Industries / Technology / Software and SaaS / Cloud and data centers
Sites and construction
This is the work of choosing where data centers go, getting permission to build them and putting up the buildings.
5
Milestones achieved, from 1958 to 2025.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1958
Buildings made for computers
The SAGE air defense network put each IBM AN/FSQ-7 computer in its own four-story windowless concrete building. Each building had a 3,000 kW power supply and a second machine on standby, and the first was declared operational at McGuire Air Force Base, New Jersey, on 1 July 1958.
Credit
MIT Lincoln Laboratory, IBM and the US Air Force
2005
Data centers built from containers
In April 2009 Google revealed that since 2005 the core of its data centers had been standard shipping containers, each packed with 1,160 servers and drawing up to 250 kW. CNET noted that Sun Microsystems and Rackable Systems also sold modular data centers, but that Google had used them since 2005.
Credit
Google (presented by Jimmy Clidaras); reported by Stephen Shankland, CNET
2018
A data center underwater
In spring 2018 Microsoft sank a data center the size of a shipping container, holding 864 servers, 117 feet deep off Orkney, Scotland, and raised it in summer 2020. Microsoft said its failure rate in the water was one-eighth of the rate on land; DatacenterDynamics (DCD) counts 6 failures among 855 submerged servers, against 8 among 135 in an ordinary data center. In June 2024 Microsoft's head of cloud operations told DCD, "I'm not building subsea data centers anywhere in the world."
LessonA site can work in a trial and still not be adopted.
Credit
Microsoft's Project Natick, led by Ben Cutler, at the European Marine Energy Centre
2019
A city pauses data centers
On 12 July 2019 Amsterdam and the neighbouring municipality of Haarlemmermeer, in what DCD calls part of Europe's largest data center hub, halted new data centers until a regional policy was written. The councils asked that data centers use as little space as possible, fit in with their surroundings, and give their waste heat free of charge to heat homes.
LessonA local planning authority can stop growth in a major hub and use the pause to set conditions such as heat reuse.
Credit
the municipalities of Amsterdam and Haarlemmermeer
2025
No more building by right
On 18 March 2025 Loudoun County, Virginia, stopped treating data centers as a "by-right" use, one allowed without review by the Planning Commission or the Board of Supervisors. Most new data centers there now need a special exception that the Board must approve after public hearings. On 16 September 2026 the Board also paused its consideration of certain data center applications while it rewrites its rules, though at least 17 cases, more than 11 million square feet, go ahead under a 2025 grandfathering clause.
Credit
Loudoun County Board of Supervisors
Watch for
Server halls in tents
Meta says it is putting up weatherproof tents and building GPU and network clusters inside them, so that capacity comes online in months instead of years, and that its 1 GW Prometheus cluster in New Albany, Ohio, comes online in 2026. A Meta spokesperson said the whole cluster is not in tents.
Achieved whenan outside party confirms that halls housed in tents have run production work through a full year of weather.
Claimed by
Meta (Mark Zuckerberg), July 2025
Computing in orbit
Starcloud launched Starcloud-1, a 60 kg satellite carrying an NVIDIA H100 GPU, on 2 November 2025 into an orbit about 350 km up. The company then ran Google's Gemma language model on it and, by its account, trained a small model in orbit. It plans a larger satellite, Starcloud-2, with several GPUs and paying customers.
Achieved whenan orbiting data center sells computing to customers who confirm it, or an outside party publishes its performance.
Claimed by
Starcloud (Philip Johnston), November and December 2025
Open
01
Measured noise at named sites
The first standards-grade public recordings of the sound around data centers. Log for a week at the property line and at the nearest homes of named facilities with calibrated Class 1 meters, recording A- and C-weighted levels, one-third-octave bands and narrowband spectra, the method that finds the low hum residents complain about. Pair each site with its cooling type.
The briefCredit · unclaimed02
Local decisions outside the US
An open register of local planning decisions on data centers outside the United States: approvals, refusals, withdrawals and pauses, each linked to the council's own decision document, with the stated reasons coded (power, water, noise, landscape, heat reuse).
The briefCredit · unclaimed
Open 01 · the brief
Measured noise at named sites
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
The first standards-grade public recordings of the sound around data centers. Log for a week at the property line and at the nearest homes of named facilities with calibrated Class 1 meters, recording A- and C-weighted levels, one-third-octave bands and narrowband spectra, the method that finds the low hum residents complain about. Pair each site with its cooling type.
Why it is still open
A review by Davide Bray and Francesca Dominici (arXiv, 2 October 2026) graded every published reading from US data center sites and found that "no value summarized in this review meets Tier 1", its grade for peer-reviewed studies with calibrated Class 1 instruments and published spectra. Most figures come from residents' consumer meters.
Built with what exists
Class 1 sound level meters, such as an NTi Audio XL2 with a Class 1 microphone or a Brüel & Kjær 2250, rented or borrowed from a university; the narrowband method in ISO 1996-2; Python with NumPy and SciPy for the spectra; the measurement protocol the review proposes.
First step
Rent one Class 1 meter, log for seven days from public land at the fence line of one data center, and publish the raw files.
Done looks like
Week-long logs at 10 named facilities covering at least three cooling types, each with calibration checks before and after (drift within 0.5 dB, the review's criterion), raw data and spectra published openly, and the tonal peaks listed site by site.
Open 02 · the brief
Local decisions outside the US
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open register of local planning decisions on data centers outside the United States: approvals, refusals, withdrawals and pauses, each linked to the council's own decision document, with the stated reasons coded (power, water, noise, landscape, heat reuse).
Why it is still open
The main tracker of local opposition, Data Center Watch, run by 10a Labs, covers the United States only; its Q1 2026 report counted at least 75 US projects worth about $130 billion blocked or delayed in one quarter. Elsewhere the counts are partial and give no reasons. PlanningAlerts.ie lists Irish applications that mention a data centre over the last three years (16, of which 5 granted and 1 refused) with a status column only. 2580 Group's freedom-of-information requests to English councils found 84 applications at 50 councils, 54 of them approved, without published reasons.
Built with what exists
Councils' public planning portals, starting from the PlanningAlerts.ie list; an AI model that reads long documents in several languages and extracts fields, each checked by a person (see the Note "The jobs agents repeat"); a CSV published under CC BY.
First step
Read the council decision for each Irish application on the PlanningAlerts.ie list and code the stated reasons.
Done looks like
300 decisions from at least eight countries, 2019 to 2026, each linked to its official document, with a 10% sample coded again by a second person and at least 95% agreement.