waste Disposal and Public Cleansing Law, in the 1991 version they cite, incinerator fly ash must be treated before it goes to landfill, by melting, by setting it in cement, with chemical agents, or by extraction with acid or other solvents, while bottom ash, the ash left on the grate, needs no treatment. They say chelating agents, chemicals that bind heavy metals, are the usual choice because the method is simple, fairly cheap and adds little volume. In their 15-month column tests, two newer treatments, washing then carbonation and carbonation then phosphate, cut the leaching of lead, aluminum and copper by about 10 to 100 times compared with chelating.

    LessonThe treatment chosen for being simple and cheap was not the one that held metals best.

    eprints.lib.hokudai.ac.jp

    Credit

    Government of Japan (the law); Sang-Yul Kim, Nobutoshi Tanaka, Toshihiko Matsuto and Yasumasa Tojo (the 2005 study)

  2. 1995

    Kiln dust needs controls

    Cement kiln dust (CKD) is the dust that a cement plant's air pollution control devices take out of kiln exhaust. EPA estimated that US plants collected 12.7 million metric tons in 1990, that 8.2 million tons (64%) went straight back into the kiln or its raw feed, and that most of the rest went into piles, quarries or landfills, most of them unlined and uncovered. On 7 February 1995, after a report to Congress, EPA determined that more control was warranted, citing documented damage to groundwater and drinking water supplies.

    Lessonwhat a filter catches is a waste of its own, and dust left in open piles moved the pollution into water.

    govinfo.gov

    Credit

    US EPA

  3. 2015

    Zinc recovered, at a cost

    J. Fellner and colleagues at TU Wien estimated that the solid residues of European waste-to-energy plants hold about 69,000 metric tons of zinc a year, more than half of it in air pollution control residues, mainly boiler and filter ashes. A technical-scale plant at a Swiss waste incinerator had begun recovering metallic zinc of more than 99.9% purity from such ash by acid leaching and electrolysis, a process called FLUREC. At a disposal cost of 220 euros per ton of fly ash, the authors found recovery generally cost more than zinc's market price of 1.6 euros per kilogram, and only about 4,800 tons a year came close to paying.

    Lessonrecovering metal from filter ash pays only where landfill is costly or the law requires it.

    pubmed.ncbi.nlm.nih.gov

    Credit

    Christian Doppler Laboratory for Anthropogenic Resources, TU Wien

  4. 2025

    Three quarters of ash treated

    Swiss law requires metals to be recovered from the filter ash of municipal waste incinerators before it is landfilled. On 26 November 2025 the Federal Council said about three quarters of this ash was already treated each year, and extended to 31 December 2027 the date until which untreated ash may be landfilled when recovery plants are full, because a large new plant had been delayed by construction problems and a damage event. For filter ash from burning waste wood it allowed landfilling until 31 December 2033, saying no proven, economically viable recovery method exists.

    Lessona national recovery rule rested on a few large plants, and one late plant moved the deadline.

    bafu.admin.ch

    Credit

    Swiss Federal Council; Federal Office for the Environment (BAFU)

Watch for

  1. All Swiss filter ash treated

    The Swiss Federal Council says new capacity will let all filter ash from municipal waste incinerators be treated for metal recovery, and that untreated ash may be landfilled only until the end of 2027, and then only when existing plants are full.

    Achieved whenBAFU reports a year in which all such filter ash was treated before landfilling.

    bafu.admin.ch

    Claimed by

    Swiss Federal Council, November 2025

Open

  1. 01

    Mapping kiln dust piles

    A public map of cement kiln dust piles and landfills at current and former US cement plants, outlined from aerial and satellite images, with each pile's area, and its permit status and lining where state records give them.

    The brief
    Credit · unclaimed
  2. 02

    Metals from wood-ash filter ash

    A desk study, with no handling of ash, of whether acid leaching of the kind used on incinerator filter ash could recover zinc and lead from the filter ash of plants that burn waste wood. Gather published analyses of that ash, model leaching for each sample with a geochemical program, and predict metal yield and acid use, after first checking the model against published yields for municipal incinerator ash.

    The brief
    Credit · unclaimed

Open 01 · the brief

Mapping kiln dust piles

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public map of cement kiln dust piles and landfills at current and former US cement plants, outlined from aerial and satellite images, with each pile's area, and its permit status and lining where state records give them.

Why it is still open

EPA found in 1995 that most disposed kiln dust sat in unlined, uncovered piles. The groundwater review EPA later commissioned covered 18 facilities owned by 10 companies in 10 states, drawn from an October 2001 industry summary, and a search found no national public inventory of piles.

archive.epa.govgovinfo.gov

Built with what exists

USDA NAIP aerial photographs and Copernicus Sentinel-2 images, both free; EPA's Facility Registry Service for plant locations; QGIS and an image segmentation model to outline piles; a browsing agent such as Browser Use 1.0 to collect state permit files (see the Note "Deleting 80% to start over").

  1. First step

    Download the cement plant list from the Facility Registry Service and outline the piles at five plants by hand.

  2. Done looks like

    Every cement plant in EPA's facility list checked, every visible kiln dust pile outlined with its area, one in ten checked against state permit records, and the result published as an open GeoJSON file.

Open 02 · the brief

Metals from wood-ash filter ash

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A desk study, with no handling of ash, of whether acid leaching of the kind used on incinerator filter ash could recover zinc and lead from the filter ash of plants that burn waste wood. Gather published analyses of that ash, model leaching for each sample with a geochemical program, and predict metal yield and acid use, after first checking the model against published yields for municipal incinerator ash.

Why it is still open

In November 2025 the Swiss Federal Council allowed wood-ash filter ash to be landfilled until 2033 because no proven, economically viable recovery method exists, and TU Wien found zinc recovery from incinerator ash generally cost more than the metal was worth.

bafu.admin.chpubmed.ncbi.nlm.nih.gov

Built with what exists

PHREEQC, the free geochemical modelling program from the US Geological Survey; Python; published ash analyses, including studies commissioned by BAFU.

  1. First step

    Collect every published composition of waste-wood filter ash and the matching incinerator ash leaching results into one table.

  2. Done looks like

    A model that matches at least three published zinc yields for incinerator ash within 10 percentage points, applied to at least 20 published wood-ash analyses, with each sample ranked by predicted yield and acid use and all inputs published.